West Marion County and I-465

This image has an empty alt attribute; its file name is images.jpg

The first part of the new beltway (almost) around Indianapolis started on the westside of Marion County. As mentioned in other articles, the original plan was to start Interstate 465 at Interstate 65 on the northwest side, with the replacement for State Road 100 (which I-465 officially was) heading south from there to circle around the county from there. Interchanges were planned at I-65, I-74/US 136, 10th Street, US 36 (Rockville Road), US 40 (Washington Street), Weir Cook Municipal Airport (Airport Expressway), Interstate 70, and SR 67 (Kentucky Avenue). According to USGS topo maps, like that included below, show that there was a stub ramp connecting I-465 to 62nd Street, although the ramp connecting to 62nd Street was listed as still proposed six years later.

1962 USGS topographic map showing the original interchange connection Interstate 65 and Interstate 465.

Construction started along the corridor in 1959. The Indianapolis News ran a series of pictures showing the plans set out by the State Highway Department. If you noticed the list of interchanges above, there were no plans for 56th Street or 38th Street to have ways to access 465. Bridges were to be built over 465 at 56th, 46th, 38th, 34th, and 21st Streets. (21st Street was a very special, and contentious, situation. I covered it in the article: “Building I-465 at West 21st Street. [8 May 2020]”)

Indianapolis News, 14 December 1959, showing the Indiana State Highway Department’s plans for the new Interstate 465 (also still called State Road 100 at the time) at the northern terminus of the highway.

The plans for Interstate 65 at that point were to continue to have it replace US 52 (Lafayette Road). The US 52 bypass at Lebanon was made part of the new I-65. The temporary plan was to connect I-65 just southeast of I-465 directly to US 52 until construction could continue. Then I-65 would also be US 52 from that point to northwest of Lebanon. I mention this only because the loop around Indianapolis was, apparently, easier to get approved than trying to run I-65 through town. (And since it would take another 16 years to complete, even to the point that an addition was planned to I-465 and completed before I-65 through Marion County says it all.)

It wouldn’t take long after the original plans for the interstate were laid down that changes were made. The non-planned 38th Street interchange was added to the deal. It was to be a partial cloverleaf interchange connecting to 38th Street at that point. Marion County had decided to build 38th Street from Lafayette Road east to the new White River bridge to be built by the city. At that point in history, 38th Street was a county road with nothing resembling the connections it has today as a major west side thoroughfare.

Indianapolis News, 11 December 1959, showing the future connection to 38th Street from I-465. This ramp would be built much later, when 38th Street was finally connected as a thoroughfare across Marion County.

The next interchange south of the “gonna be built someday” 38th Street was the connection to another interstate highway, Interstate 74. The plans shown in the Indianapolis News differ slightly from what was actually built. US 136 (Crawfordsville Road) is directly connected to the east end of the proposed interstate connection. This would change. It looks like the proposed interchange was moved slightly north, and Crawfordsville Road west of High School Road was turned north to connect to High School Road. This would be where US 136 would ultimately officially end.

Indianapolis News, 10 December 1959, showing the proposed connection between interstates 74 and 465. The original plan, and this was carried out, is that Interstate 74 would “travel over,” ISHD/INDOT term for multiplex, with I-465 from northwest to southeast Marion County.
1953 Topo map showing the intersection of West 10th Street and High School Road.

The next section did change, at least at one interchange, quite a bit. But before I describe that, let’s talk about the placement of I-465 from Vermont Street north to about where 16th Street would be, if it continued to High School/Girls School Road. The new interstate was planned, in that section, to be built directly over High School Road. This is not really a stretch, since High School Road, from Washington Street south to the Airport, was the original State Road 100. And I-465 was, for all intents and purposes, State Road 100 according to ISHD.

I have written a detailed history of SR 100 (SR 100: How did it come to be? [9 March 2019]) and an article about how, at one point, the connection between SR 100 on BOTH sides of Marion County were to have cloverleaf interchanges (“The Cloverleaf Interchanges at US 40 and SR 100” [20 November 2019]). If SR 100 had been completed on the west side, like it was on the north and east sides, I have no doubt that it would have followed High School Road north, probably, ultimately, to 86th Street, which was SR 100 along the northwest side.

The change in interchanges happened at 10th Street. The original plan was for a full cloverleaf interchange at that intersection. This would have pushed the eastbound 10th Street to southbound 465 ramp back closer to Glen Arm Road, where High School Road was rerouted to miss the interchange. What was ultimately built was a jumbled three-quarter cloverleaf with a flyover from westbound 10th to southbound 465.

In the end, High School Road was basically built over by 465 from Vermont to 10th Streets. 10th Street is a survey correction line, so High School actually moves slightly to the east at that point, as shown in the topo map to the left. For more information about survey lines, check out “Survey Lines and County Roads. (29 March 2019)”

Indianapolis News, 9 December 1959, showing the Indiana State Highway Department plans for I-465 from just south of the New York Central railroad tracks to just north of the Baltimore & Ohio Railroad tracks, including what was to originally be full cloverleaf interchanges at 10th Street and Rockville Road.
1953 USGS topo map of the area of Washington Street and High School Road. The area marked “Ben Davis” would be the location of the new cloverleaf interchange between US 40 and I-465.

From the looks of aerial photos in 1959 as shown in the Indianapolis News, the interchange at Washington Street was going to be very destructive. (Keep in mind that as of the writing of this article, MapIndy, my go to source for historic aerial photos of Marion County no longer offers that service. Maps are available, but the aerial photos are gone.) In addition to the shunting of Morris Street (a survey line and historic route of its own accord), most of where the interchange between US 40 and I-465 was basically what had been the town of Ben Davis.

Another thing would have to happen before this interchange would be built. It was determined, and reported, in July 1959 that an improvement of West Washington Street would have to occur before the interstate reached that point. US 40 was to be widened in the area. The work on Washington Street, however, would have to wait until sewer work in the area was completed…probably in 1961. Plans to widen Washington Street from 40 feet to 68 feet wide, with a four foot median and an eight parking lane on each side, were decided upon. Very little of that plan exists today…and if it does, it’s hard to find.

Indianapolis News, 8 December 1959, showing the proposed area of US 40 and Interstate 465.

