SR 37, A Review

One of the blogs that I follow everyday is that of Jim Grey. I started reading his blog over a year before I created the Indiana Transportation History Facebook page. It was because of that blog that I asked him to help me admin that group. He was also the one that encouraged me to start this blog…telling me, correctly, that it would be easier to keep track of the information I have been sharing in blog form than in a Facebook group. His blog is called “Down The Road.”

Jim had been sharing his passion for photography and road trips in the Facebook group. His topic has been that of SR 37. Due to those posts, I decided to put together a collection of posts that I have shared over the past 16 months that cover the same subject. Check out his photos on the subject at his blog, or through links on the Facebook group.

Waverly

In the early years of the state of Indiana, a small village located at the Bluffs of the White River became the meeting place for commissioners that set out to determine the location of the new state capital. Two years before that, in 1818, a trail was cut through the wilderness from Brookville that came to be known as the Whetzel Trace. Later on, a road was built north to the new state capital at Indianapolis. Because it went to the Bluffs of the White River, it was called Bluff Road.

Paoli State Road

When the Bluff Road was built, it was included in a longer “state” road that stretched from Indianapolis, through Martinsville, Bloomington and Bedford to Paoli. It would become the basis for original state road 22, and later, the original path of State Road 37.

White River on Indianapolis’ South Side, and its Effects

This article focused more on the effects of the Indianapolis Southern/Illinois Central Railroad, but it DID affect the routing of State Road 37. When SR 37 came into being, it ended at Washington and Meridian Streets, following Meridian Street south to Bluff Avenue (now Road) for its journey out of Marion County. The White River was moved, and the state built a new SR 37 over the old river.

Road Trip 1926: SR 37

On 1 October 1926, the entire state road system was renumbered. State Road 37 was given to what had been State Road 22 from Indianapolis south. The new State Road 37 was designated only south of the capital city.

Winners and Losers, Routing the Dixie Highway Through Indiana

When the committees met to create Carl Fisher’s Dixie Highway, political and personal gain played a part. Especially south of Indianapolis. While Fisher wanted the route to go directly from Indianapolis to Louisville, someone else wanted the same thing…just with a detour through Paoli. The latter won.

Original SR 22 – The “Fight” For the Way to Martinsville

The fastest way to Martinsville from Indianapolis wasn’t always the Bluff Road. When the state started taking over roads, a discussion was had to decide what road would be taken over to get to Martinsville. The choice was between the Vincennes Road and the Bluff Road. Eventually, it would be both.

Removing the Bluff Road Bridge Over the Illinois Central/Indiana Railroad

The Indianapolis Southern Railroad was chartered in 1902, and it crossed the old Bluff Road at an odd angle. The Dixie Highway used the route starting in 1914. In 1923, it became State Road 22. In 1925, a bridge was built over the railroad due to increased traffic on both the road and the railroad.

The Dixie Highway In Morgan County

One of the most bypassed roads in the state is SR 37. And very few more so than SR 37 in Morgan County. But this article focuses on the Dixie Highway through the county…and how it was originally routed through the area.

State Highway Department Construction Plans for 1963-1965

This article is included because part of the plan was to build a new SR 37 through the west side of Indianapolis, and connect it to I-465 at Harding Street. The Harding Street connection would be made. It would be a complete reroute of SR 37 from I-465 south to Martinsville. It ended up that SR 37 would be routed along I-465 from Harding Street to East Street (US 31), and be multiplexed with US 31 all the way to 38th Street on the northside of the city.

Expanding SR 37 from Martinsville to Oolitic

The last article about the routing of SR 37 I want to share is the latest one posted. In the 1970s, SR 37 was being moved and widened from Martinsville to Bedford. The section north of Martinsville had already been moved and widened…in conjunction with the construction of I-465 around Indianapolis.

Indianapolis Street Car Saturday – Getting to Irvington

1870. Sylvester Johnson and Jacob Julian laid out a town four miles east of Monument Circle on the National Road (or, at that time, the Cumberland Turnpike). They named their town after Washington Irving, hence Irvington. In the fall of 1875, the North Western Christian University moved from its home at College and Home Avenues (now College Avenue and 13th Street) to the southwest corner of Irvington between the Panhandle (Pennsylvania Railroad) and the Junction (Baltimore & Ohio) tracks. At the same time, there was a mule car line being built to the new suburb.

1889 Map of Irvington, Indiana.

The Irvington Street Car line was planned along the following route: From Virginia Avenue and South Street, east on South Street (now Fletcher Avenue) to Reid Street (now State Street), north on Reid to English Avenue, east to English to Butler, north on Butler to Burgess, east on Burgess to Audubon, and north on Audubon to end just south of the Pennsylvania Railroad. The line, according to the Indianapolis News on 25 February 1875, was expected to be in operation in June 1875.

On 2 August 1875, a small paragraph was in the Indianapolis News mentioned “the construction of the Irvington street railway has not come to a standstill, owing to a lack of funds, as stated in the Journal, but on account of the wet weather. The Stratford bridge has been washed away and it is impossible to ballast the track.” Two weeks later, the News reported, in a story about the new college campus, that the Irvington line was quickly nearing completion.

