West Marion County and I-465

This image has an empty alt attribute; its file name is images.jpg

The first part of the new beltway (almost) around Indianapolis started on the westside of Marion County. As mentioned in other articles, the original plan was to start Interstate 465 at Interstate 65 on the northwest side, with the replacement for State Road 100 (which I-465 officially was) heading south from there to circle around the county from there. Interchanges were planned at I-65, I-74/US 136, 10th Street, US 36 (Rockville Road), US 40 (Washington Street), Weir Cook Municipal Airport (Airport Expressway), Interstate 70, and SR 67 (Kentucky Avenue). According to USGS topo maps, like that included below, show that there was a stub ramp connecting I-465 to 62nd Street, although the ramp connecting to 62nd Street was listed as still proposed six years later.

1962 USGS topographic map showing the original interchange connection Interstate 65 and Interstate 465.

Construction started along the corridor in 1959. The Indianapolis News ran a series of pictures showing the plans set out by the State Highway Department. If you noticed the list of interchanges above, there were no plans for 56th Street or 38th Street to have ways to access 465. Bridges were to be built over 465 at 56th, 46th, 38th, 34th, and 21st Streets. (21st Street was a very special, and contentious, situation. I covered it in the article: “Building I-465 at West 21st Street. [8 May 2020]”)

Indianapolis News, 14 December 1959, showing the Indiana State Highway Department’s plans for the new Interstate 465 (also still called State Road 100 at the time) at the northern terminus of the highway.

The plans for Interstate 65 at that point were to continue to have it replace US 52 (Lafayette Road). The US 52 bypass at Lebanon was made part of the new I-65. The temporary plan was to connect I-65 just southeast of I-465 directly to US 52 until construction could continue. Then I-65 would also be US 52 from that point to northwest of Lebanon. I mention this only because the loop around Indianapolis was, apparently, easier to get approved than trying to run I-65 through town. (And since it would take another 16 years to complete, even to the point that an addition was planned to I-465 and completed before I-65 through Marion County says it all.)

It wouldn’t take long after the original plans for the interstate were laid down that changes were made. The non-planned 38th Street interchange was added to the deal. It was to be a partial cloverleaf interchange connecting to 38th Street at that point. Marion County had decided to build 38th Street from Lafayette Road east to the new White River bridge to be built by the city. At that point in history, 38th Street was a county road with nothing resembling the connections it has today as a major west side thoroughfare.

Indianapolis News, 11 December 1959, showing the future connection to 38th Street from I-465. This ramp would be built much later, when 38th Street was finally connected as a thoroughfare across Marion County.

The next interchange south of the “gonna be built someday” 38th Street was the connection to another interstate highway, Interstate 74. The plans shown in the Indianapolis News differ slightly from what was actually built. US 136 (Crawfordsville Road) is directly connected to the east end of the proposed interstate connection. This would change. It looks like the proposed interchange was moved slightly north, and Crawfordsville Road west of High School Road was turned north to connect to High School Road. This would be where US 136 would ultimately officially end.

Indianapolis News, 10 December 1959, showing the proposed connection between interstates 74 and 465. The original plan, and this was carried out, is that Interstate 74 would “travel over,” ISHD/INDOT term for multiplex, with I-465 from northwest to southeast Marion County.
1953 Topo map showing the intersection of West 10th Street and High School Road.

The next section did change, at least at one interchange, quite a bit. But before I describe that, let’s talk about the placement of I-465 from Vermont Street north to about where 16th Street would be, if it continued to High School/Girls School Road. The new interstate was planned, in that section, to be built directly over High School Road. This is not really a stretch, since High School Road, from Washington Street south to the Airport, was the original State Road 100. And I-465 was, for all intents and purposes, State Road 100 according to ISHD.

I have written a detailed history of SR 100 (SR 100: How did it come to be? [9 March 2019]) and an article about how, at one point, the connection between SR 100 on BOTH sides of Marion County were to have cloverleaf interchanges (“The Cloverleaf Interchanges at US 40 and SR 100” [20 November 2019]). If SR 100 had been completed on the west side, like it was on the north and east sides, I have no doubt that it would have followed High School Road north, probably, ultimately, to 86th Street, which was SR 100 along the northwest side.

The change in interchanges happened at 10th Street. The original plan was for a full cloverleaf interchange at that intersection. This would have pushed the eastbound 10th Street to southbound 465 ramp back closer to Glen Arm Road, where High School Road was rerouted to miss the interchange. What was ultimately built was a jumbled three-quarter cloverleaf with a flyover from westbound 10th to southbound 465.

In the end, High School Road was basically built over by 465 from Vermont to 10th Streets. 10th Street is a survey correction line, so High School actually moves slightly to the east at that point, as shown in the topo map to the left. For more information about survey lines, check out “Survey Lines and County Roads. (29 March 2019)”

Indianapolis News, 9 December 1959, showing the Indiana State Highway Department plans for I-465 from just south of the New York Central railroad tracks to just north of the Baltimore & Ohio Railroad tracks, including what was to originally be full cloverleaf interchanges at 10th Street and Rockville Road.
1953 USGS topo map of the area of Washington Street and High School Road. The area marked “Ben Davis” would be the location of the new cloverleaf interchange between US 40 and I-465.

From the looks of aerial photos in 1959 as shown in the Indianapolis News, the interchange at Washington Street was going to be very destructive. (Keep in mind that as of the writing of this article, MapIndy, my go to source for historic aerial photos of Marion County no longer offers that service. Maps are available, but the aerial photos are gone.) In addition to the shunting of Morris Street (a survey line and historic route of its own accord), most of where the interchange between US 40 and I-465 was basically what had been the town of Ben Davis.

Another thing would have to happen before this interchange would be built. It was determined, and reported, in July 1959 that an improvement of West Washington Street would have to occur before the interstate reached that point. US 40 was to be widened in the area. The work on Washington Street, however, would have to wait until sewer work in the area was completed…probably in 1961. Plans to widen Washington Street from 40 feet to 68 feet wide, with a four foot median and an eight parking lane on each side, were decided upon. Very little of that plan exists today…and if it does, it’s hard to find.

