In the early 1910’s, the City of Indianapolis and the several railroad companies that entered downtown came to an agreement to elevate the tracks connecting to Union Station. But, technically, it was one railroad that was responsible for dealing with doing the work. The tracks leading to the Union Station all belonged to the Indianapolis Union Railway (IU).
The original contracts that were let for the work, as reported in the Indianapolis Star of 28 January 1913, also included a determined elevation level for the tracks and the grade to be put in place.
The story in the Star reported that there were problems in the City Council about the contract, and delays involved with it. The Law Subcommittee, consisting of R. W. McBride, Caleb S. Denny, Ralph Bamberger, Reginald H. Sullivan and Frank E. Gavin, “reported adversely on the contract.” The main concern was that the city would be on the hook for helping to pay for “increasing the facilities of the railroads.” The Council announced that they want to talk to lawyers about this situation.
Now to the specifics of what is to be done. Article Two of the contract laid out grades and elevation levels of the tracks through downtown. The tracks were to be elevated to the level of the railroad bridges over the White River, rising at a grade of 4/10 of a foot per 100 feet eastward to Illinois Street. From Illinois to Pennsylvania Streets, the tracks were to be level. After Pennsylvania Street, the downgrade would be .256 feet per 100 feet to Virginia Avenue. It would go back up .335 feet per 100 feet until the center of Washington Street. The Panhandle (PRR) and Cincinnati, Hamilton & Dayton (B&O) tracks were to descend .7 feet per 100 from East Street to Noble Street (College Avenue). The grade of the wye to connect the Madison line, also part of the Panhandle at that point, would ascend at a rate of .76 feet per 100 from Meridian Street to South Street. From Delaware Street to South Street, the wye would ascend .88 feet per 100.
The street clearances were also laid out in Article two of the contract. The following is what was decided, from the newspaper itself:
Indianapolis Star, 28 June 1913, Elevations for Indianapolis Union Railway tracks through downtown Indianapolis.
Of all the streets that would be affected by the elevation, only one was to be removed from the map of the city of Indianapolis. That street was then called Liberty Avenue. Today, it is called Park Avenue.
What caused part of the problem with the City Council is the idea that the ordinance basically ordering the railroad to perform this work (passed in 1905) stated that the city and county would contribute to the elevation of the tracks. But the city refused to pay for any expansion of railroad facilities during this time. Any expansion of the yard facilities that would occur while the elevation was taking place would be borne by the railroad.
The cost was broken up in the contract as follows: Indianapolis Union Railway pays 75%; the remaining 25% would be shared by the City of Indianapolis, the County of Marion, the Town of Woodruff Place and the Indianapolis Street Railway Company/Indianapolis Traction and Terminal Company (both at this point are owned by the Terre Haute, Indianapolis & Eastern Traction Company).
“It is provided, however, that the railway company alone shall bear the cost of laying the tracks after the elevation is completed.”
The history of the track elevation in Indianapolis was covered in the Indiana Transportation History entry of 7 October 2019 called “Indianapolis Track Elevation.”
1870. Sylvester Johnson and Jacob Julian laid out a town four miles east of Monument Circle on the National Road (or, at that time, the Cumberland Turnpike). They named their town after Washington Irving, hence Irvington. In the fall of 1875, the North Western Christian University moved from its home at College and Home Avenues (now College Avenue and 13th Street) to the southwest corner of Irvington between the Panhandle (Pennsylvania Railroad) and the Junction (Baltimore & Ohio) tracks. At the same time, there was a mule car line being built to the new suburb.
1889 Map of Irvington, Indiana.
The Irvington Street Car line was planned along the following route: From Virginia Avenue and South Street, east on South Street (now Fletcher Avenue) to Reid Street (now State Street), north on Reid to English Avenue, east to English to Butler, north on Butler to Burgess, east on Burgess to Audubon, and north on Audubon to end just south of the Pennsylvania Railroad. The line, according to the Indianapolis News on 25 February 1875, was expected to be in operation in June 1875.
On 2 August 1875, a small paragraph was in the Indianapolis News mentioned “the construction of the Irvington street railway has not come to a standstill, owing to a lack of funds, as stated in the Journal, but on account of the wet weather. The Stratford bridge has been washed away and it is impossible to ballast the track.” Two weeks later, the News reported, in a story about the new college campus, that the Irvington line was quickly nearing completion.
The line opened later in October 1875. The trip from downtown to North Western Christian University, using mule cars, was 45 minutes. It wasn’t long before the Irvington street car line found itself closed to service. A freight train on the Indianapolis, Cincinnati & Lafayette jumped the tracks, causing a large section of the street car line to be ripped up. The IC&L crossed the street car line at English Avenue just east of Reid Street (now State Street). “In consequence no cars are running to-day on that line.”