The line opened later in October 1875. The trip from downtown to North Western Christian University, using mule cars, was 45 minutes. It wasn’t long before the Irvington street car line found itself closed to service. A freight train on the Indianapolis, Cincinnati & Lafayette jumped the tracks, causing a large section of the street car line to be ripped up. The IC&L crossed the street car line at English Avenue just east of Reid Street (now State Street). “In consequence no cars are running to-day on that line.”

Some might be wondering why service to Irvington was routed along English Avenue. As mentioned in my last blog post (Toll Roads in Marion County), Washington Street was a toll road outside the city limits. English Avenue was called a “shun pike,” a road that was improved and extended to avoid paying tolls to the toll road companies. That, and I believe that the toll road would have charged the street railways to use the road.

The line route was changed in 1881, when it was removed from Burgess to University Avenue between Butler Avenue and Audubon Avenue. That would be the last change in that line until the power lines stopped being used on 15 August 1934.

The East Washington line was mentioned in the last “Indianapolis Street Car Saturday.” The franchise for the Citizen’s Street Railway East Washington line extension to Irvington was issued on 20 September 1889, the day after the National Road was purchased by the county from the toll road company.

Plymouth, Kankakee & Pacific Railroad

In 1869, a new railroad was chartered to connect Plymouth, in Marshall County, to near Bureau, Illinois. It was a plan to build a road to connect the Pittsburgh, Fort Wayne & Chicago to the Rock Island & Pacific. Within four years, most of the roadbed had been graded. And the company was put into slumber mode due to the Panic of 1873.

Plymouth Weekly Republican, 22 September 1869: “Hon. Jas. McGrew, President of a railroad, visited our town this week to interest the citizens in a new line of railroad that is to be built from some point on the P. Ft. W. & C. R. R., in Indiana, through Kankakee City to Barean (sic), Ills., on the Rock Island and Pacific railroad. A company has been organized in Illinois to build that portion of the line which is in that state.” Both of the companies that would be connected by this railroad “are anxious to have the road built, and will iron it as soon as graded and tied.”

The Illinois section of the road, the Kankakee & Illinois River Railroad, was chartered in Illinois on 16 April 1869. The new railroad on the Indiana side, called the Plymouth, Kankakee & Pacific, would receive its charter on 7 January 1870. These two companies would be consolidated on 20 October 1870. The company would keep the name of the Indiana half of the railroad – PK&P.

The first sign of things to come for this road appeared in April 1871. According to the Plymouth Weekly Republican of 27 April 1871, “The Chicago Times, and in fact all of the Chicago papers, of April 12th contained an item relative to the sale of the Plymouth, Kankakee & Pacific Company.” Basically, the company was being reported as sold to the Chicago, Rock Island & Pacific. While this would have been entirely possible, given the feeder route status of the PK&P, there was one group of people that were not notified that the company had been sold. The company itself. As it turned out, right below the above mentioned article was a denial by the PK&P that such a sale had even happened.

Things came to a screeching halt for the company when William C. Richards, Kankakee, filed a petition in bankruptcy against the Plymouth, Kankakee & Pacific. The claim was based on eight first mortgage bond coupons for the railroad. Those eight coupons were to be paid, in gold, on 1 July 1873. They were valued at $35 a piece. There were hundreds of said coupons that were not being paid, as well payments for other law suits.

The bankruptcy put the railroad into a holding pattern. For years. In March 1879 it was reported that there were some mumblings about the PK&P being purchased by the Pittsburgh, Fort Wayne & Chicago. When the company had suspended operations in 1873, most of the grading had been done and bridges built…at least on the Illinois side. There was hope that the PFtW&C would complete and operate the railroad as soon as possible. Such hope was misplaced.

The company languished even more. At this point, all the work had been done on the Illinois side. It had done no work whatsoever in Indiana. Finally, the PK&P was sold at foreclosure to John S. Cushman on 5 May 1881. On 11 July of that year, it would become the Indiana, Illinois & Iowa Railroad of Illinois. 11 August 1881 saw the II&I of Iowa chartered. 14 September 1881 was the date of creation of the Indiana version of the II&I. They were all consolidated on 27 December 1881 to form the ultimate Indiana, Illinois & Iowa.

The II&I used the routing of the original PK&P, at least to Knox, Indiana. The II&I used that right of way set apart by the PK&P to build from Momence, Illinois, to North Judson, Indiana in 1883, a total of 56.2 miles. Three years later, the line was extended to Knox. The last 33.39 miles from Knox to South Bend were completed in 1894.

Through a few consolidations, what was originally part of the Plymouth, Kankakee & Pacific would become part of the New York Central on 23 December 1914. I covered that railroad in the article “The New York Central in Indiana.” Plymouth never did get the new railroad that would connect it to the Pacific Ocean via the Rock Island and the Union Pacific.