Indianapolis News, 8 December 1959, showing the proposed area of US 40 and Interstate 465.

The last area covered by the Indianapolis News in the series of articles (actually, it was the first since the editor staff decided to post them south to north, even though the interstate was built north to south!) shows the area of I-465 near Weir Cook Municipal Airport. The one change that I can see is what would become Airport Expressway (check out “Indianapolis’ Raymond Street Expressway” [4 February 2020] for the history of what started out as the Bradbury Expressway) was proposed to connect to the airport heading slightly north of due west, just above Southern Avenue. This section of the (now) Sam Jones Expressway is due east-west at the point it connects to Interstate 465. For a history of what is now Indianapolis International Airport, check out “Indianapolis Municipal Airport.” (20 August 2019)

Indianapolis News, 7 December 1959. This newspaper snippet shows the area of proposed I-465 near the (then) Weir Cook Municipal Airport (now Indianapolis International).

That covers the first of the construction of the State Road 100 replacement. I want to share this one last snippet from the Indianapolis News of 19 October 1960. It shows the construction of I-465/I-65/US 52 at 62nd Street…or the original northern end of Interstate 465.

Indianapolis News, 19 October 1960, showing the original northern end of Interstate 465.
Advertisement

1912 Proposed Indianapolis Street Name Changes, Part 2

Today, I want to continue the list of streets that were proposed to have name changes during the City Council meeting of 4 March 1912. The list was quite long. And most of them didn’t happen. Or if they did, they are long gone now. This is a follow-up to yesterday’s “1912 Proposed Indianapolis Street Name Changes, Part 1.”

The first one today never was completed, but also didn’t retain the name it had before the proposal. Cooper Avenue between Lafayette Road and the line that separates Wayne and Washington Townships (now 38th Street) was to become Concord Street. At the time, Cooper Avenue did end at Lafayette Road. But a relatively straight line due south would connect to Concord Street just north of 16th Street (between 17th and 18th, actually). By 1926, Concord Street would be completed from Lafayette Road to 16th Street (also still known as Crawfordsville Road by some). It would have a name change as well…but not to Cooper. Concord from 16th to Lafayette, and Cooper from Lafayette to 56th (Centennial Road), would be given the name Kessler Boulevard. It is still called Cooper Road between 56th Street (Centennial Road) and 62nd Street (Isenhour Road).

Before the subject proposal, Brightwood’s Depot Street, from Massachusetts Avenue south to 21st Street, and (what looks like) Laycook Avenue (hard to read on most maps) from 21st south to 19th would be renamed Avondale Place. A street that connected Pratt to 16th Street would be built, and, with Avondale Place, would become Avondale Street. This never happened. Avondale Place still exists, and from what I can tell, what was supposed to be Avondale Street south of 16th Street became known as Kealing Street. Avondale Place south of 21st Street would be removed for industrial development. Avondale Place would be ripped in two by the construction of Interstate 70 in the early to mid 1970’s. (The interstate opened to traffic in 1976.)

The next street name change also never occurred. The new name for the many sections of streets would be Chase. It was to include the first alley west of Bloomington Street from Washington Street to White River, Inwood Street from White River to Michigan Street, Kane Street from Michigan to Walnut Street and Dexter Street from 18th to 22nd Streets. I am not sure about the alley, but I believe it went away when White River Parkway was bent to connect to Washington Street outside the new Indianapolis Zoo. Inwood and Kane Streets are long gone, buried under IUPUI concrete. Dexter Street still exists.

Another large number of segments that would be proposed to become one name was Blake Street. At the time, Blake Street existed from the White River end of Washington Avenue (the original path of the National Road and location of the National Road covered bridge over White River until 1904) north to Pratt Street northeast of Indiana Avenue. Dett Street at Southern Avenue, Brooks Street from 10th to 13th Street, Isabella Street from Myrtis to Udell, Fairview Terrace from Haughey Avenue and 44th Street, and Crown Street from 44th to 45th Street were all included in this change. Dett Street no longer exists…but did at the White River end of Southern Avenue west of Meridian Street. The original Blake Street still exists, in sections. It runs through the IUPUI campus today. Brooks Street still exists. Isabella Street would become Franklin Place. The last two sections are near Butler University. Fairview Place still exists to 43rd Street. Crown Street is between 43rd and 44th Street. I would bet that the street numbers were wrong in the proposal, and that 44th was meant to be 43rd, and 45th was meant to be 44th.

Thomas Street between Brookville Road and English Avenue, Mineral Street from 10th to 19th Streets and Brightwood’s Foundry Street would actually be changed…but not immediately due to this proposal. Those streets would be changed to the name that the street along that line had between Washington Street and 10th Street – Denny Street.

There are still more on the list. As the Indianapolis News mentioned in the last paragraph of the story: “These ordinances are a part of about five hundred contemplated changes in street names. It is Copeland’s plan to give a common name to several streets of different names on the same line. The plan has been approved by postoffice authorities.”

Tarkington Street? Not so fast.

When running through newspapers looking for things to write about, some articles just stand out as both a historic fact and a fun story. Thus, today’s story from the Indianapolis News of 19 January 1903. The headline starts with a simple “Tarkington’s Name Too Long For Street.” That was enough to catch my interest. But this story also drips with a kind of irony that makes it worth it.

The lead paragraph, as is taught in Journalism class (I know from experience), gives a good idea of what is going on. “The fame of Booth Tarkington, author-politician, will not be impressed on future generations by having a street in classic Irvington named after him. They will have to remember him by his book and his reputation as a legislator.”

Yes. The idea was to rename a street in the college town of Irvington after the author of “The Magnificent Ambersons,” among others.