Some might be wondering why service to Irvington was routed along English Avenue. As mentioned in my last blog post (Toll Roads in Marion County), Washington Street was a toll road outside the city limits. English Avenue was called a “shun pike,” a road that was improved and extended to avoid paying tolls to the toll road companies. That, and I believe that the toll road would have charged the street railways to use the road.
The line route was changed in 1881, when it was removed from Burgess to University Avenue between Butler Avenue and Audubon Avenue. That would be the last change in that line until the power lines stopped being used on 15 August 1934.
The East Washington line was mentioned in the last “Indianapolis Street Car Saturday.” The franchise for the Citizen’s Street Railway East Washington line extension to Irvington was issued on 20 September 1889, the day after the National Road was purchased by the county from the toll road company.
1906. A rural station stop on the Big Four Railroad, originally called Ingalls (or Ingallston), has just been incorporated as a shop town for the same Big Four Railroad. It’s official name at this point became Beech Grove. The new town that grew from the building of the railroad shops, covered in my blog entry “Beech Grove,” found itself barely accessible by anything other than the very railroad that built it. It wouldn’t be long until that would change.
First, the town was actually accessible by route of an old toll road that had been built to reach the farm of a local resident, a Mr. Churchman. That road, for the longest time, had been called the Churchman Pike, even after the county bought it back from the toll road company. The Churchman Pike connected to the town via what would become Albany Street, a survey section line that also acts as the separator between all of the southern townships and the central townships in Marion County. Dirt roads along the other survey lines – which would later become Troy and Emerson Avenues – also led to the area that would become Beech Grove. The old train station, Ingalls or Beech Grove, was at the survey line (Emerson Avenue) and the railroad track. Today, that would be under the Emerson Avenue bridge over the railroad.
But it wouldn’t be long before another method of transportation would make its presence known, and try to work its way into the railroad city. Electric Traction, also known as the interurban, had made its way into Indianapolis, officially, with the opening of the Greenwood line on 1 January 1900. After that, companies started popping up all over the United States. And Indianapolis became a hub for the new transportation form.
But this would create a problem. Steam railroads, which all standard railroads were called at the time, saw the new Traction companies as direct competition. Even though the gauge (width between the tracks) was the same on both, traffic interchange was one of those things that the steam roads were going to keep to an absolute minimum. And since the Traction companies specialized in moving people, this was even more reason for the steam roads to dislike the interurbans.
And now someone wants to add an interurban route to a town BUILT by the railroad? The short answer…yes. The reason for this was actually based in the nature of the steam railroad itself. Passenger trains, taking people from Beech Grove to downtown Indianapolis, weren’t scheduled at very convenient times for citizens of the new town. While the company that had invested in, and created, the town, the Beech Grove Improvement Company, tried running its own special trains to downtown Indianapolis, it was at the whim of the very busy Big Four line from Indianapolis to Cincinnati. In comes the planners of the electric traction.
It started in 1909. A company called the Shore Line Traction Company applied for a franchise to run a traction line from the Indianapolis city limits (point unknown) to Beech Grove. Louis McMains, a real estate agent, put in the petition to the County Commissioners. In October 1909, the petition asked that the Shore Line Traction Company be allowed to use the Churchman Pike from the city limits near Keystone and Churchman Avenues to the corporation limit of Beech Grove. It also asked for some straightening work along the road, and the right of way be widened by 27 feet (adding 13.5 feet on each side). “The petition signifies that the property owners on each side of the pike are willing to part with the necessary land to widen the road.” (Source: Indianapolis News, 14 October 1909)
The county had problems with the widening…especially when it came to the Churchman Pike bridge over Bean Creek (between Walker and Southern Avenues today). The bridge had been in disrepair for years, listed as such as early as 1891. Whether the bridge had been repaired or replaced at this point is unknown. Suffice it to say, the county wasn’t really likely to spend money to replace the bridge.
The petition mentioned that the plan for the Churchman Pike is to widen it to 66 feet, allowing two tracks to be built in the center, with only one track being built to start the company. The new company already had a franchise in hand for the route inside Beech Grove itself.
The Shore Line Traction Company found itself trying to come up with a new route to Beech Grove when the county balked at the Bean Creek bridge. With that, the company was not heard from again.
But shortly after the above petition was filed, a new company would be incorporated – the Beech Grove Traction Company. This company was officially started on 30 December 1909. It had the same goal as the Shore Line Transit Company – connect Beech Grove and downtown Indianapolis.