The last area covered by the Indianapolis News in the series of articles (actually, it was the first since the editor staff decided to post them south to north, even though the interstate was built north to south!) shows the area of I-465 near Weir Cook Municipal Airport. The one change that I can see is what would become Airport Expressway (check out “Indianapolis’ Raymond Street Expressway” [4 February 2020] for the history of what started out as the Bradbury Expressway) was proposed to connect to the airport heading slightly north of due west, just above Southern Avenue. This section of the (now) Sam Jones Expressway is due east-west at the point it connects to Interstate 465. For a history of what is now Indianapolis International Airport, check out “Indianapolis Municipal Airport.” (20 August 2019)

Indianapolis News, 7 December 1959. This newspaper snippet shows the area of proposed I-465 near the (then) Weir Cook Municipal Airport (now Indianapolis International).

That covers the first of the construction of the State Road 100 replacement. I want to share this one last snippet from the Indianapolis News of 19 October 1960. It shows the construction of I-465/I-65/US 52 at 62nd Street…or the original northern end of Interstate 465.

Indianapolis News, 19 October 1960, showing the original northern end of Interstate 465.

1912 Proposed Indianapolis Street Name Changes, Part 2

Today, I want to continue the list of streets that were proposed to have name changes during the City Council meeting of 4 March 1912. The list was quite long. And most of them didn’t happen. Or if they did, they are long gone now. This is a follow-up to yesterday’s “1912 Proposed Indianapolis Street Name Changes, Part 1.”

The first one today never was completed, but also didn’t retain the name it had before the proposal. Cooper Avenue between Lafayette Road and the line that separates Wayne and Washington Townships (now 38th Street) was to become Concord Street. At the time, Cooper Avenue did end at Lafayette Road. But a relatively straight line due south would connect to Concord Street just north of 16th Street (between 17th and 18th, actually). By 1926, Concord Street would be completed from Lafayette Road to 16th Street (also still known as Crawfordsville Road by some). It would have a name change as well…but not to Cooper. Concord from 16th to Lafayette, and Cooper from Lafayette to 56th (Centennial Road), would be given the name Kessler Boulevard. It is still called Cooper Road between 56th Street (Centennial Road) and 62nd Street (Isenhour Road).

Before the subject proposal, Brightwood’s Depot Street, from Massachusetts Avenue south to 21st Street, and (what looks like) Laycook Avenue (hard to read on most maps) from 21st south to 19th would be renamed Avondale Place. A street that connected Pratt to 16th Street would be built, and, with Avondale Place, would become Avondale Street. This never happened. Avondale Place still exists, and from what I can tell, what was supposed to be Avondale Street south of 16th Street became known as Kealing Street. Avondale Place south of 21st Street would be removed for industrial development. Avondale Place would be ripped in two by the construction of Interstate 70 in the early to mid 1970’s. (The interstate opened to traffic in 1976.)

The next street name change also never occurred. The new name for the many sections of streets would be Chase. It was to include the first alley west of Bloomington Street from Washington Street to White River, Inwood Street from White River to Michigan Street, Kane Street from Michigan to Walnut Street and Dexter Street from 18th to 22nd Streets. I am not sure about the alley, but I believe it went away when White River Parkway was bent to connect to Washington Street outside the new Indianapolis Zoo. Inwood and Kane Streets are long gone, buried under IUPUI concrete. Dexter Street still exists.

Another large number of segments that would be proposed to become one name was Blake Street. At the time, Blake Street existed from the White River end of Washington Avenue (the original path of the National Road and location of the National Road covered bridge over White River until 1904) north to Pratt Street northeast of Indiana Avenue. Dett Street at Southern Avenue, Brooks Street from 10th to 13th Street, Isabella Street from Myrtis to Udell, Fairview Terrace from Haughey Avenue and 44th Street, and Crown Street from 44th to 45th Street were all included in this change. Dett Street no longer exists…but did at the White River end of Southern Avenue west of Meridian Street. The original Blake Street still exists, in sections. It runs through the IUPUI campus today. Brooks Street still exists. Isabella Street would become Franklin Place. The last two sections are near Butler University. Fairview Place still exists to 43rd Street. Crown Street is between 43rd and 44th Street. I would bet that the street numbers were wrong in the proposal, and that 44th was meant to be 43rd, and 45th was meant to be 44th.

Thomas Street between Brookville Road and English Avenue, Mineral Street from 10th to 19th Streets and Brightwood’s Foundry Street would actually be changed…but not immediately due to this proposal. Those streets would be changed to the name that the street along that line had between Washington Street and 10th Street – Denny Street.

There are still more on the list. As the Indianapolis News mentioned in the last paragraph of the story: “These ordinances are a part of about five hundred contemplated changes in street names. It is Copeland’s plan to give a common name to several streets of different names on the same line. The plan has been approved by postoffice authorities.”

Dandy Trail – Revisited

In the early days of the automobile, the Hoosier Motor Club created a scenic tour of Marion County. That tour, an 88 mile journey through the countryside around Indianapolis, was named the Dandy Trail. When one looks at a map, the only part of Dandy Trail that exists by that name is in the northwestern part of the county. And almost none of it was part of the original scenic tour route.

This particular route has been covered by me before in a post called “Dandy Trail.” Jim Grey, another blogger and co-admin of the Facebook companion to this blog, also covered it with his article “It’s 1921, and you’re taking a pleasure drive on the Dandy Trail.” But today, I want to put the Dandy Trail, and its changes, into a historical context.

Starting off with an overview of the section of the original Dandy Trail from about 65th Street south to its original connection with Crawfordsville Road from back in 1953. Above 56th Street, it wandered through the Eagle Creek valley on the west side of that stream. It crossed the creek at 56th Street, then followed the lay of the land on the east side of Eagle Creek. From 56th Street south, it was also mostly a dirt road…never having been improved over its 30+ years of existence.

The connection to Crawfordsville Road was made at what is now called Salt Lake Road, although, as one can tell by looking at the map, that name was actually applied to what is now 34th Street. The current westerly bend of the road, connecting it to the dotted line in the bottom left corner of the snippet, came later. I will cover that. That dotted red line is County Club Road.

The next snippet shows the next point of interest…crossing Eagle Creek. Now, I have shown this several times, but I have not been able to do so with maps that actually show the lay of the land before the reservoir was built.

The northern end of the interest area shows the town of Traders Point. The following snippet is from 1953, as well. Traders Point was located on the old Lafayette Road, just north of Big Eagle Creek.

Historical Topographic Map Collection

Several changes occurred in the path of the Dandy Trail between 1953 and 1967. First, the building of Eagle Creek reservoir. Second, the building of Interstate 74. And, as show in the following map snippet, the almost complete removal of Dandy Trail between 38th and 46th Streets. Also, the southern end was connected to Country Club Road, as it is today.