The topic of street name changes came up because the town of Irvington had just been annexed by the City of Indianapolis. Another neighborhood, Tuxedo, was also taken into the city around the same time. Tuxedo was located between the old city limits and Irvington. Or more precisely, between Sherman Drive and Emerson Avenue, from Washington Street to 10th Street. This required a large number of street names to be changed to avoid confusion between the two. I will include the list below.

But the subject name, Tarkington Street, is what I want to discuss first. The plan by the City Engineer’s office, was to change the name of Maple Avenue to Tarkington Street. Oh, but then the protest letters started pouring in. Tarkington was too long a name. Those on Maple Avenue wanted a name that was easier to pronounce. That was the argument. So, the city engineer decided to change the name of Maple Avenue to Bolton Avenue.

Another name change that brought the ire of Irvingtonians was that of Downey Avenue. Downey was the name of one of the original founders of the town. He was also the one that came up with the name “Irvington” for the community. The thought that it would be changed to Thompson Avenue did not go over well in the newly annexed town. Another reason involved a church. The “Downey Avenue Church” would have to change its name, as well. As it turned out, the reason they wanted to change the name is to avoid confusion with Downey Avenue in the city. It, however, did not have a sentimental connection to the neighborhood. It was changed to Orange Street.

The street names changed in Irvington and Tuxedo were as follows:
Central, Irving and College Avenues, from Brookville Avenue to Lowell Avenue: Audubon Road.
Detroit Street, from Huron to English: Mozart Avenue (later changed to Bosart).
East Street, from Washington to PRR: Sheridan Avenue.
Parkman Avenue, Ivanhoe Street south: Catherwood Avenue.
Warren Street, Washington south to PRR: Catherwood Avenue.
Orchard Street, Washington south to PRR: Webster Avenue.
Parkman Avenue, Oak north to PRR: Webster Avenue.
Prescott Avenue, B&O tracks north: Webster Avenue.
South Avenue, between the B&O and University Avenue: Good Avenue.
Perry Avenue, Julian Ave. to PRR: Berry Avenue.
Maple Avenue, PRR to Lowell Avenue: Bolton Avenue.
Pleasant Avenue, Lowell to Chambers: Bolton Avenue.
Maxwell Avenue, Lowell to Chambers: Hursh Avenue.
Green Avenue, Lowell to Chambers: Lesley Avenue.
Pleasant Street (first west of Emerson): Bancroft Avenue.

I will just include the newspaper article list of names that were changed in the city to avoid confusion. There were also a collection of streets that were finally given a name in this batch of street name changes.

The name change of Quincy Street to McKim Street ended up being pointless, although still understandable. The Quincy Street that remained would be in the Tuxedo neighborhood, west of Emerson Avenue. Depending on where you are, it is either two west of Emerson (on Washington Street) or three west of Emerson (New York Street north). Later, it would be changed to DeQuincy Street.

I hope that you find this as interesting as I did.


1930’s Indianapolis Street Name Changes

Street name changes in Indianapolis have been a constant thing. Major renamings have occurred several times. But minor changes were made throughout the history of the city. Today, I want to look at some of the minor changes that happened, or would have happened, in the 1930’s. There is no particular reason I chose the 1930’s, other than the fact that was the time period that I was researching for something that didn’t pan out.

In June 2019, I wrote an article called “Why Do Indianapolis Street Numbers Start at 9?” Originally, it was planned that 10th would be the first numbered street. But right before Christmas 1931, the City Council decided that the new lowest street number would be Nine. Pratt Street, a historic name in the city, would be changed to Ninth Street. The street had been named after Julius Pratt, a prominent citizen in the early days of the area. “Somebody conceived the idea that the name was not sufficiently dignified and, naturally, it was not difficult to get an array of signatures on a petition to change it.’ (Indianapolis Star, 23 December 1931, pp 8)

A street extension, mostly by the city, but would be taken over by the state later, called for a street name change. Daisy Avenue, a street that connected Raymond Street just east of the White River to Bluff Road was changed to West Street. This was in preparation for the city to complete West Street from 16th Street to Bluff Road. The ordinance making the street name change was passed by the City Council on 15 October 1934. Eventually, the entire section of West Street mentioned (from Bluff Road to 16th Street) would find itself part of the state highway system. South of Washington Street, it became SR 37, replacing Bluff Avenue (Road) and Meridian Street. (SR 37 ended in downtown Indianapolis at the time.)

In April 1937, a “discussion” between the City of Indianapolis and residents of Irvington were started, and finished, about the changing of street names in the neighborhood. The biggest fear was that Julian Avenue, named after one of the founders of the town, would be changed to Maryland Street in an effort to keep street names consistent through the city. The City Council announced that very few changes would be recommended…and there would be public meetings about them as they were announced.

There was a post in one of the newsgroups on Facebook to which I subscribe. The poster was asking about a relative that lived on Manlove Street. What happened to Manlove Street? May 1939, a series of 11 name changes were urged on the northside. These name changes would be between 42nd and 52nd Streets. The names were to be changed to the names of roughly the same streets north of 59th Street.

These name changes were: Arsenal to Indianola; Sheldon to Rosslyn; Hovey to Primrose; Ralston Avenue to Ralston Drive; Schofield to Buckingham Avenue; Sangster to Norwaldo; Manlove to Crittenden; Baltimore to Evanston; Caroline to Burlington; Hillside to Cambridge and Brouse to Allenby. Not all of these proposed changes were actually done.

There weren’t many. Street name changes are not taken lightly due to all of the things that go along with it: new street signs; address changes with the post office; property records; etc. But I plan to cover more as time goes on.

Indianapolis: Indiana Avenue Bridge Over Fall Creek

Early in the history of town of Indianapolis, when the state started building roads to connect the fledgling capitol to the rest of the state, a road was built from the northwest corner of the original Mile Square, traveling northwest. That road would be called both the Lafayette Road and the Crawfordsville Road, since it went to both. After the road crossed Fall Creek one mile north of the center of the town, it took a route closer to White River. That section would later be called Speedway Avenue and Waterway Boulevard. But the bridge over Fall Creek, connecting the two sections, would take nearly two decades for a true resolution. And it required the removing of several streets, including the historic Lafayette/Crawfordsville Road.