There was more progress with the Beech Grove Traction than there was with Shore Line. The Indianapolis News of 2 April 1910 reported that the Beech Grove company had elected its corporate officers and announced that grading work would begin soon on the line. Rails, ties and cars had already been ordered. Work on the new Churchman Pike bridge over Bean Creek had begun on 28 March 1910. Officials of the traction company were negotiating with the Indianapolis Traction and Terminal Company “for use of the tracks of the latter company in Shelby Street and Virginia Avenue for entrance to the business district.”
The franchise rights had been awarded by Marion County and the town of Beech Grove. When construction was to begin in April, the company had no agreement with the city of Indianapolis about using the city street railway tracks to enter the downtown area. This agreement would not have been reached until September 1910. This caused construction to be delayed until November 1910.
Even before the track was complete, the first train run over part of the line happened on 20 March 1911. Seven days later, regular service began. The Beech Grove end of the line was on what became Garstang Avenue east of First (Emerson) Avenue. The track then ran north on First Avenue to Main Street. Following Main Street west, it turned north on 17th Avenue (Sherman Drive) for one block, to turn northwest on Churchman Pike (Avenue). The route then turned west on LeGrande Avenue to connect to the city street railway system at Shelby Street.
1917 Map of the route of the Beech Grove Traction Company.
At first, the company found itself very popular. The Beech Grove Traction only owned, at the start, four cars to travel between the two ends. But there were so many people that wanted to use the new train that the company found itself running trains every 40 minutes from daybreak to midnight. The time table showed that first car left for Indianapolis at 0530, with the first car from Indianapolis arriving at 0610. A nickel would get a rider from Beech Grove to Shelby Street and LeGrande. A dime would get you all the way to the Traction Terminal.
Now, one might ask about why someone would get off the interurban at Shelby Street. Rightly so. But a trip to Garfield Park would require a change to a city street car. Or, one could catch the interurban to Greenwood, Franklin, Columbus and even Louisville at the end of the city Shelby Street line…which was at the Greenwood Line Stop 1 at Perry Street, south of Troy Avenue, on Shelby Street.
But business along the Beech Grove Traction line would start falling off rather quickly. The Big Four, with the completion of the traction line, stopped issuing passes to employees and families to ride the steam train. This made the interurban the best way to get to downtown Indianapolis. In the early days, most traffic was Big Four shop employees coming to and from work from their homes in Indianapolis. Due to the success of the town of Beech Grove, these employees were moving to the town. This caused a drop in traffic on the traction line. And due to shops being built along Main Street, the traffic drop wasn’t made up for in shopping trips to the stores of downtown Indianapolis.
By 1914, an average of 24 round trips ran each day along the line, with a schedule of 1 hour 10 minutes between trains. That had slowed down to 16 round trips a day by March 1916. And, as is typical of Indiana railroads of the time, the Beech Grove Traction Company found itself falling into receivership in December 1917, caused by increased costs without the subsequent increase in revenue.
Lawsuits were filed. Newspapers reported that the traction line wouldn’t be necessary for much longer, since with the improvement of city streets, bus service between Beech Grove and Indianapolis would replace the electric traction line. In a strange twist of fate, the operator of the bus competition to the Beech Grove Traction ceased his bus company and took over the traction line as railway superintendent. Fortunes improved…for the time being.
One of the things that the line started was carrying mail from the Fountain Square post office to the post office in Beech Grove. This started shortly after completion of the line until it was discontinued in the late 1920s.
The little line lumbered on for almost two decades after receivership…barely. It was recommended in November 1923 that the line be closed and sold. Revenues increased with the permission given to raise fares. But the company found itself sold to make up $30,000 in debt due to maintenance and new rolling stock in 1925. The new buyer made a condition – if a bus line was approved, the sale would be null and void, and the line would be junked. Again, lawsuits were filed, and a bus line was granted an injunction to operate. And the bus company was purchased by the traction line…and both were operated at the same time. It found itself teetering financially, yet still managing to survive.
The Great Depression hurt the line, just like it did almost everything else at the time. But it managed to survive…for a while. The Public Service Commission of Indiana, on 7 January 1937, officially told the company that it was to close the line. Indianapolis Railways, the power provider for the line, complained to the PSCI that Beech Grove Traction owed in the neighborhood of $20,000 for power…which Indianapolis Railways turned off at 0100 on 8 January 1937. And hence, the end of the Beech Grove Traction line. Some people hadn’t seen the notices about the end of service, and were waiting at stops on a cold 8 January morning.
The last vestiges of the traction company would last until 21 August 1973. The company’s car barn, at First and Garstang, would last until demolition started that day.