Indianapolis Street Car Saturday – New Lines, 1866-1870

Today’s “Indianapolis Street Car Saturday” focuses on

1866. The East Washington Street line commences service. The original length of the line only connected Illinois Street to Liberty Street (now Park Avenue). Service along this line was truncated to Liberty Street until 1883, when it was extended one block to Noble Street (College Avenue). Five years later, East Washington Street became one of the longest mule car lines in the city when it was extended to the new suburb of Irvington, going all the way out to Audubon Avenue, turning south to a turntable near the Pennsylvania Railroad tracks that run through the town. Until this time, access to Irvington via street car was via the English Avenue line, which didn’t originally open until 1875.

The extension to Irvington of East Washington Street was due to its residents wanting a more direct route to downtown Indianapolis. I will get to the English route probably next week, describing the route that Irvington wanted to replace. The line was electrified in 1891. Two more extensions were added to the East Washington Line: in 1900, to west of Arlington Avenue; and in 1920, a purchase from the Terre Haute, Indianapolis & Eastern Traction Company Richmond line extended Indianapolis Street Railways to Sheridan Avenue, where a “Y” turned cars around.

The last tracked street car to run along East Washington Street did so on 11 August 1950. This started a combination service using both trackless trolleys and busses.

In 1867, a new line was extended to the then new cemetery at Crown Hill, called the Northwestern Line. The line followed Illinois Street to 12th (21st) Street, crossed over to Northwestern Avenue, followed Northwestern to a spot where 34th Street would be later built. This line was a mule car line for its entire life, because it was completely removed in 1879.

Another 1867 line that commenced service was the Central Line. The start of this line is intertwined with the College Line, as it would for its entire life. In the beginning, it merely followed New Jersey Street from Washington Street to Fort Wayne Avenue. In 1888, the line was extended along Fort Wayne Avenue, then Central Avenue from Christian Avenue (11th Street) to a turn table at 11th (20th) Street. A short detour along Tenth (19th) Street to New Jersey would allow street cars to visit a barn facility located on New Jersey Street.

The line was rerouted in 1889, when it used Alabama Street from Fort Wayne to Home Avenue (13th Street), following Home to Central Avenue. Three years later, the Central line was again rerouted. This time, it would follow the College Line to 16th (24th) Street, turning west to Central Avenue, then north on Central to 26th (34th) Street. This was in 1892, the same year that the line was electrified. A loop was built in the line in 1894. The line was rerouted at the time, moving over to Central from College along the then Tenth (20th) Street to connected to the 1892 line at 16th (24th) Street. The loop then went west on 17th (25th) Street to New Jersey, and back to Central on 16th (24th) Street.

The last electric railed street car would run along this line on 20 March 1937.

1905 Indianapolis. Map showing the River
and Kentucky Avenue bridges.

Street cars would be added to Kentucky Avenue in 1868. The line was short: from the Louisiana Street barn to Tennessee Street (Capitol Avenue), then along Kentucky Avenue to Illinois and Washington Streets. The line was turned around, heading southwest from Tennessee Street in 1890. The line would end at River Avenue, which at that time was at the south end of Greenlawn Cemetery. This was located half way opposite of a point between what is now Merrill Street and Henry Street on Kentucky Avenue. The following year, the line was electrified. The last documented extension that I can find was in 1903, when the line crossed the White River on the River Avenue bridge (there was no bridge at Oliver Street), following River Avenue to Morris Street. I can find no more information on this line. It is entirely possible that it was extended, in 1914, to connect to the Indianapolis suburb of Mars Hill. But another line that started in 1881 might be the successor to this line. More research is needed.

The last line today is the Pennsylvania line. Started in 1870, the mule cars would run along Pennsylvania Street from Ohio to St. Joseph Street, where it turn west to Illinois Street for its trip downtown. 1873 saw the Illinois/St. Joseph turn removed, and the line wet north to Seventh (16th) Street where it turned east to Alabama. In 1891, the route turned north on Talbot from Seventh (16th) to a turn table at Tenth (19th) Street. 1894 saw the line electrified and extended to 14th (22nd) Street. The last car to use the rails would run on 18 July 1934.

Expanding SR 37 from Martinsville to Oolitic

20 December 1970. The Sunday Herald-Times (Sunday edition of the Bloomington Herald-Telephone and the Bedford Times-Mail) has as the lead story at the top of page one, “All Four-Lane 37 To Be Started In 1971.” It discusses the last projects that would make SR 37 a divided highway from the Martinsville Bypass to Oolitic. It was the beginning of the projects…all scheduled to start before the end of 1971.

Chairman of the Indiana State Highway Commission at the time, Ruel W. Steele, stated that the ISHC had let eight contracts, totaling over $22.5 million, along the highway corridor. The section between Bloomington and Martinsville was under going right of way purchasing, with construction projected to start in the fall of 1971. Right of way purchasing would consist of one contract. Construction would be divided into two contracts.