1937 MapIndy Aerial photograph of the Indiana Avenue & 10th Street area.

The bridge is question is shown on the above 1937 MapIndy photo. At that time, the intersection at the bridge was a confusing jumble of streets running in different directions. At what became the intersection of 10th Street and Indiana Avenue, there were also connections to Locke Street (heading south past the City (Wishard) Hospital, and Torbett Street running north of 10th heading east. Many people still referred to 10th Street between this intersection and the White River Parkway as Fall Creek Parkway…but that was its old name by the time this photo was taken.

Indiana Avenue had become a major route for people leaving downtown Indianapolis for the northwest suburbs. The northern end of both of Indiana and Speedway Avenues were connected to 16th Street, which ran west from Indiana Avenue to the Emrichsville Bridge over White River. The state had connected separate sections of 16th Street from Indiana Avenue east to Northwestern Avenue as part of State Road 34. Traffic, therefore, was heavy across the bridge.

That was until the summer of 1936.

It was then that the city of Indianapolis limited the bridge traffic to five tons. Trucks and busses found themselves having to go around the closed bridge by using 10th and 16th Streets. In the fall of 1938, the bridge was closed completely to all traffic. Street cars found themselves now being rerouted around the snarl. Indiana and Speedway Avenues north of Fall Creek simply became cul-du-sacs because they had no southern end at all.

The Indianapolis News of 7 May 1943, in an editorial piece, mentions that in 1936, when trucks were banned from the bridge, the Board of Works announced a $110,000 plan to build a new bridge on the site. “In the fall of 1938, the bridge was closed to traffic and a year later the city was promising solemnly to produce a new one almost immediately.”

That was followed in the fall of 1940 by the City Council and the City Engineer coming together to talk about building a new bridge for Indiana Avenue. The City Engineer was “ordered to determine ‘by the next meeting’ the precise status of the matter.” That went nowhere as it was in 1941 that a discussion was held about finding an old bridge from somewhere else to replace the old Indiana Avenue bridge that had, at that point, been completely closed to traffic for three years.

As mentioned above, the editorial was run in the News in May 1943. The bridge was still closed to traffic.

A week later, on 12 May 1943, the Indianapolis News ran another editorial on the same subject. “Mayor Tyndall expresses in one short sentence what many have had in the back of their minds for years about the Indiana avenue bridge over Fall creek. ‘If the army had to cross it, the bridge would be fixed over night,’ he declared. The bridge has stood year after year, closed to all but pedestrian traffic, while tens of thousands of motorists and others have been forced to detour by way of West and Sixteenth streets to get to the baseball grounds and parts of the city northwest of there.”

The News goes on to mention that many times over the past four and a half years, attempts have been made to remedy the situation. Without result. Some of the blame was placed on pending flood control and prevention improvements to Fall Creek. Those improvements still hadn’t happened. The News was advocating for a solution to the bridge issue sooner than later.

And action was taken when Mayor Robert H. Tyndall cut the ribbon on 1 November 1944 to open the newly repaired Indiana Avenue bridge over Fall Creek. Traffic could begin moving across the facility again. Trolley traffic on the Riverside line would start again on 27 November 1944. And everything was great. For almost six years.

The headline in the Indianapolis News of 24 March 1950 read “Indiana Avenue Bridge Out for Baseball Fans.” Simply, it meant that the old bridge over Fall Creek was closed to traffic again. The sticking point, again, came down to whether to spend $35,000 to patch the bridge, or wait until the flood control improvements made it a requirement to replace the bridge. The flood control project, which was estimated to be around $1,000,000, was still in the works as it had been since the early 1940’s.

As it turned out, less than a month later, the city council voted to appropriate $120,000 to fix the old bridge. This was required before bidding could begin on the the contract to fix it. It would seem that it would take longer than expected. It became a political issue when, in October 1951, just prior to the Marion County elections, the political party in charge was blasted for not taking care of a bridge that not only served baseball fans and residents of the northwestern section of the city, but served as an emergency route to Wishard Hospital, which sat just south of the bridge.

The Indianapolis Star said it best in the first paragraph of a story with the headline “City To Spend $120,000 For New Bridge” on 9 April 1952. That first paragraph read “the city is going to sink $120,000 into a new bridge which may be torn down within three years.” While Mayor Clark of Indianapolis was telling the City Engineer to rebuild the bridge, he was also telling the engineer to continue looking into getting Federal money to move Fall Creek 100 feet to the north as part of the flooding control and prevention program.

The flood control issue would finally be resolved in 1959. On 9 August 1960, the old Indiana Avenue bridge was closed once again, this time for good. The bridge was immediately closed and dismantled. It would be replaced by a four lane facility. The flood control project would also require the creek to actually move 100 feet to the north of its then current position, a rerouting of Speedway Avenue, to be renamed Waterway Boulevard, to a new connection with Stadium (Indiana) Avenue two blocks northwest of its historic location, and a removal of Locke Street and Fall Creek Parkway East Drive for the intersection at 10th and Indiana. (The old Torbett Street had long before been cut off from the intersection, becoming a driveway for the old YMCA that stood on the northeast corner of Fall Creek Parkway and 10th Street.)

17 July 1961, Indianapolis News

The new channel for Fall Creek and the new Indiana Avenue bridge was completed in July 1961, as shown in the above photograph from the Indianapolis News of 17 July 1961. The bridge would be opened to traffic as soon as reconstruction of the intersection at the southern foot of the bridge was completed on 1 August 1961. The below MapIndy aerial photograph from 1962 shows the reconfiguration of the intersection, the new location of Speedway Avenue, and the removal of the ends of Locke Street and Fall Creek Parkway East Drive.