In the early 1950’s, much had been done to help with traffic issues throughout the city of Indianapolis. With the exception, as pointed out by the Indianapolis News Editorial Staff on 21 June 1954, of the south side. But things were going to be changing soon. The Indiana State Highway Commission decided that there will be another upgrade to US 31 in the state. This time, in the city of Indianapolis on the south side. But many things not only had to come together to do this project, many controversies were unleashed with the project, as well.
First mention of the project, at least in the newspapers, came in August 1953. The Indianapolis News of 6 August 1953 covered the project on page 23. The $3 million project would lower the roadway of Madison Avenue, at the time US 31, some 20 feet to allow for the road to pass under the Pennsylvania Railroad’s Louisville line and the Indianapolis Belt Railway. A large chunk of the money for the project was to be paid out for the acquisition of properties in the 15 block project area. However, most of the coverage in that day’s News was the fact that the State Highway Commission was creating a “District of Dead Ends.” Apparently, the original plan was to start at Morris/Prospect Streets, working south. It was later decided that the work would begin at Terrace Avenue, leaving that street connected to Madison Avenue at the north end of the project.
However, from Terrace to the Indianapolis Belt Railway, no less than six streets were going to be cut in two. Palmer, which actually connected to Madison Avenue at the Pennsylvania Railroad crossing was sure to be removed. Lincoln would be cut off at the Pennsylvania Railroad. Both Minnesota and Iowa would be truncated, as they both crossed Madison in a straight line. Caven did a stutter step type crossing of the state highway. Adler ended at Madison, just north of the Belt. South of the Belt, LeGrande Avenue stutter stepped its way across Madison Avenue, as well.
While the expressway was the major part of the project, that wasn’t the entire scope. From Southern Avenue, one half mile south of Raymond Street, to where Madison Avenue becomes Delaware Street near what was Wilkins Street (now the I-70 overpass), the road would be widened to a six lane facility. Right-of-way would be purchased on opposite sides of the road, with the section from Southern to Pleasant Run Parkway, and from the Pennsylvania Railroad north to Delaware Street being taken from the east side of the street. Between Pleasant Run Parkway and the PRR, the west side would be taken for the project.
A look at a satellite image of the area today shows exactly how much property was taken in each section. The new Madison Avenue is actually west of Old Madison Avenue. (Old Madison Avenue is one of the very few roads in Marion County that includes a hint that it used to be an important facility. And even then, this only occurred when the new street signs started showing up around the year 2000, because prior to that, the street was officially called “Madison Avenue.”) The old road, which sits along the top of the hill that was created with the new road, is in two sections, the the old Belt Railway crossing removed, connecting where Iowa Street was to Raymond Street. All of the property from the old road to the alley between Delaware Street and Madison Avenue was taken for the new canyon expressway.
As an Indianapolis history aside right here, one of the most famous restaurants on Indianapolis’ south side, the Key West Shrimp House, existed in this section of Madison Avenue. It was half way between LeGrande Avenue and Raymond Street (2138 Madison Avenue). By 1955, due to pending construction, it had moved to its more famous location, 2861 Madison Avenue. Almost anyone, of sufficient age, can tell you about the pink building on Madison Avenue that once housed the Key West. Now, they still have a location…at the other end of the road – in Madison, Indiana.
Not only was the road going to be part of the project, in October 1953, it was announced that the ISHC was going to take a “pedestrian census” to see whether a pedestrian bridge would have to be built somewhere in the project area. Plans were to have pedestrian crossings at both Terrace and LeGrande Avenues. However, the project removed the LeGrande Avenue crossing when the construction was completed. The only true pedestrian specific accommodation made in the project area would be a walking bridge crossing at Palmer Street.
Contracts for the first phases of construction of the new Madison Avenue were announced in May 1954. And while the south side of Indianapolis had always been hampered by narrow roads and railroad crossings, causing it to lag behind the rest of the city, it wasn’t long until newspaper editorial staffs began to realize what was about to become a real problem. The Indianapolis News Editorial of 21 June 1954 spelled it out quite succinctly: this is gonna get bad. “Of course, the Madison Avenue expressway is coming – but there will be a crisis for the south side motorists before the expressway is completed.” With the pending closure of Madison Avenue during construction, something that could last up to two years, an already strained city traffic system would be stretched to the limit. And most of that traffic, according to the thoughts of the Indianapolis News, through Fountain Square. “Cars pile up along Shelby, Virginia and Prospect trying to get through the area. This goes on morning, noon and night.” “One improvement has been made. Woodlawn has been straightened and widened between Virginia and Shelby. But the project primarily has provided more parking space and does not help move traffic.”