And as shown in this map, from 46th Street north to the northern end of this particular quad of USGS topo map, most of the original route was either placed in the flood plain, or in the actual reservoir. One can still see the outline of the old bridge over Eagle Creek near 56th Street in the topographical data. At this time, Dandy Trail didn’t connect between 46th Street and 56th Street.

Historical Topographic Map Collection

The northern end didn’t fair much better. Traders Point, a town prior to the building of the reservoir, was no more. But it wasn’t because it was in the reservoir…it was in the flood plain. I will post a link to that particular map to show exactly how much area the reservoir was expected to cover in case of emergency. This particular map shows the area in 1966. The road that is broken by Interstate 65 in the center of the snippet is the original Dandy Trail. Notice that it skirts the northern bank of the reservoir. It is still there today, although accessibility is questionable.

The last image I want to share is the 1967 topo map that had been updated showing conditions in 1980. The purple marks on this map show the updates. A new map was not made, just modifications to the old one. This shows the new Dandy Trail from 38th Street north to 56th Street.

In 1980, 46th Street became Dandy Trail as it turned north toward Eagle Creek Park. Today, that traffic situation is reversed, as 46th Street turns south to become Dandy Trail. Also, the intersection at 38th Street, which was 38th Street ending at Dandy Trail, has been changed over the years to become 38th Street westbound turning south to become Dandy Trail.

Very little of what is called Dandy Trail today is what was originally given that name. But the name survives…as if there is still a connection to the past. The name Dandy Trail seems strange on the Hoosier landscape. But it remains, even if we have to explain why it’s there.

The link to the Traders Point topo map showing the flood plain of the Eagle Creek Reservoir according to the United States Geological Service is this: https://ngmdb.usgs.gov/ht-bin/tv_browse.pl?id=16e9e185f52a80db3128924a7ab11716

I-65 and I-465 On The Northwest Side – A Pictorial History

Today, I want to use MapIndy and USGS Topographic maps to show the progression of the interchange between I-65 and I-465 on the northwest side of Marion, just east of Eagle Creek Park. I am going to have four aerial photos in this entry: 1941, 1956, 1962 and 1972. Also, small snippets of several topo maps are used. Strangely, the 1941 and 1956 are almost identical.

1941 MapIndy aerial photo of the area around the I-65/I-465 interchange on the northwest side of Marion County.
1956 MapIndy aerial photo of the area around the I-65/I-465 interchange on the northwest side of Marion County.
1961 USGS Topographic Map of the interchange between I-65, I-465, and future SR 100, now known as I-465.

The 1961 USGS Topo map shows the pending SR 100 connection. Bridges appear in the 1962 aerial, especially Lafayette Road over I-465. It should also be noted that on the USGS maps, the pending I-465 was also marked SR 100. Also, what is now I-65 fed directly into Lafayette Road at this point. This made sense, since I-65 was the replacement, between Indianapolis and Labanon, of US 52…which followed Lafayette Road in this area.

The next photo is from 1962. The missing section in the picture had not changed much, if at all, from the 1956. The Dandy Trail did not cross Eagle Creek at a right angle to the creek. It had been replaced by a bridge on 56th Street. And the reservoir still hasn’t been built. Both interstates, I-65 going straight through the area, and I-465 veering off to the south, catch the eastern edge of the park like area west of Lafayette Road north of 62nd Street. That park like area is listed on the 1953 USGS topographic map as “Eagle Creek Forest.”

1953 USGS Topographic Map of Eagle Creek Forest.

It should be noted that 62nd Street was completely orphaned west of the interstate when it was built. Reed Road, which at the time before the building of the reservoir and the park ended at 62nd Street, was the access to the orphaned section west of the interstate.

The state had already made plans to make the complete I-465 loop, including between 56th Street north to the north leg. However, it never did get federal approval. If it was going to be built, the state would have to build it not as the interstate, but as a state road. Hence it was decided that the road that I-465 was replacing, SR 100, would be the designation for that section.

1962 MapIndy aerial photo of the area around the I-65/I-465 interchange on the northwest side of Marion County.

The topo map of 1967 (1969 edition) shows the completion of Eagle Creek Reservoir and Park. It shows the area that had been the Dandy Trail Bridge over Eagle Creek. I have included two snippets of that map. The first is the I-465/I-65 interchange, with the proposed SR 100 connection. The Second shows the 56th Street causeway over the reservoir.

1969 USGS Topographic Map of the I-65/I-465/Proposed SR 100 interchange.
1969 USGS Topographic Map of the 56th Street Causeway over Eagle Creek Reservoir.

By the time that the 1972 photo was taken, the Eagle Creek Reservoir and Park was in place. Reed Road, which allowed access to the park area with the circular road, was still in place, but as I recall it had been closed to traffic on the 56th Street end. The Dandy Trail bridge had been replaced with the 56th Street Causeway, mainly because the old road was under water at that point.

The major change, relating to the subject at hand, was the completion and connection of the section of I-465 north of I-65 heading off towards the north leg of the bypass route. That section was built not as part of I-465, but as SR 100. It wouldn’t stay SR 100 long, as the Feds allowed it to become I-465…as long as the state continued to pay 50% of the building cost as opposed to the normal 10%. So, yes, that section of I-465 was a state choice…the Feds approved it after construction was started. This would cut even more of 62nd Street, and High School Road, out of the city landscape. The curve, connecting Lafayette Road to 62nd Street heading east, had already cut the corner of 62nd Street and High School Road off from connecting with anything other than Lafayette Road to the west.

1972 MapIndy aerial photo of the area around the I-65/I-465 interchange on the northwest side of Marion County.

It hasn’t change much in that area since 1972. There are some rumblings of changing the interchange to make it more friendly to interstate-to-interstate transfer. But nothing has come of it.

1917: Main Roads to Fort Benjamin Harrison Need Work

When Fort Benjamin Harrison was built in Lawrence Township, in northeastern Marion County, getting there was quite the chore. It has been built along the Big Four’s Bellefontaine, or Bee, line. This allowed steam locomotives to pass by the new Army post on a regular basis. The Big Four, with its affiliation with the New York Central, could get Army traffic to and from the fort to almost any place in the United States without much effort.

The workforce for the new fort would come on either the Bee line, or the new Indiana Union Traction line that connected Indianapolis to Anderson, Muncie and Fort Wayne. Although it didn’t last much more than three decades, this was an important way to access the fort. The station for that interurban line still exists…and is open to the public as a Mexican restaurant (as of this writing) called the Hacienda.