1962 MapIndy aerial photo of the area around the Indiana Avenue bridge over Fall Creek.

Terre Haute, 1854

The mid-19th Century in Indiana was both a traveler’s nightmare and dream. At that time, the state was criss-crossed, or soon would be, with multiple railroads and several canals. And Terre Haute found itself at the crossroads of both. Today, I want to look at Terre Haute through the use of a map that is available at the Indiana State Library online. That maps is at the following link: http://cdm16066.contentdm.oclc.org/cdm/singleitem/collection/p15078coll8/id/1064/rec/7.

First, the National Road came to the town. The idea was that the National Road would be an improved highway, in good condition throughout the state. By the time of this map, it had already been sold to toll road companies. Those companies, in exchange for keeping the road in good condition, would be allowed to charge people to use it. The National Road would connect to Wabash Street in Terre Haute, but didn’t cross the Wabash River along that path. There was a Terre Haute Draw Bridge that crossed the river along the Ohio Street corridor.

The second method of transport that would enter the town was the Wabash & Erie Canal. This canal was the longest such facility in the United States, connecting Fort Wayne to Evansville. It entered the city from the north, separating from the river near where Florida Street is, then finding itself next to the river again around Sycamore Street. At Eagle Street, the canal made a turn back to the north in a loop that would carry it back to a point along what would be Spruce Street, then Canal Street. This section is now part of the Indiana State University campus. It would turn south again just past Ninth Street, cross the National Road, then head off to the southeast as it continued its way to Evansville.

The Terre Haute & Richmond Railroad, planned to connect the two title cities through Indianapolis, came into town from the northeast, with the railroad itself ending in a station on the north side of National Road at what is now 10th Street. The railroad that would become the Vandalia connected to the TH&R near what is now 13th Street, making a looping turn to head out along the Tippecanoe Street corridor to cross the Wabash River.

The other railroad in town, the Evansville & Crawfordsville, had its station on the southside of the National Road, across the street from the TH&R station. This railroad continued north out of town, following the current rail corridor on its way toward Crawfordsville. It, too, followed the 10th Street corridor before turning west, following the same Tippecanoe Street corridor up to and crossing the Wabash.

The area between 9th and 10th Streets at the National Road would, ultimately, include all four of these transportation facilities. Today, only the path of the old E&C still exists, although part of the old TH&R is available for use as a rail trail. The old canal bed has been removed for many years.

The Beginning, and End, of SR 534

As the Indiana State Highway Commission’s inventory of state roads was growing, the thought of putting a bypass around the city of Indianapolis hit the planning sheets. The original plan started appearing on official highway maps in 1932. But little would be done for almost a decade. In 1941, the start of a bypass road was contracted…and built. But there was more to it than just a section along the east side from Fort Harrison to Nora.

Yes, that’s right. From Fort Harrison to Nora. The original road that was started in 1941 followed 56th Street from Fort Harrison out to a new construction road along what was, and still is, the Shadeland corridor. At the time, it was Shadeland Road. But that corridor only ran from 10th Street to 56th Street, creating a dead end road north of 56th Street into the Woolen Gardens. A complete history of the road is available as “SR 100: How did it come to be?

The Indianapolis News, 24 July 1941
Legal notice for contract to build SR 534 from
56th Street to Castleton.

Things started happening on the bypass route in 1941, when the first contracts were let. As is typical of the ISHC at the time, the road was contracted separately from the bridges. The first contracts for the road were let in July 1941. The legal notices were published for the contract, as shown on the left. The bids were to be in the hands of the ISHC by 5 August 1941 at 10 AM Central Standard Time (the time zone Indianapolis was in at the time). The plan was for a reinforced concrete road surface north from 56th Street to the old state road that turned west along what is now 82nd Street.

The bridge over Fall Creek was let out for contract in September 1941, with the description “structure on State Road 534” details as a five span arch bridge “over Fall Creek, 2.7 Mi. North of Lawrence.” Those spans were to be, in order: one at 40 feet; three at 80 feet, and one at 40 feet. The bridge was to be of reinforced concrete arch design. Bids were to be at the ISHC by 10 AM CST on 7 October 1941.

The next leg of the road was published for contract in December 1941, with a due date of 16 December 1941. It was to include 4.578 miles of reinforced concrete from Nora to Castleton. (For the route prior to SR 534 construction, check out 82nd and 86th Street Before SR 534 (SR 100).) This would complete the first opened section of SR 534 in Indiana.

Then World War II started.

The Indianapolis News, of 21 December 1942, opined that the ISHC was in a holding pattern when it came to the building of the bypass road. The road was not mentioned by number, but the route was discussed. “One link, approaching Ft. Benjamin Harrison by way of Allisonville and Castleton, has been completed and is in use. The belt highway, discussed for years, will extend south, intersection Roads 40, 52 and 29, until it reaches the Thompson Road, where it will continue west, intersecting Roads 31, 37 and 67.” With the Shadeland Road corridor only extending as far as 10th Street, this would require the acquisition of right-of-way and building of four miles of new road from 10th Street to Troy Avenue/Southeastern Avenue/SR 29. South from here, the road was already in place as the Five Points Road.

“At Valley Mills it will turn north, crossing roads 40, 36 and 34, eventually intersecting Road 52, where it will join the northern east-and-west link that has been built.” This would put the road along the High School Road corridor on the west side. This would also include a state road that connected US 40 to the Indianapolis Municipal Airport. That state road was designated SR 100 when it was commissioned.

“The practical value of such a construction program has long been recognized, both for ordinary traffic and for commercial vehicles that will be enabled to by-pass Indianapolis without contributing to traffic congestion be traversing the downtown streets.”

The article concluded as follows: “A belt line around Indianapolis has been considered ever since the old days of the “Dandy Trail” when gravel roads were marked and motorists wore linen dusters. The successor to that trail is one of the numerous tasks that are being held in abeyance until the war is won.”