“We expect to clear the right of way on the south half of the Bloomington-Martinsville project by some time in July of next year,” said Steele, “and on the north half by September. We expect to have both sections under contract next year – the south half by September, and the north portion before the end of the year.” Construction of this section should go quickly, the newspaper mentions, because it will mostly be widening the current road from two to four lanes in place. “There will be some places along the corridor where the new lanes will be west of the present road, and some where it will be to the east.”

One section was already under construction. A new northbound SR 37 bridge over Indian Creek, south of Martinsville, was being built 60 feet east of the then current two lane bridge. Once the new bridge was completed, traffic would be rerouted to the new facility while the old bridge was rebuilt. In Indiana, most contracts for road construction are let separately for roads and bridges.

Included with the discussions with Mr. Steele was a status report on all of SR 37 from south of Bedford to the south end of the Martinsville bypass. The Bedford bypass was anticipated to start construction in Spring 1972. Due to rough terrain and three sets of bridges having to be built, the Bedford bypass was to be the most expensive part of the entire project. It will be the last project to be put under contract.

4.8 miles of the new highway from Oolitic to south of the Monroe County line was, at this time, 40 percent complete and 15 percent ahead of schedule. Completion was scheduled for December 1971. The next 3.3 mile section, to just north of the Monroe County line, was scheduled for completion by 1 June 1972.

The next 2.5 mile section from 1.5 miles north of the Monroe County line to three miles south of Dillman Road had been let to contract the previous week. This included an interchange at Monroe Dam Road, allowing access to Lake Monroe, and bridges over the Monon and Clear Creek. This section was scheduled for completion by December 1972.

Right of way problems were being resolved for the next 2.5 miles, all south of Dillman Road. Most property had been acquired, but some condemnation suits would have to be filed. The right of way was expected to be cleared within the next two weeks from the publication of this article, except for the condemnation suits which would be filed by 15 January 1971. The new Bloomington bypass would start at the end of this section, one half mile south of Dillman Road.

March 1971 was the scheduled date for the start of right of way purchasing for the south four miles, from south of Dillman Road to SR 45, of the new Bloomington bypass. The Commission expected to have the right of way cleared by August 1971, and contracts to be let by the end of that year.

Herald-Times photo, 20 December 1970. New road for SR 37 bypass west of Bloomington.

Four miles of the middle section of the Bloomington bypass, from SR 45 to SR 46, as shown in the newspaper photo above, was progressing quickly. This section was anticipated completed by 1 September 1971. The next section, however, was being re-let when the bids for the first round of contracts came in over engineer’s estimates. The second round of contract letting would commence on 26 January 1971, with “hopefully the contract will be let January 28.”

“Steele said eight separate projects – five highway and three bridge – are now under contract, including the Ind. 46 companion project which extends from the new four-lane Ind. 37 to Indiana University. There are six more projects to be let to contract in the entire relocation from White River to Martinsville.”

In October, 1971, contracts were opened for four projects as part of the new SR 37: the south section of the Bloomington Bypass; additional two lanes on the Martinsville bypass; bridges over Clear Creek and the Monon; and bridges over the Illinois Central Railroad. The Clear Creek/Monon bridge is a twin bridge, each with five spans. The IC bridge consisted of two bridges each with three spans. With these contracts, the only part of the new SR 37 that still needed to be opened to contract bidding included the Bedford bypass and from the north end of the Bloomington bypass to near the Morgan-Monroe County line. (Source: Bedford Daily Times-Mail, 26 October 1971)

1975: Interurban in Tipton County, 40 Years Later

On 27 April, 1975, the Kokomo Tribune ran a full page story about with the headline “Clues to old interurban road still traceable in Tipton County.” The first paragraph was: “TIPTON – Nearly 40 years after the last of Tipton County’s interurbans was abandoned, it is still possible to retrace their rights-of-ways.” Many are the stories that were included in that article. I want to share some of it here today.

Along the old interurban lines, at that time, were many things that can immediately show the location of the old right-of-way. Bridge abutments are the most obvious. But there were also concrete collars, placed around electric poles for the safety of the pole. These collars were four feet high. They lined both sides of the tracks.

But the article goes on to point out other things that aren’t so obvious.

“In a goat pasture about a mile west of Hobbs, the interurban roadway appears as a flat plateau running alone the south side of Ind, 28.” Hobbs, according to Google Maps, is where SR 28 and SR 213 come together. Just south of SR 28 on SR 213, at CR 150S, “utility poles cutting through a field mark the southern edge of the interurban right-of-way.” Between the two mentions places in this paragraph, “a 20-feet-wide strip has been removed from a woods along the highway.”

The Union Traction Company of Indiana operated two interurban lines through Tipton County. The first, which would include the locations from the previous paragraph, ran from Elwood to Tipton through Hobbs. The other ran north through Tipton County, starting in Indianapolis, and connecting Atlanta, Tipton and Sharpsville before leaving the county. Another line that was planned, and construction started, but was never finished, would have connected Tipton to Frankfort.