But automobile traffic was becoming more and more important. Even more important was the transit of Army vehicles to and from Fort Benjamin Harrison. To that end, in the spring of 1917, the commander of the station, General Edwin F. Glenn, sought to get improvements to the road system to the fort. With this in mind, he held a conference with Marion County government and business leaders to share what he had in mind.

The Indianapolis Star, 10 June 1917. Map of the north east side of Marion County, showing improvements needed to access Fort Benjamin Harrison.

First and foremost in the General’s mind was the main road to the fort – the Pendleton Pike. Technically, the Pendleton Pike started at the limits of the City of Indianapolis at Bee Line connection to the Indianapolis Belt Railway just east of Brightwood Avenue (Sherman Drive). West of that point, it was called Massachusetts Avenue. The county had taken over the Pendleton Toll Road in the late 1880s. But little was done for its improvement or maintenance. By the time the Army created the fort, the road was little more than a connection to other roads in rural Marion County and downtown Indianapolis. Many battles were fought about the improvement of the road, lasting past the end of World War I, when such improvements were vital.

The Pendleton Pike, in 1917, was being improved…slowly but surely. The plan was to concrete the road from the Indianapolis City Limits to 38th Street, just west of what is now Shadeland Avenue. From there, the first of the two sections to the fort’s main north-south entrance, would be improved with heavy stone. This would take the heavy stone from 38th Street to the old Noblesville-Franklin State Road, or Franklin Road. The next section would be graveled. This section ran from Franklin Road to the Yerger or Acre Free Gravel Road, now known as Post Road. The section of the Post Road, connecting Pendleton Pike to the interior of Fort Benjamin Harrison, was being hard surfaced with a “special preparation,” according to the Indianapolis Star of 10 June 1917.

The next road to get attention was the “54th Street Road,” connecting west from the fort to Millersville. Those of you from the area might be a little confused. The village of Millersville was along the Fall Creek, just inside the Washington Township border at what is now Emerson Way. The main drag from Fort Benjamin Harrison is now called 56th Street, not 54th. That road was built along the half-survey line starting where the Millersville and Fall Creek Free Gravel Roads come together near what is now Emerson Way at Millersville Road. The highlighted section of the following MapIndy photo, from 1952, shows the original route connecting the Millersville Road to the old Fall Creek & Mud Creek Road. (At the time, what is now Rucker Road continued south of what is now Fall Creek Road. It would be that way until sometime before 1962, when two lakes were built. The Rucker Road extension would finally be taken out sometime between 1979 and 1986.)

The Millersville Road, according to the Indianapolis Star “is by no means a direct route to the fort. It begins at Thirty-eighth street and Fall Creek and meanders northeast about eight miles to the famous Baker’s bridge and thence southeast a quarter of a mile to the fort grounds.” Baker’s Bridge is along the old Noblesville-Franklin State Road, now called Boy Scout Road, in the northwest corner of the Fort Benjamin Harrison grounds. General Glenn wanted the entirety of the Millersville Road covered with gravel…a job that, according to the General, with five wagons in two days. The first three miles of the Millersville Road had already been improved with asphalt. The next half mile being oiled gravel. The rest of the road was gravel…and work was being done at the time to repair damage done by large, heavy, loads transiting the road.

Other roads being worked on for access to the fort were the National Road from Irvington to Acre Road, Emerson Avenue, Arlington Avenue, 34th Street and the Acre Road itself.

At the time, National Road was the actual name of the Washington Street extension outside the limits of the City of Indianapolis at Sheridan Avenue in Irvington. West of Sheridan, it was Washington. East of that point, it was the National Road. The first mile of the National Road, from Sheridan Avenue, was being concreted. That would end near what is now Shortridge Road and Washington Street. The next two miles from Shortridge Road east were already concreted at that time. That would take it to a point east of Acre (Post) Road. The Acre Road, as of 10 June 1917, was closed for construction of a stone road stretching five miles north to the Pendleton Pike and into the fort.

Emerson and Arlington Avenues were also under construction at the time. Both were being concreted from Washington Street (both are west of Sheridan Avenue) to the Pendleton Pike. Emerson Avenue met Pendleton Pike at roughly 30th Street. Emerson Avenue, at least the southern section of said, ended at the Bee Line. Neither 30th Street nor Emerson Avenue crossed the railroad tracks, and passage past those tracks was done at an underpass on 32nd Street.

Arlington Avenue meets Pendleton Pike (now Massachusetts Avenue) at 34th Street. Improvements along 34th Street included asphalt paving from the Lake Erie & Western (Nickel Plate) Railroad crossing for three miles to the east to what was the northern section of Emerson Avenue. From there to Arlington Avenue, 34th Street was a stone road. Prior to being called 34th Street, the road was the Fall Creek & Warren Township Free Gravel Road.

It would take some time until the roads were improved for to the General’s liking. With the creation of the Indiana State Highway Commission in 1917, the National Road was taken over as Main Market Road #3. It wouldn’t be until 1923 that the Pendleton Pike would find itself part of the state highway system, entering that system as Original State Road 37. By then, the war was over, and traffic to Fort Benjamin Harrison had, while not stopping completely, had slowed considerably as it normally does after the completion of a war. The fort would, eventually, get its connections to the road system other than SR 67/US 36 (Pendleton Pike). In 1941, 56th Street west out of the fort would become part of SR 534, a designation it would only hold for a few years before that state road was routed straight down Shadeland Avenue. With the building of the Interstate system, which was technically built for the defense of the United States, Fort Benjamin Harrison would find itself with two exits from I-465 (Pendleton Pike and 56th Street) and one on I-70 (Post Road). I suppose the Post Road exit on I-74 could technically be listed as part of that…but it is quite a distance from the Fort.

The Building of I-465

The building of the Indianapolis bypass, Interstate 465, involved a lot of pieces to fall together. Property acquisition was a big part of that. Then came the money involved in building the interstate in the first place.

The Indianapolis News, on 14 December 1959, published the above photograph showing the first section of Interstate 465 to be built. It was already under construction when the article was published. Two contracts, on for the 46th Street overpass ($149,968.03) and the 56th Street overpass ($168,178.51) had already been signed. It is mentioned in the caption that “design work hasn’t been completed on the Interstate 64-465 cloverleaf interchange, although a $582,836.95 bid has been received for part of the work.” One wonders where that cloverleaf might have been.

Even before that, it was announced in the Indianapolis News of 30 April 1959 that the contract had been let for the grade separation (bridge) for 34th Street over the new interstate. What is of particular note is the line “over west leg of new Ind. 100, to be renumbered Interstate 465.”