It would be in December 1954 that the state announced a change in the construction plans. The original idea was that Prospect and Morris Streets would connect to Madison Avenue as they always had, as shown in this snippet from a 1915 map of Indianapolis. Morris crossed straight over Madison Avenue, with Prospect being almost one block north. It is important to note that both these streets are important arteries in Indianapolis traffic. And, they are survey roads, meaning that their location is along a survey line. (That line is Morris Street west of Shelby Street, and Prospect west of it. Shelby Street is a survey correction line, so every street corrects to the north at or near Shelby Street on the south side.) It was announced that the state would create an underpass for Morris Street, with connecting facilities to allow traffic access to Morris and Prospect Streets. As it turned out, east bound Prospect Street became a very long ramp to allow northbound Madison Avenue traffic access to west bound Morris Street. In the same vein, a slightly moved westbound Morris Street became the eastbound Morris to northbound Madison ramp.
This change, along with the grade separation at Raymond Street that had been announced the previous August, were recommended by the United States Bureau of Public Roads, which provided half of the funding for the project. These two changes added over $1 million to the entire project. Construction on the Madison Avenue expressway was “probably” going to start in 1955. But plans for the new changes hadn’t even been worked out as of the announcement, so no one was quite sure of that.
June 1955 saw the start of getting rid of “the old Shrimp House, 18 homes, and an undisclosed number of garages near Raymond and Madison.” The state would be auctioning off the properties on 28 June 1955. Those properties would have have to be moved within 30 days of the auction. The same day that the auction was announced, it was also mentioned that construction was expect to begin that summer. As it turned out, November 1955 came news that the construction would begin in 1956, as contracts had just been awarded for the project.
That didn’t apply to other locations along the project area. It was announced that the new Madison Avenue bridge over Pleasant Run would be opened to traffic on 29 July 1955. The plan was to open four lanes of the six lane span that day. Since Madison Avenue had been closed, at this point, for almost a year, traffic had been slowed to a crawl anyway.
Indianapolis News, 25 September 1956, showing construction of the Madison Avenue expressway at the Indianapolis Belt Railway.
Another sticking point with the local news media, especially the Indianapolis News, was the lack of security when it came to all the old buildings that were being removed in the construction area. This was especially apparent when it came to the fact that there were three schools in or near the construction zone: School 31 on Lincoln Street east of Madison; School 35 at Madison and Raymond; and Manual High School at Pleasant Run and Madison. There were a bunch of buildings that looked like tornado damage, and more than fair share of basements that were just open to the public without any protection whatsoever.
The article to the left, which was published on 22 March 1956, shows the opinion of the Indianapolis News, and the parents of students in the area. Especially at School 35.
Indianapolis News, 25 September 1956, showing the construction area on Madison Avenue, and expressing the Indianapolis News’ concern about the safety of children in the area. An exact location of this photograph has not been determined, but not for lack of trying.
All wasn’t roses on the ISHC end, either. I will cover it in a later post, but irregularities were exposed in 1957 when it came to property acquirement for the Madison Avenue Expressway project. These irregularities were exposed in April 1957, and found itself in court the following October. It involved someone making a ton of money from real estate purchases and sales in 1954 and 1955. Part of the problem was that these types of shenanigans caused the delay of construction, and hence, an extension of the traffic nightmare on the south side of the city. It was, in June 1957, projected that construction would be completed by September 1958.
That construction projection would be close to true, as the 1959 Indiana Official Highway Map cover shows. The new Madison Avenue Expressway was shown in its brand new, completed, status. But even with the completion of the project, the controversy remained. Stanley T. Siegel, Indianapolis traffic engineer, stated, according to the Indianapolis Star, that the project is a “beautiful road that starts nowhere and leads to noplace.” Mr. Seigel took a lot of criticism for that opinion. The problem is, on the surface, he is absolutely right. What he didn’t take into his consideration is the removal of a narrow, overcrowded street (now Old Madison Avenue), and the constrictions placed on it by two busy railroad crossings (which, at the time, they were very busy), and made a better connection with a very busy United States highway running through south central Marion County.
The Expressway would be completely opened to traffic officially on 23 September 1958. It would still be technically closed for another week for curbing and other details, and the interchange at Morris/Prospect Streets would not be ready for several more weeks after that (for railroad elevation just west of the interchange). The project would cost almost $8 million, more than twice the original estimate. It was also announced that the State Highway Department had plans to extend the expressway another 10 miles. This extension would be along State Road 431, also known as Madison Avenue, in the non-bypassed sections of the old road.