The article states that “it is easiest today to find the old routes in rural areas. Construction and growth in cities have covered up the old tracks there. The interurbans often ran alongside highways and regular railroads, and the rural folks have not been in a hurry to obliterate the roadbeds.”

The line crossing Tipton County from the south followed the old Nickle Plate tracks across the county into Tipton. The Interurban repair yards, known as “the shops” (as related by 76 year old Dempsey Goodnight, a lineman and conductor for 10 years for the Union Traction Company), were located just north of Cicero Creek at Tipton. Work on the traction cars happened at this location. An electric substation was also contained on the yard’s property. By 1975, the old two story building was being used by a seed company.

That right of way left the Nickle Plate right-of-way to go west on Madison Street. According to Goodnight, between Independence and East Streets, there “used to be a stucco house. I remember when a street car jumped the tracks here and hit the porch.”

The ticket and dispatch offices, as well as the freight house, were located at the corner of Main and Madison Streets. By 1975, the freight depot, located on the west end of the ticket/dispatch office, had been torn down and replaced.

The route through Tipton turned north on Main Street, west on Dearborn Street, and north on Green Street. A boarding house for travelers was located at 612 Green Street, according to Goodnight. From there, the line headed northwest toward Sharpsville and Kokomo.

Jefferson Street was the entry point into Tipton for the line from Elwood, and made a loop in the downtown area. That loop was south on Independence Street, west on Madison Street, north on West Street back to Jefferson Street and its trip back towards Elwood.

“When the interurbans were built, the 75-foot utility poles were set in concrete. As the lines were abandoned, the poles were removed but many of the concrete bases were left in place, now looking like old lawn planters.”

Between Tipton and Hobbs, the old ROW was located about 20 feet south of SR 28. At Hobbs, the interurban followed CR 150S until just east of the SR 213 intersection, where it followed the old Norfolk & Western tracks, along the south side of the ROW, for four miles. Near CR 700E, the interurban veered south, just to turn back north to cross the N&W on a viaduct..

The ROW south from Tipton followed the old Nickle Plate as far as CR 500S, where it moved to the west around a cemetery. It then turned east again to cross a road, railroad and a creek. One of the abutments for that overpass still exist along CR 100 W and the Nickle Plate tracks, as seen here.

It looks like there may be a road trip in my future to see what is actually left of these two interurban lines. From what I can tell from Google Maps, there isn’t much. But, inquiring minds want to know. And If nothing else, I have an inquiring mind.

All photos in this blog entry came from the Kokomo Tribune of 27 April 1975 and were taken by Ron Sentman.

Removing the Bluff Road Bridge Over the Illinois Central/Indiana Railroad

The year is 1902, and the Indianapolis Southern Railroad has just been chartered to enter the city of Indianapolis and rumble through the Marion County countryside south of the city. Once the railroad entered Perry Township from Center Township (at what is now Troy Avenue), the railroad right of way followed the survey line one mile west of the Three Notch Road (Meridian Street) and two miles west of the Range Line (Shelby Street). Just south of what would become Stop 8 Road, now Edgewood Avenue, the railroad crossed the Bluff Free Gravel Road.

Rail and road traffic near this intersection of the Indianapolis Southern and the Bluff Road wasn’t a real problem for several years after the building of the railroad. In 1914, the Bluff Road was to become part of the Dixie Highway. This highway, connecting south Florida to Chicago and northern Michigan, actually connected to Indianapolis, the hometown of its creator, in four different directions. This led to a traffic increase along the Bluff Road, creating more problems at the railroad crossing which was at a very bad angle to begin with.

The problem was made worse when the state took over the Bluff Road in 1923, making it original State Road 22. This made the Indiana State Highway Commission responsible for the maintenance of the very old road. In 1925, the state decided that enough was enough, and a bridge was built over the Indianapolis Southern railroad, which had become part of the Illinois Central.

The bridge that was built was a very narrow facility. Two lanes wide, at best. But it would serve its purpose, creating a safe crossing of the Illinois Central by SR 22, or as it would soon become, SR 37. And it did just that until the state started moving SR 37 to the west in 1964, and completing the job in 1965. The overpass then became property of Marion County. And here is where it went downhill.

MapIndy 1937 aerial image of the Bluff Road bridge
over the Illinois Central Railroad.

Reconstruction work on the deteriorating span was scheduled in both 1971 and 1977. The Indianapolis Transportation Board posted a long list of bridge projects for that year in newspapers in mid May 1971 and early April 1977. By 1984, the city was looking at removing the bridge all together. Unfortunately, getting the right of way to do this proved troublesome. The bridge was built with very little clearance when it came to the actual right-of-way used. It was suggested by John Willen, DOT Chief Engineer, that land acquisition was a problem, and that the bridge would not be replaced due to decreased rail traffic at that location.