Late 1962 would be the planned bidding date for a contract to build a new interchange in the already completed northwest leg of I-465. At the time, 38th Street was being extended and improved across northwestern Marion County. It was decided by the Highway Commission to create a diamond interchange where 38th Street crossed over I-465. At the time, there were no interchanges on the northwest side between I-74/US 136 and I-65.

Indianapolis News, 08 August 1962, showing progress on I-465 construction through Beech Grove.

The end of November, 1962, saw the announcement of a $3,197,216.11 contract to build the interstate from Meridian Street to Carson Avenue on the south side of Marion County. This contract was let on the same day they were opened. This was to allow for quicker construction of the bypass. Also, this was to give the contractor as much time as possible to complete construction before the deadline on December 1963. The 2.3 miles of new road and five bridges involved in this section of interstate would bring the highway to almost the pending interchange at I-65.

Another contract had to be let in this section when it was realized that the banks of Lick Creek, with the interstate built on both sides near Carson Avenue, had to be reinforced. To the tune of $298,014.40. The creek, as of 21 April 1964, had eroded its bank the previous winter requiring the building of additional slope walls and revetments to keep the creek where it belonged between the two directions of I-465.

In 1963, a contract bid to build the large interchange on the south side of Marion County between I-65 and I-465 was one of the bigger contracts. The project involved eight bridges and two miles of pavement to connect two of the sections that were already under construction or completed. The low bid on that particular contract was $3,507,672.18 by McMahan Construction Company of Rochester and R. L. Schutt Construction Company of Indianapolis. This bid was announced publicly on 20 April 1963.

Indianapolis News, 24 July 1967, showing the construction progress of the 56th Street bridge over (future) I-465.

The first contract to be opened up after the Fall 1964 completion of I-465 between I-74 and SR 100 (Shadeland Avenue) was the bidding, starting 25 May 1965, of a single bridge over US 52 (Brookville Road) and the Baltimore & Ohio railroad tracks on the southeast side of the county. This contract, and the rest of them connecting I-74 to US 40 on the east side had been on hold due to right-of-way difficulties. Norman F. Schafer, executive director of the State Highway Commission, commented that the summer of 1965 would be the first time in more than four years that no major construction was underway on the beltway.

Indianapolis News, 24 August 1967. Construction underway on the north leg…and a proposed SR 100 connecting the west leg at I-65 to the north leg west of Zionsville Road. This section would be built as SR 100, but like the rest of the route, would become part of I-465, causing confusion for over two decades with the “dog leg.”

The north and northeast legs of I-465 would be the hardest to complete. So much so that in July 1968, the Noblesville Ledger ran photos of the construction of the interstate through the small section of Hamilton County through which it passes. It is mentioned that the “State Highway Department schedules call for ‘phasing out’ I-465 construction from it western link with I-65 east to White River by the first winter freeze. However, I-164 from just north of Fall Creek northwest to White River will not start this year.” I would share the photos from that newspaper, but they are very dark and hard to see.

Indianapolis News, 17 March 1960. Proposed new route for the north leg of I-465 through Boone and Hamilton Counties.

I would be remiss if I didn’t mention one “might have been” on this entry. I found this map of another proposal for the north leg of the bypass. On 30 Janaury 2020, I wrote “Alternate Routes for I-465 on North Side of Indianapolis,” but didn’t find this map. I thought it appropriate to share it here.

The Beginning, and End, of SR 534

As the Indiana State Highway Commission’s inventory of state roads was growing, the thought of putting a bypass around the city of Indianapolis hit the planning sheets. The original plan started appearing on official highway maps in 1932. But little would be done for almost a decade. In 1941, the start of a bypass road was contracted…and built. But there was more to it than just a section along the east side from Fort Harrison to Nora.

Yes, that’s right. From Fort Harrison to Nora. The original road that was started in 1941 followed 56th Street from Fort Harrison out to a new construction road along what was, and still is, the Shadeland corridor. At the time, it was Shadeland Road. But that corridor only ran from 10th Street to 56th Street, creating a dead end road north of 56th Street into the Woolen Gardens. A complete history of the road is available as “SR 100: How did it come to be?

The Indianapolis News, 24 July 1941
Legal notice for contract to build SR 534 from
56th Street to Castleton.

Things started happening on the bypass route in 1941, when the first contracts were let. As is typical of the ISHC at the time, the road was contracted separately from the bridges. The first contracts for the road were let in July 1941. The legal notices were published for the contract, as shown on the left. The bids were to be in the hands of the ISHC by 5 August 1941 at 10 AM Central Standard Time (the time zone Indianapolis was in at the time). The plan was for a reinforced concrete road surface north from 56th Street to the old state road that turned west along what is now 82nd Street.

The bridge over Fall Creek was let out for contract in September 1941, with the description “structure on State Road 534” details as a five span arch bridge “over Fall Creek, 2.7 Mi. North of Lawrence.” Those spans were to be, in order: one at 40 feet; three at 80 feet, and one at 40 feet. The bridge was to be of reinforced concrete arch design. Bids were to be at the ISHC by 10 AM CST on 7 October 1941.

The next leg of the road was published for contract in December 1941, with a due date of 16 December 1941. It was to include 4.578 miles of reinforced concrete from Nora to Castleton. (For the route prior to SR 534 construction, check out 82nd and 86th Street Before SR 534 (SR 100).) This would complete the first opened section of SR 534 in Indiana.

Then World War II started.

The Indianapolis News, of 21 December 1942, opined that the ISHC was in a holding pattern when it came to the building of the bypass road. The road was not mentioned by number, but the route was discussed. “One link, approaching Ft. Benjamin Harrison by way of Allisonville and Castleton, has been completed and is in use. The belt highway, discussed for years, will extend south, intersection Roads 40, 52 and 29, until it reaches the Thompson Road, where it will continue west, intersecting Roads 31, 37 and 67.” With the Shadeland Road corridor only extending as far as 10th Street, this would require the acquisition of right-of-way and building of four miles of new road from 10th Street to Troy Avenue/Southeastern Avenue/SR 29. South from here, the road was already in place as the Five Points Road.

“At Valley Mills it will turn north, crossing roads 40, 36 and 34, eventually intersecting Road 52, where it will join the northern east-and-west link that has been built.” This would put the road along the High School Road corridor on the west side. This would also include a state road that connected US 40 to the Indianapolis Municipal Airport. That state road was designated SR 100 when it was commissioned.

“The practical value of such a construction program has long been recognized, both for ordinary traffic and for commercial vehicles that will be enabled to by-pass Indianapolis without contributing to traffic congestion be traversing the downtown streets.”