The designation of SR 534 would be applied to the east leg from Washington Street north to 82nd Street, then along the 82nd/86th Street corridor to SR 29, Michigan Road. In the summer of 1949, the following was published in the Indianapolis News: “Some of our highways are known by name as well as number. Thus the route called State Road 534 could be more easily found if you called it Shadeland Drive. This road, leading north from Road 40, east of Indianapolis, intersects with Roads 31, 431, 37, 52 and 29 and is part of what, some day, will be a belt line around the city. But what we started out to say is that on the new Indiana highway maps it is 534 no longer. The new number is 100.”

And with that, the ISHC removed one of the “daughters” of State Road 34, stretching the SR 100 designation from a short section of High School Road to the entire bypass. Or, at least, the sections that would be completed before it was entirely replaced by Interstate 465.

Connecting 16th Street from US 52 to SR 29

When I posted about routes to get to the Indianapolis Motor Speedway, someone of Facebook had posted a comment about the direct route using Indiana Avenue and 16th Street from downtown Indianapolis. I responded that part of the problem was that 16th Street, at the time (1919) did not exist between Lafayette Road and Northwestern Avenue (now Dr. Martin Luther King Jr. Street). After crossing the White River on the Emrichsville Bridge, the streets turned either north onto White River Parkway East Drive or southeast onto what was Crawfordsville Road.

The junction of Indiana Avenue/10th Street/Fall Creek/
Crawfordsville Road

It should also be noted that the most people, at that time, thought of Crawfordsville Road (now Waterway Boulevard) as the first choice as it was the one that had been in place the longest. Indiana Avenue came long after the Crawfordsville Road, and both of those streets connected to Indiana Avenue at 10th Street across Fall Creek. The moving of the south end of Waterway Boulevard, as it is today, didn’t happen until sometime after World War II.

But west of the White River, at 16th Street, was both US 52 (Lafayette Road) and SR 34 (16th Street). The state roads followed White River West Drive to Washington Street, because the road didn’t exist east of the river. This would connect US 52 (and possibly SR 34) to US 40 under what is now the Indianapolis Zoo.

It would be shortly after the 1919 map was published that 16th Street would be built from Indiana Avenue to the Emrichsville Bridge. But that was the extent of the new 16th Street. And even then, the 16th Street that was built was north of where it should have been. 16th Street through Marion County, of most of it, is along the half section line. Since the Emrichsville Bridge was angled north as it crossed west to east, 16th Street would be connected north of the half-section line where it belonged.

1926 Indianapolis map of the sections of 16th Street at that time between White River and Northwestern Avenue.

Fast forward to 1933. The Indianapolis Board of Public Works decided on several projects to be completed during the 1934 construction season. Two of the projects included bridges over Fall Creek. One of those would be on 16th Street. By this time, there was a short section of 16th Street from Gent Avenue to Fall Creek and just barely west of Northwestern Avenue.

The bridge over Fall Creek would allow connection between the two sections of 16th Street. Another part of the project would be widening the road that was there. In 1934 money, the project to construct and widen 16th Street from Northwestern Avenue to the Emrichsville Bridge would cost $280,000. The new bridge over Fall Creek would cost $250,000.

A remodel of the Emrichsville Bridge would also be part of the project. The northwest wing of the bridge would be cut off and the south sidewalk to be completely removed to create a better turning angle between the sections of 16th Street on either end. The city wouldn’t have to foot the entire bill for the new construction and widening. The city was working with the Indiana State Highway Commission for federal funding (at that time, a 50/50 split) for the project as the state would most likely (and did) add that section of 16th Street to the state highway system as part of US 52 and SR 34.

Another part of this project would be the widening of West Street from 16th Street to Bluff Road. From Washington Street north West Street was SR 29. From Washington Street south, it would become SR 37. Again, the cost would be shared between the ISHC and the federal government.

Indianapolis News, 27 October 1948

The Emrichsville Bridge would last another 14 years. It was torn down in 1948 to create a wider, more direct bridge for 16th Street/US 52/SR 34 across White River. Ultimately, the new 16th Street from White River to Dr. Martin Luther King Jr. Street would look as it does in the Google map shown below. It would also remain a state road until the late 1970s, when US 136 (formerly SR 34) was removed from inside the I-465 loop. US 52 had been the first removed and rerouted along I-465 when that road was complete from the northwest side to the southeast side.

Building I-465 at West 21st Street

When the interstate system worked its way to Indiana, the plan for a bypass around Indianapolis was on the books as part of the project. Even before the route numbers were nailed down, the destinations and relative locations were in place. What would become I-465 would take almost a decade to build – more if you count the section from I-65 to I-865 on the northwest side of Marion County. (For more information about that statement, see “The Beginning of I-465,” published on 16 May 2019.) But I-465 was contentious…and not entirely for the reasons one would think.

Indianapolis Star, 11 August 1961.

The first real bone of contention (other than the coming destruction of entire sections of Marion County) was the area where I-465 and 21st Street meet on the west side. The section of the current interstate from Crawfordsville Road south to almost 10th Street runs very close to Big Eagle Creek. The town of Speedway at the time suffered from flooding on a regular basis. The state planned for 21st Street to cross over the interstate. Local residents, and county government, wanted the opposite…the interstate to cross over 21st Street. Part of the argument was that the state had already planned to elevate sections of the road on both sides of 21st Street. Why not keep the elevation for the 21st Street section.

Part of the argument was flooding…or the potential for such. People in the town of Speedway were under the impression that running 21st Street under the interstate would form a valve to keep flooding to a minimum. As the Indianapolis Star pointed out in an editorial piece on 24 August 1961, “nothing could be further from the truth.” The interstate was graded far above the maximum flood level at Eagle Creek. The building of an underpass for 21st Street, it is pointed out, would require a complete new system of levees to be built to control the flooding of 21st Street. The problem for Speedway and flooding was not an interstate overpass, but major work needed on Eagle Creek.