Legal notice was published in the newspapers in December 1984 that the Indianapolis Department of Transportation, with the cooperation of the Federal Highway Administration and the Indiana Department of Highways, had decided that the overpass on Bluff Road over what was then the Illinois Central Gulf Railroad would be removed and an at-grade crossing would be put in its place. “The proposed project begins at a point approximately 210 feet south of Banta Road, then extends in a northerly direction mostly along the existing alignment of Bluff Road, and terminates at a point about 750 feet south of Edgewood Avenue for a total project length of 0.42 mile (2,210 feet).” In addition to the removal of the overpass, the following was listed as part of the project: “The portion of Bluff Crest Drive between Bluff Road and Bluff Crest Lane, approximately 280 feet will be removed and Bluff Crest Drive access to Bluff Road will be terminated.”

MapIndy aerial image from 1986 of the
Bluff Road bridge over the Indiana Railroad.

In September 1986, the city of Indianapolis introduced a resolution to implement a five ton weight limit on the overpass. The notification of the resolution in the newspapers of the time stated “whereas, the Indianapolis Department of Transportation Street Engineering Division was notified that certain portions of this structure had a stage of deterioration.” Prior to this, the bridge had had a ten ton weight limit. In May 1987, the bridge was closed completely as the city of Indianapolis decided it would be better off replacing the structure with an at-grade crossing. The city reported that the work would be completed by 15 July 1987. The original plan to remove Bluff Crest Drive was apparently just dropped along the way. That residential street still connects to Bluff Road in the same location as it had before the removal of the overpass.

On 29 July 1987, the Indianapolis Star announced that “Bluff Road, closed since April from Banta Road to Edgewood Avenue for extensive reconstruction, was reopened for traffic Tuesday (28 July 1987).” The project cost the city $540,000 and involved the removal of the “severely deteriorated Indianapolis Southern Railroad overpass built in 1925.” Even in the end of the overpass’ life, the newspaper still called it the Indianapolis Southern instead of the company that had taken it over just the year before, the Indiana Railroad.

The Pennsylvania Railroad in Indiana After the Civil War

The United States Civil War, or War Between the States, had a very profound effect on the railroads in place at the time. The Union had a vast railroad network, and used it to help in the war effort. Indiana saw a large increase in rail traffic as troops and war materials went one way, and prisoners of war came the other. But after the war, there were some questions as to what was going to happen to the rail industry.

During the four years of the war, maintenance was put off as long as it could be, and rolling stock had been beat to almost death. There was some hope that the post-war era would lead to a “quieter” time along the lines. But like every war since, that quieter time almost led to the collapse of some of the rail lines due to overbuilding…and a lot of consolidations to make stronger, supposedly more financially secure, roads.

Between 1861 and 1865, rail capacity had increased due to the traffic demands. While this helped during those years, afterwards, it would be a hinderance to the companies that spent that money for that capacity.

The first thing that happened after the war was the companies started plowing their war profits back into getting the rail lines in shape. This would take a lot of that money. Add to that the almost expectant recession as industrial output had to slow down from war time highs. Passenger rates were rising due to the increased costs. The railroads were taking a public relations hit due to those rate hikes.

Competition for traffic between Chicago and the east coast (whether New York or Philadelphia) had already brought on a series of freight rate cuts as early as 1861. The traffic was there, the question was which railroad was willing to do what it took to get it. By 1865, the Pennsylvania Railroad was already telling its investors that eastern railroad mileage was far outpacing the business requirements for the area.

Indiana found itself in the middle of the consolidations. One railroad, the Cincinnati & Chicago Air Line, had a working relationship with the Baltimore & Ohio to bring traffic from the east coast to as far as Valparaiso, where it had to depend on the Pittsburgh, Fort Wayne & Chicago to carry that traffic into Chicago. The building of a new road, the Chicago & Great Eastern, let the C&CAL have a second, and preferred, route into the Windy City. This would bring the C&CAL out of its poverty, and allowed, as stated in the Lafayette Journal, the railroad to “rival and damage her own haughty mistress, the Pittsburgh, Fort Wayne & Chicago.”

One railroad, which had depended on handshake deals and friendly connections to expand its own traffic across Indiana was the Pennsylvania Railroad. A lot of this was due to the management in Philadelphia that balked at investing in any road that would be outside the scope of its mandate – to connect Philadelphia and Pittsburgh. Yes, the company did invest in other routes. But most of the time, it was to allow agreements between those independent routes and the Pennsy. But that attitude in Philadelphia was about to not only be tested, but thrown out the window when the age of the robber baron started.

Speculator Jay Gould forced the Pennsylvania to wake up from its conservative slumber. Gould had swept in to buy the Erie, a weak road that ended in New York. Gould knew that he would have to increase the footprint of his railroad if he was to salvage a massive investment in his company. He set his sights on the Indiana Central. Traffic along that road mostly came from the Panhandle, a Pennsylvania company that connected to Columbus, Ohio. The Indiana Central carried that traffic on to Indianapolis. The Panhandle found itself dependent on the IC, but they did have a handshake agreement between the two companies.

At this time, the IC not only connected the capitals of Indiana and Ohio, but had purchased other routes that could carry traffic to Logansport, and from there, to Chicago. The IC had also acquired the Great Eastern and the C&CAL. The entire line, in 1868, had become known as the Columbus, Chicago & Indiana Central.