The article concluded as follows: “A belt line around Indianapolis has been considered ever since the old days of the “Dandy Trail” when gravel roads were marked and motorists wore linen dusters. The successor to that trail is one of the numerous tasks that are being held in abeyance until the war is won.”

The designation of SR 534 would be applied to the east leg from Washington Street north to 82nd Street, then along the 82nd/86th Street corridor to SR 29, Michigan Road. In the summer of 1949, the following was published in the Indianapolis News: “Some of our highways are known by name as well as number. Thus the route called State Road 534 could be more easily found if you called it Shadeland Drive. This road, leading north from Road 40, east of Indianapolis, intersects with Roads 31, 431, 37, 52 and 29 and is part of what, some day, will be a belt line around the city. But what we started out to say is that on the new Indiana highway maps it is 534 no longer. The new number is 100.”

And with that, the ISHC removed one of the “daughters” of State Road 34, stretching the SR 100 designation from a short section of High School Road to the entire bypass. Or, at least, the sections that would be completed before it was entirely replaced by Interstate 465.

State Highway Department Construction Plans for 1963-1965

On 14 November 1961, the Indiana State Highway Department announced its plans for the construction projects for the two year period between 1 July 1963 and 30 June 1965. The two year project between 1961 and 1963 was planned to cost $268.3 million. The 1963-1965 plans would cost slightly less, at $235.2 million. The projected construction would build 408.06 miles of roads across the state.

Of that 408 miles, almost 154 miles of that would be for the interstate highway system. Put on the books to be built in that time was most of Interstate 69 in Indiana. Nearly 103 miles of that road, from Pendleton to the Indiana Toll Road, were to be placed under contract and built starting in July 1963. It would focus on two sections: Pendleton to southwest of Fort Wayne; and US 6 to the Toll Road.

Another interstate project, accounting for 17.7 miles of road, included Interstate 74 from Lizton to Crawfordsville. This was a continuation of the interstate from its then end at Lizton, which would be opened in the fall of 1961 from I-465’s west leg to Lizton.

Another interstate project included in the plan was that of Interstate 65 in Lake County from the county line to the toll road. This project included 22.7 miles of new interstate highway.

David Cohen, State Highway Commission chairman, stated that the construction of connections with I-65 and I-69 would help the “financially-ailing toll road.” In addition to the new interstate connections, the Toll Road Commission would be helped by their own lobbying. The Highway Commission had been put under pressure to slow construction on the Tri-State Highway, a toll free alternative to the turnpike. No projects involving the Tri-State were listed in the 1963-1965 plans.

Marion County would have its share of projects in the Construction Program. Interstate 465 would be the biggest recipient. Construction of the highway from Raymond Street to 56th Street was the largest part of the plan. Also, if the design and location of the east and north legs (from 56th Street to I-65 near Whitestown) was approved by federal officials, preliminary engineering and right of way acquisition would be conducted as part of this program.

At this point, the rest of I-465 (west and south legs) was opened, under construction, or in the 1961-1963 program. The plans for the east leg included 21 road and railroad grade separations and a bridge over Pendleton Pike (US 36/SR 67).

Three preliminary engineering projects involving the Marion County interstates were also included in the 1963-1965 program: I-65 north and west from 16th Street west of Methodist Hospital; I-69 from Pendleton to the north leg of I-465; and I-70 from I-465 west leg to West Street. Cohen mentioned no time table for the beginning of construction of the interstates in Indianapolis, but said that a section of I-65 from 38th Street north and west could be part of the 1965-1967 program.

There was a lot of other projects on the 1963-1965 program. SR 67 from Martinsville to Mooresville was to be expanded into a divided highway, and some of the kinks were to be eliminated. The new SR 37 from the south leg of I-465 to 38th Street, and divided highway treatment for 38th Street from Northwestern Avenue/Michigan Road to Capitol Avenue were also included. The SR 37 project was never completed.

A new SR 431 was also planned, starting at the north leg of SR 100 (86th Street) to US 31 at the north end of Carmel. This project would tie the new SR 431 to US 31 near the junction with the then current SR 431. At the time, SR 431 was Range Line Road/Westfield Blvd. The new SR 431 would become known as Keystone Avenue…now Keystone Parkway through Carmel.

Indianapolis News, 14 November 1961. This map shows the extent of the 1963-1965 State Highway Department Construction Program. Solid black lines show the 1963-1965 plans. Dotted lines show the 1961-1963 plan.

Bicycling Marion County, 1900, Part 2

Today is part two of two of covering a map I found on the Indiana State Library website about bicycling in Marion County, and the routes that were available.

Bluff Road: The direct route to Martinsville, Bloomington and points south. It was named after the Bluffs of the White River at Waverly. It was one of the first trails to connect to the Hoosier Capitol, as a lot of settlers would start their journey into Marion County from Waverly.

Clifford Avenue Pike: The extension of 10th Street past the city limits. The bicycle route ended at what is now Arlington Avenue, which connected Clifford Avenue to National Road and Brookville Pike.

Flackville Pike: The town of Flackville was created near what is now 30th Street and Lafayette Road. The Pike leading to the town is an extension of Indianapolis’ 30th Street.

Madison Road: The Madison-Indianapolis State Road, which the later Madison & Indianapolis Railroad would closely follow. Today, Madison Road is now Madison Avenue.

Millers Pike: Today known as Millersville Road, since that is where the road ended. A connecting route back to the White River & Fall Creek Pike used what is now 56th Street.

Myers Pike: This road would, in later life, become Cold Spring Road, connecting the Lafayette Road to the Michigan Road on the west (north) side of the White River.

Pendleton Pike: The old (1830’s) state road to the Falls of Fall Creek, where the town of Pendleton was formed. The old road went through Oakland (now Oaklandon), instead of basically around it like it does now.

Rockville Pike: The original Indianapolis-Rockville State Road. Still called Rockville Road for most of its length today. The old road is hard to navigate at its original beginning, since it was removed when Holt Road was built north of Washington Street. Rockville Avenue is the old road.

Shelbyville Road: The original state road to the seat of Shelby County. Its importance dropped off after the building of the Michigan Road. Near the current intersection of Shelbyville Road and Stop 11 Road/Frye Road, a branch took riders to Acton. At Acton, a branch from the Michigan Road came from the north.

Spring Mills Pike: The original path of Spring Mill Road started at the city limits on Illinois Street, crossing the White River near where Kessler Boulevard does today. It then continued up what is now Spring Mill Road into Hamilton County.