It was pointed out in another article that the plans for I-465 included, in the embankment for the bridges, four channels for water to flow through the area not actually in Eagle Creek. The Indianapolis Star of 9 July 1961 reported that Joseph I. Perrey, chief engineer for the Indiana Flood Control and Water Resources Commission, stated that no matter what was built at I-465 and 21st Street, the problem with Speedway flooding was more controlled by the 21st Street bridge over Eagle Creek. “The construction of 21st Street either under or over Interstate 465 will have no affect in stopping flooding.” Mr. Perrey continued “but a new county bridge could alleviate the situation somewhat.”

Progress was made towards changing the state’s mind about the 21st Street overpass. Summer of 1961 saw a flurry of activity. The state agreed to change the project, if the county put up a $50,000 bond to cover any cost overruns due to the change. The deadline for the county agreeing to that provision, and thus the contract to change the plans, was 21 August 1961. County Commissioners agreed to sign the deal that day, if they could include a provision to delay the posting of the bond. By law, the county said, it would take five days to make the money available.

But the State Highway Commission was also in a bind at this point. Construction had reached a point where concrete was ready to pour. Any delay in that poring could have resulted in the contractor suing the state. In addition to the changing of 21st Street from an overpass to an underpass, the county was asking that 21st Street be built four lanes wide, instead of two, to “avoid a greater expenditure if 21st must be widened later.” (Source: Indianapolis News, 21 August 1961)

The whole thing was made worse when the county questioned the state about the current status of the contract. (Source: Indianapolis Star, 8 September 1961) “The State Highway Commission yesterday refused the ‘bait’ offered by the Marion County Board of Commissioners to cancel the contract obligating the county commissioners to pay for the time the state suspended operations on Interstate 465.” The state was expected to send the county a bill for the six day shutdown of construction on the interstate due to the county trying to raise the bond money. The county, for its part, wanted the contract to be declared cancelled…which the state wasn’t having.

Add to this, the county stating that they weren’t paying anything until a full accounting was relayed to them. They expected it to be, roughly, $1,000 a day, not the $25,000 the State Highway Commission expected.

Meanwhile, the whole decision to build a 21st Street bridge over I-465 was being investigated by the Federal Bureau of Public Roads. That investigation started when three local residents accused the Highway Commissioner of conflict of interest, and hinted that his three sons would benefit from the building of an overpass. Indications were that libel suits would start flying from the Commissioner’s sons once cleared by the Federal investigation.

“The controversy over the intersection of I-465 and 21st Street was started by Jules T. Gradison who owns the land around the intersection. He demanded that 21st Street pass under I-465 and the state agreed to the change when the county commissioners offered to pay the extra cost, estimated at from $150,000 to $200,000.” Mr. Gradison also pointed out that he would have given any extra acreage needed to change the plan free of charge.

21st Street crosses over I-465 to this day. The overpass is also, to this day, only two lanes wide. With the many reconstructions of I-465 through that area, the 21st Street overpass has allowed for the widening of 465 needed over the years.

Rockville State Road, US 36, near Bainbridge

When the original state roads were built, the state of Indiana created a road that connected Indianapolis to Rockville, via Danville. That road, still known today as Rockville Road in Marion County, is almost as straight as any road can get in this state. However, there were places where straight just wasn’t possible. Such a place is in Putnam County.

It should be noted that there were two things at play when it came to the building of the original state roads. First, the construction was done to keep costs to a minimum. There was no need to cat a path through a hill when one could just go around it. Path of least resistance was the motto of the day. Second, as a general rule, the state didn’t tend to take people’s property to build a road that would just be turned over to the county after it was built. This is one of the reasons that a road connecting two towns in early Indiana didn’t always go directly between two points. While it isn’t as noticeable on maps today, a quick glance at older maps shows the curvy way someone got from point A to point B in the early days of the state.

The Rockville State Road was (mostly) built along a section line, meaning very little property would have to be taken to create it. Generally, property lines in Indiana tend to work along the survey lines. Survey line separate townships, ranges and sections. Most of the time, property was purchased in one section or another, usually not crossing the section line. But there were several places that the old road did have to venture off of the survey lines beaten path.

One was east of Danville. Main Street through the city was the original Rockville State Road. When a short bypass between Danville and Avon was built, the old road was kept in place, but turned slightly at both the western and eastern ends. The following Google Map snippet shows the old property lines when it came to the western (Danville) end of old Main Street/SR 31/US 36. Main Street turns southwest, while the old property lines turn due west to connect to Danville itself.

The other section was a much larger bypass built by the state in 1933. East of Bainbridge, the old state road took a dive to the south of the survey line…sometimes venturing almost a mile south of the line itself. The following map is from 1911, showing the postal routes that were followed at that time, and showing the old Rockville State road in its original alignment.

As shown on the map, going west to east, the old road started turning southeastward in Section 12, continuing further southeast in Section 7, and hitting its southern most point in Section 8. From there, it worked its way back northeastward until it reached the section line again in Section 10. This created a variance from the section line that was nearly four miles long.

Editor’s Note: As is typical of the original surveys, sections along the western edge of the range [sections 6, 7, 18, 19, 30 and 31] are smaller than one mile wide. The Range Line between those sections listed above, and sections 1, 12, 13, 24, 25 and 36 of the range west, is known as a correction line. This can be spotted throughout the state, not only by the less than one mile wide sections, but the occasional deviance from a straight line going west to east. In Marion County, Shelby Street and Franklin Road are those correction lines…and looking at the roads crossing them shows the correction. The survey line along the north edge of the map is the township line, separating survey townships 15 North and 16 North. Following that line to the east, it becomes part of the Danville State Road in eastern Hendricks County, 10th Street (the geographic center) through Marion County, and the numbering center of Hancock County. It is also a correction line in the surveys, so sometimes survey lines jog a bit when crossing it as well.

This section of the old road was very curvy, narrow, and did not lend itself well to the pending explosion of traffic that would be coming its way with the creation of the Auto Trails and, later, the State Highway System. When the Pike’s Peak Ocean to Ocean highway was created, it followed the old Rockville Road from Rockville to Indianapolis. Thus, it followed this curvy, winding line through Putnam County.