Gould swept in to purchase large blocks of stock in the CC&IC. So much so that the management of the line agreed to, if Gould wanted, allow the Erie to lease the road. The Pittsburgh, Columbus and St. Louis Railway, known as the Panhandle, was basically controlled by the Pennsylvania. But this was not by ownership, the PRR didn’t actually own it. The PRR did, however, have a large amount of the company’s bonds as investment in the building of the line. Gould’s possible lease of the CC&IC scared the PRR into action.

But Gould would not be defeated. While his financial resources were limited compared to the Pennsylvania, he would do what it took to put the PRR on its knees. While playing around with the CC&IC, he also showed interest in the PFtW&C. When the PRR took over the CC&IC, Gould tried to pry the already restless PFtW&C from the PRR’s hands. Again, it was a friendly agreement between the PRR and the PFtW&C. And the PFtW&C blamed the PRR for diminished value due to traffic congestion at Pittsburgh. Gould had acquired controlling interest of the shareholder votes.

PRR management in Philadelphia, which still saw their city as the most important city on the east coast, feared that control of the PFtW&C by the Erie would route traffic to New York instead of Philadelphia, worked with the management of the Fort Wayne to lease the road out from under Gould for 999 years starting in July 1869. This would require the PRR to pay a 12% dividend on Fort Wayne stock for the duration of the lease. It didn’t come cheap, but the PRR saved its connection to Chicago.

By 1871, the Pennsylvania had acquired control of both the Panhandle and the Fort Wayne. The Panhandle had already leased the Jeffersonville, Madison & Indianapolis, allowing its traffic to connect, via the only bridge across the Ohio at the time, into Louisville…and the southern traffic that ended there.

The major stumbling block, at this point, was west of the Hoosier Capital. Traffic was routed onto the Terre Haute & Indianapolis, which was staunchly independent. The Pennsylvania had invested heavily into a line that connected Terre Haute to St. Louis, Missouri. But the fear that the TH&I would not cooperate with the dreaded PRR when it came to traffic led the PRR to team up with interests that would become the Big Four to build a separate line connecting Indianapolis to Terre Haute. That line would be called the Indianapolis & St. Louis, and would leave Indianapolis on a due west route through Danville.

If the Terre Haute & Indianapolis would not play ball with the Pennsy, it would still have a route to get to the Mississippi River. The TH&I would later fall into the Pennsylvania fold, but that was after a merger with the Pennsy controlled St. Louis, Alton & Terre Haute, known as the Vandalia.

The Pennsylvania also invested, in 1869, in another company that would have, were it built to its intended extent, connect Indianapolis to Cairo, Illinois. But that company only made it as far as Vincennes. While the Pennsylvania had members of the Board of Directors as early as 1872, the formal lease wouldn’t occur until 1879.

Most of the Pennsylvania Railroad holdings in Indiana were added to that company by 1870. Those companies would operate as separate entities until the 1920’s, when they were all consolidated into the Pennsylvania itself.

Road Trip 1926: A Recap, and a Couple of Other Articles

For those of you that found the Road Trip 1926 series interesting, I wanted to post a recap, and a link list, to all of the articles in the series, and a couple of articles that I wrote before I started posting the series.

The Road Trip 1926 series started on 14 June 2019, and ran in numeric order, with the exception of US 52 and SR 11, until 9 May 2020. Almost a year. I didn’t realize that it took that long to do the entire run.

Planned “Road Trip 1926,” SR 67, and Romona, Indiana: When I originally did the Road Trip 1926 series on Facebook, I found my attention being dragged to a point on SR 67 called Romona, a town along the old road and the Indianapolis & Vincennes Railroad. It wasn’t too long before the road was routed around Romona, and the town became a dead end at Mill Creek. I am hoping to make this particular Road Trip 1926…and plan to drag my way back to the dead end that is Romona. And an old state road bridge that is still back there. That is, if I can do it legally.

Planned “Road Trip 1926,” SR 9 and Mount Etna, Indiana: Part of the original Indianapolis-Fort Wayne State Road, the section of the original SR 9 near Mount Etna was moved for one major reason: the building of Salamonie Lake. The old road became just a bit flooded when the lake was built.

And now, the link list for the complete “Road Trip 1926” series.

SR 1
SR 2
SR 3
SR 6
SR 7
SR 9
SR 10
SR 11
US 12
SR 15
SR 16
US 20
SR 22
US 24
SR 26
US 27
SR 28
SR 29
US 30
US 31
SR 32
SR 34
SR 35
US 36
SR 37
SR 39
US 40
US 41
SR 43
SR 44
SR 45
SR 46
US 50
US 52
SR 53

SR 54
SR 55
SR 56
SR 57
SR 59
SR 61
SR 62
SR 63
SR 64
SR 65
SR 67
US 112
US 150

I-465 Construction, the PRR and Madison Avenue

Indianapolis served as a railroad capital for many years before the coming of the automobile. Since surface roads connected Indianapolis to many points in the state in many directions, it was logical that the coming of the automobile would lead to a concentration of automobile routes. But those were still subject to the locations of railroads. The interstate would change all that.