Sugar Flats Pike: The continuation of Central Avenue outside the city limits up to the Central Canal towpath, then following what is now Westfield Boulevard through Nora and into Hamilton County. The bike path led, after leaving Marion County, to the downtown area of Carmel.

Three Notch Pike: What is now Meridian Street was, for around a century, known as the Three Notch Road. The bicycle route followed Meridian Street from the Bluff Road intersection down to the county line.

White River and Fall Creek Pike: Labeled on the map as the White River and Eagle Creek Pike, this old road turned bicycle route followed the continuation of Keystone Avenue past the city limits to its end at River Road. Keep in mind, what is now Keystone Avenue north of White River was built by the state as a replacement for SR 431, which used to use Westfield Boulevard.

Bicycling the Lafayette Road

Bicycle Routes as published on 02 May 1896 in the Indianapolis News. (image courtesy of newspapers.com)

The Indianapolis News, in its bicycling routes series, on 02 May 1896, covered leaving Indianapolis via the Crawfordsville Pike and the Reveal/Centennial Pike. This would bring the “wheelman” of the day through what is now Speedway out to and along the Eagle Creek valley to the town of Trader’s Point. That town was, before the building of the Eagle Creek Reservoir, was located at the crossing of Big Eagle Creek by the White River and Big Eagle Creek Pike, which was built as the Indianapolis-Lafayette State Road. Today, that name has been shortened to Lafayette Road.

After turning southeast along the road out of Trader’s Point, the road crosses the Big Eagle Creek then climbs a “stiff hill.” “After climbing this hill the road is undulating for some distance until the valley of the Big Eagle is left far behind.” Before leaving the hilly area, one half mile from Trader’s Point, is a “pump at the roadside all by itself. The water is very good.” One mile from “the Point” is a dirt road that crosses the Pike west to east. That dirt road, to the east, turns into the New Augusta Free Gravel Road, connecting to the town of that name, the Michigan Road and ending at the Spring Mill and Williams Creek Free Gravel Road.

Two miles from Trader’s Point “is a grocery store and blacksmith shop, where one dirt road turns north and another runs east and west. There is a little settlement at this cross-roads and a pretty white church with a green pump in the church yard.” The road to the north is now Shanghai Road. The east-west road, running from a road on the east side of Big Eagle Creek to the Michigan Road, first became Isenhour Road. That would be changed to 62nd Street with the renumbering of Marion County. There are no remnants of that “little settlement,” as the construction of Interstate 65 wiped out the intersection of 62nd Street and Lafayette Road.

From the settlement southeast, Lafayette Road is “much more level.” The first two roads encountered are the Kissell Road (became High School Road, now gone with the same I-65 construction) that heads south and the Centennial Road (running from the Reveal Road to the Michigan Road at Crooked Creek, now known as 56th Street). One half mile later, the Zionsville and Pike Township Free Gravel Road leaves heading north. That road is now Moller Road from north of 52nd Street to 62nd Street. When it was built, it was part of the Zionsville Pike.

Just southeast of the Zionsville Road junction is a post office town called Snacks. Here there is a white church, store, blacksmith shop, brick schoolhouse, and several houses. Next, the bicyclist would encounter the Russe Road, also known as the Reveal and Russe Free Gravel Road. The east end of this road is at the Lafayette Pike. The west end of this road is at the Crawfordsville Road, at a point one mile east of Clermont. The end at Lafayette Road is now known as 46th Street.

South of what is now 46th Street the Lafayette Pike jogs a little to the due south then more east than southeast, and back to the original line of the road. Those turns are shown in the 1941 aerial photograph to the left. (Image courtesy of MapIndy, a service of the City of Indianapolis.) The News mentioned, also, that the Little Eagle Creek comes very close to, and even parallels, the Lafayette Pike at this point.

The article reports that the road gets into better condition as it gets closer to the city. The next Post Office town encountered is Flackville, located at what is now Tibbs Avenue and Lafayette Road. Before that point, two schoolhouses, one with a green pump in the yard, and two uninviting dirt roads. Those roads, the first heading east, is now 38th Street, and the second heading west in now 34th Street.

At Flackville, several roads are encountered. The Guion Gravel Road turns north towards its end at New Augusta. The Flack Road, now 30th Street, crosses west to east. From here, the rider can follow the Flack Road east to the Michigan Road and back to the city. Continuing along the Lafayette Pike, what is now Tibbs Avenue crosses the road north to south. South of Pike is the Marion County Poor Farm.

Before reaching the Crawfordsville Pike at Emrichsville (now 16th Street), the Lafayette Road encounters the Cooper Avenue Free Gravel Road (now Kessler Boulevard) and the Meyers Free Gravel Road (now Cold Spring Road). The Meyers Road connects to the town of Brooklyn Heights and the Michigan Road near Mount Pleasant (Alliance Post Office).

At Emrichsville, the historic Lafayette and Crawfordsville Roads combine for the trip back to the center of Indianapolis. Both roads crossed the Emrichsville Bridge and followed what is now Waterway Boulevard (see The Lafayette State Road In Downtown Indianapolis). Historically, the Crawfordsville and Lafayette Roads both began at the Michigan Road.

The complete trip, as listed in this article was measured at 32 miles. This included the round trip that went out the Crawfordsville Pike, north along the Reveal and Centennial Roads, and back the Lafayette Road.

Bicycling Indianapolis

In 1896,the Indianapolis News published a series of articles about bicycling in and around Indianapolis. That series of articles is what I have been using to create these “Bicycling Thursday” series of posts here at Indiana Transportation History. These articles generally have covered riding different roads, usually old state roads, leaving Indianapolis. I will include links to all of those below. But this article is about something different. There was a proposed bicycling route that covered quite a bit of the north side of the city and Marion County.

Today’s information comes from the Indianapolis News of 14 March 1896. This plan was to be financed via the sale of subscriptions, much like the way that roads were paid for before this, and how Auto Trails, starting in the 1910’s, were going to be financed afterwards. Most of the route wouldn’t use roads in place. Where it did use roads, it would be built along side that road. Most of the route would make use of riding on the banks of water courses through the county.

Proposed bicycle route through Indianapolis and Marin County as described in the Indianapolis News of 14 March 1896.

The potential route started along Indiana Avenue in downtown Indianapolis. It would follow that road to where it crossed Fall Creek. It is mentioned in the News that the condition of Indiana Avenue, at that time, from West Street to Fall Creek, is such that “no worse road was found in going over the entire course than in this street.” The path would then follow the levee along the north bank of Fall Creek “south of the new pumping station of the Water Company.” The proposed route would continue along Fall Creek, then the east bank of the White River until crossing the Indianapolis Belt Railway. Here, the bicycling route would join the Crawfordsville Free Gravel Road until that road crossed the White River. The Crawfordsville Free Gravel Road is now Waterway Boulevard (after having been named Speedway Avenue), and it crossed the river at the Emrichsville Bridge, later replaced by the current 16th Street bridge.