Things would change in 1933, when the Indiana State Highway Commission announced that construction would begin on US 36 from Danville to Bainbridge. This project would complete the straightening of the federal highway from west of Indianapolis to the Illinois-Indiana State Line. The Indianapolis Star of 1 April 1933 reported “a twenty-five mile detour from Danville to Bainbridge on United States Road 36 over pavement and dustless type road has been established to take care of traffic pending completion of new pavement between Danville and Bainbridge which will complete the project from Indianapolis to the Illinois state line.”

The above Google map snippet shows the exact same area as covered by the 1911 USPS map shown above. The route of US 36 through the area, shown in yellow, is the 1933 bypass built by the ISHC. The old road is still very narrow and winding, but still can be traveled to this day. The Indiana Official Highway map of 1933 shows the new road under construction, with the old road removed from the map. By the time the next official map was released for June 1934, the new road was completed and opened. The following is the 1936 survey map of Putnam County roads, including road width, constructing materials and bridge of the same area.

The new roadway included bridges marked as AS, AT, and AU on this map. The old road included CN, CM, CH, CG, and CK. (Note, they are marked on the map in lower case letters. I am using upper case to denote them since it is easier to read.) Both AS and AU were built 24 feet wide, while AT was built 20 feet wide. All three had a safe working load of 20 tons.

The old road’s bridges were a bit more complicated. CN was 12.7 feet high, 12.7 feet wide, and had a safe working load of three tons. CK was 16 feet wide and could handle 15 tons. CM was 19.5 feet wide, with a working limit of 20 tons. This would make it almost equal to the bridge that replaced it (AT), only being six inches narrower with the same work load limit. Both CG and CH were 20 feet wide with a 20 ton safe load limit.

The old road, according to the figures on the 1936 map, had a right-of-way 40 feet wide. The new US 36 through the area had a right-of-way of 60 feet in width. Most of the county roads in the area had a right-of-way narrower than the old Rockville State Road, usually less than 10 feet.

The other part of this realignment project was through Bainbridge itself. The old road traversed the town along Main Street. The new road bypassed Main Street to the north…by only one block. It still does to this day.

Jim Grey, on his old web site, covers the sections of the old road that connect to the current US 36 fairly well. That page is at: http://www.jimgrey.net/Roads/US36West/04_Bainbridge.htm. I think I have read somewhere that this website will be migrated over to his WordPress blog, “Down The Road.” If this is the case, get it while you can. And who knows, maybe after all the “stay at home” mess is over, I might make a trip out to this section of the old road to take some onsite surveys. (I would love to say take pictures…but my lack of photography skills is only surpassed by my complete lack of patience to take the time to make them good. Not gonna lie here, folks.)

Bicycling the National Road West from Indianapolis

Route map from the Indianapolis News, 11 April 1896, showing bicycling routes.

Today’s Bicycling Thursday I want to go back to the Indianapolis News of 11 April 1896, which covered routes west of Indianapolis, starting with the National Road. While the article mentions shorter routes that use other roads back to the city, I want to stick to what is now Washington Street.

The first part of the journey was pretty much straight forward: “starting from Meridian and Washington streets, the run is out Washington street, which is paved some distance west of White River.” Before this point, the crossing of the White River could be done using one of two bridges, with more information available at “Indianapolis: Washington Street & National Road Bridges.” “Beyond the pavement, to the point where the National Road proper begins, the street is badly cut up.” This would be the section from roughly the Belt Railway to Mount Jackson, mentioned later. It was also mentioned that, while the road was in bad shape, the “going is good in the center of the car track.” Keep in mind that the “car track” mentioned here is that of the street cars.

1889 map of Mount Jackson and Haughville along Washington St.

“The National road starts from Mount Jackson, three miles out, and runs off a little southwest.” The town of Mount Jackson stretched from what is now Belmont to Tibbs Avenues, south of Washington Street. (Haughville proper was along the same stretch, north of Washington Street.) At what is now Warman, the “Indiana Insane Hospital” property was located. This property would be later named Central State Hospital.

At the edge of the hospital property, “a dirt road running northwest, skirting Haughville and crossing the Osterman (10 Street from White River to the Danville State Road), Crawfordsville and Lafayette roads.” This is now Tibbs Avenue.

1889 map of the National Road from the Eagle Creek crossing west, also showing the original connection of the National and Rockville Roads.

After passing the hospital, the old road passes over Eagle Creek “on a good iron bridge, the approaches to which are easy.” It then crosses the Big Four railway, which at the time was an at-grade crossing. The road then turns more to the southwest. Here “there has been a liberal supply of fresh gravel distributed over the road for about one mile, but there is a hard path at the side.” Also, there are two dirt roads branching from the main road in this section. One goes to Maywood, which is now Tibbs Avenue south of Washington Street. The other is between Tibbs and the place where the original Rockville Road turned northwest from the National Road (that intersection is now where Holt Road meets Washington Street).

About a mile from Rockville Road, the old road crosses a toll road that is a continuation of Morris Street from Indianapolis (and has that name today), the Emma Hanck turnpike. “Six miles from the city is a grocery and blacksmith shop, which may be used to good advantage by unfortunates.” This is between Morris Street and High School Road, which was called the Forsha Turnpike, which connected the National Road to Ben Davis Post Office. At seven miles from the city, a “pleasant resting place for the first riders” at a big saw mill. A dirt road near this point, running north and south, could allow a rider wanting a short ride to connect back to the city via “half a dozen turnpikes running east and west.”

At a point 9.5 miles from the city, where the road passes through a small, well shaded village called Bridgeport. The road then continues over White Lick Creek and rumbles toward Plainfield over what was a recent installment of fresh gravel. Finally, before leaving Marion County, the rider will come across a “large nursery, with green and white buildings and storehouses, situated on the side of a hill” just at the edge of the county line.