The proposed path would then continue to follow the White River until after it crossed the “Flack Pike,” now 30th Street, passing “many giant sycamores, winding in and out with the deviation of the stream.” Just north of the Flack Pike the river and the Central Canal come close to one another, where the proposed route would switch over to the tow path along the north bank of the canal on its way to Broad Ripple.

“The ride up the tow-path every wheelman and wheelwoman in the city is familiar with – its beauties, its dangers and it tribulations often.” It is described as a beautiful ride. However, washouts, gullies, chuck holes and soft spots are common along the way, “and a sudden dip into the canal has a most dampening effect on enthusiasm.” The tow path continues through Fairview Park, now the site of Butler University. There is a fairly steep climb before the path would cross Illinois Street. Here, a bicycle rider could choose to use either side of the canal to get to Broad Ripple. But the official route would continue along the north tow path.

At Broad Ripple, the path would follow the Westfield Pike north past the Broad Ripple damn and across the White River on a large iron bridge. After crossing the river, the path then turns south to follow the river along the north/west bank to a point where it crosses White River again at what is now the 82nd Street crossing after passing the Haverstick Farm. After crossing White River, it would follow what was then the Fall Creek and White River Free Gravel Road (FCWRFGR) back towards the city. The first part of that free gravel road doesn’t now exist above what is now 79th Street. From there, it is known as River Road to the point where the FCWRFGR turned south on what is now Keystone Avenue.

The new path would be built along the FCWRFGR until it got to Malott Park, at what is now 56th Street. The route would then turn east “on the dirt road from Malott Park to Millersville.” It is mentioned that this dirt road is very narrow in places, with “scarcely room on either side for the path.” Here, the builders of the route hadn’t decided whether to follow Fall Creek’s north bank or the Millersville Free Gravel Road and the south bank of Fall Creek to Meridian Street. Here, riding down Meridian Street would bring rider back to downtown Indianapolis, and the point where the route started.

Some of the path, as described, has, in more recent times, been added to the Indy Parks trail system. It starts on what is now the White River Trail. It then crosses over to the Central Canal Trail above the old Riverside Amusement Park north of 30th Street. At Illinois Street, where the rider in 1896 had two choices, the path chosen by Indy Parks runs along the opposite bank of the Canal than was chosen to be followed then. Most of the rest of the route, that can still be traveled, can be followed by using the streets that exist now. There are a few places where this can’t happen.

The following is a list of the other entries in this “Bicycling Thursday” series.

Indianapolis and Its Decoration Day Race
Allisonville Pike (Allisonville Road to Noblesville)
Crawfordsville Pike (Old Crawfordsville Road to Crawfordsville)
Madison Road (Madison Avenue from Southport to Indianapolis)
Michigan Road North (MLK/Michigan Road north to Augusta)
Michigan Road South (Southeastern Avenue)
National Road West (Washington Street west to Plainfield)
Pendleton Pike (Pendleton Pike to Oaklandon and beyond)
Reveal Road (Dandy Trail through Eagle Creek valley)
Rockville Road (Old Rockville Road from Danville to Indianapolis)
Shelbyville Road (Old Shelbyville Road from Indianapolis to SE Marion County)
Three Notch Road (Meridian Street south to Southport Road)
Westfield Road (Westfield Boulevard and Illinois Street from Westfield south)

Bicycling the Reveal Road

In the Indianapolis News issue of 02 May 1896, the paper was continuing a series about traveling around Marion County, and beyond, on bicycles. At the time, that was the latest, greatest thing. Most people don’t realize that bicycles were the starting point to getting the government involved in making better roads, something that helped when cars and trucks started showing up in great numbers. That particular issue of the News started by covering the Crawfordsville Pike, which was covered again, and better, one week later on 09 May 1896. But it was the route back to the city that differed between the two.

The focus of today’s post is one part of the return trip. Most of the trip back was done on the Lafayette Pike, now known as Lafayette Road. But connecting the two major pikes was a gravel road that started at the Crawfordsville Pike as the Reveal Road. The Reveal Road is at the base of a large hill on the Crawfordsville Road one mile east of Clermont.

“The Reveal road soon gives evidence of what it is. The rider has an opportunity to test his coasting powers right at the start, for, after climbing a short hill, it wings down a lone, but not very steep, decline to Big Eagle creek.” This road no longer exists in the form it did then. It has been moved several times over the years, especially when Interstate 74 was built through the area. At the bottom of the hill, a bridge crosses over the Big Eagle Creek along what would become the 34th Street corridor. (This bridge, or its replacements, would disappear when I-74 was built and 34th Street was turned to the northwest to connect to Dandy Trail.)

“The bridge is a good one, but, as there had been fresh gravel placed on the road just beyond the bridge, it might be well to slow up a bit in going over.” From here, the road travels east for a little bit then turns north. Here, the road meanders its way through the Big Eagle Creek valley. It ran along a hillside, a short distance from the creek itself.

A mile and a half after crossing the bridge, a road turns due east to connect to the Lafayette Pike. While this road is now known as 46th Street, which ends at both Dandy Trail and Lafayette Road, in 1896 it was known as the Russe Free Gravel Road. It is noted that the Russe Road is in good condition, but very hilly.

The Reveal Road continues north and north west along the Eagle Creek valley until it met the Centennial Pike, which is now 56th Street. Between the Russe and Centennial Pikes, the Reveal is dirt. As with the Russe, the Centennial connects eastward to the Lafayette Road. The Centennial Pike ended at the Reveal Road, which crossed Eagle Creek heading north.

Much is made in the article about the beauty along the Reveal Road as it winds its way from basically 34th Street to near 79th Street through the Big Eagle Creek valley. The route is relatively flat, easy to ride, and plenty of shade along the way. The Reveal Road itself would connect to the Lafayette Pike along the north bank of the creek. Here, it entered the village of Trader’s Point. The village has been moved, this being a result of the creation of the Eagle Creek Reservoir.

For those that have been following Indiana Transportation History through this blog, you probably recognize the path of the old Reveal Road. It, like the original location of the village of Trader’s Point, has been long gone. Again, the creation of Eagle Creek Reservoir is to thank for this. But, before the making of the reservoir, some 30+ years after this bicycling article, this entire section was included in the driving tour around Marion County: Dandy Trail.