The purpose of the interstate was to create a high speed, limited interruption traffic flow. This, by definition, would require the new interstates to deal with going over or under those rail routes. Most of those intersections were accomplished with the interstate going over the railroads. And these overpasses are high, due to the clearances that were going to be required by the railroads at the time.

If one looks at a map of Interstate 465, one would notice that there is only one railroad bridge over the interstate. That bridge is the original Madison & Indianapolis, then Pennsylvania Railroad, on the southside. The reason for this really came down to the location of the interstate more than anything else.

When the interstate’s location was decided, it would follow closely to the original chosen location to SR 100 which it was replacing. That original location, in terms of Indianapolis modern street names, was Shadeland Avenue, 82nd/86th Street, High School Road, and Thompson Road. A quick glance at a map shows this.

On the southside, through the south central part of the county, this led to the interstate route traversing through the Lick Creek “valley.” The Pennsylvania Railroad already had a bridge over Lick Creek in the area. That same bridge also crossed the road leading into what was Longacre Park (being turned into a trailer park from September 1963), which had been in that location since 1926.

Louisville & Indiana (former Madison & Indianapolis/Panhandle/Pennsylvania Railroad) bridge over Lick Creek and Lick Creek Parkway into Longacre Mobile Home Park. This Google Maps image was sampled on 10 May 2020, from an image captured in June 2019. This image shows both the original bridge and the 1964 concrete expansion places on top to raise the level of the railroad.

The level of the railroad over that section of the coming interstate was right around 13 feet above ground level. This amount of clearance wasn’t enough for the State Highway Commission. This would require the Pennsylvania Railroad to raise the level of the railroad about three feet. This can be seen by the concrete extension over and above the old stone bridge over Lick Creek and Lick Creek Parkway just south of the interstate.

Google Map aerial photo of the Louisville & Indiana crossing of Interstate 465. Image was sampled 10 May 2020.

The Indianapolis Star of 27 March 1964, in a news story announcing road closures throughout the area, mentions that “Lawrence Street will be blocked for two weeks while the Pennsylvania Railroad elevated and repairs the tracks in connection with Interstate 465 construction.”

Also at work at the time was the Madison Avenue crossing of Interstate 465. Before the coming of the interstate, Madison Avenue had been a two lane state road, SR 431, south of Shelby Street. The main access to Longacre Park was actually north of Lick Creek, as shown in the following 1952 aerial photograph from MapIndy. The trailer park along Madison Avenue at Redfern Drive would come into direct play when I-465 started construction through the area.

1957 MapIndy aerial photograph of the Lick Creek area from Madison Avenue to Longacre Park.

Before the interstate construction would reach the area, a redesign of the Madison Avenue crossing of the area was already in process. The new bridge across the future interstate and Lick Creek would be two lanes in each direction. To accommodate this construction, a new, temporary, Madison Avenue would have to be built to bypass the area of the new bridge. Also, utility lines would also have to moved to the east.

1962 MapIndy aerial image of the area of Madison Avenue and Lick Creek.

The image to the left is the 1962 aerial photograph of the area from MapIndy. It shows the bypass Madison Avenue being built through the mobile home park at Redfern Drive mentioned above. The bypass would start south of the current Lick Creek Parkway, and reconnect to Madison Avenue right at the angled intersection of Shelby Street. The bypass route can be seen as the brighter road through the left center of the photo. (It hadn’t seen traffic yet, and as such was brand new concrete.)

Some people have wondered why Madison Avenue is the only (former) State Road that did not have an interchange with Interstate 465. Spacing is the only answer I could come up with. The Pennsylvania Railroad is one-quarter mile, or so, east of Madison Avenue. East Street, the US 31 bypass built in the early 1940’s, is one half mile west of Madison Avenue…not counting the ramp lengths. Shelby Street is one half mile east of East Street through its entire length through Marion County.

1962 MapIndy closeup aerial photo of the Madison Avenue bridge construction over future I-465 and Lick Creek.

The bypass Madison Avenue built in 1962 would become the frontage road in what was later the Madison Mobile Home Park. It is now called McConnell Way. A quick glance at utility lines through the area show that they weren’t been moved back to the side of Madison Avenue after construction was completed. The following aerial photograph, from 1972, shows the construction through the area completed.

1972 MapIndy aerial photograph of Madison Avenue and (then) Penn Central crossing of I-465 and Lick Creek.

For those interested, the cover photo for this post is the same area shown in all the other photos as would have been seen in 1937. That image is also from MapIndy. MapIndy is available online at: http://maps.indy.gov/MapIndy/index.html.

Lafayette Rail Relocation

Cover photo courtesy of Justin L. Grayson, as was the idea for the post.

When the railroads started coming to towns across the United States, it was a sign of prestige to have a railroad company build a line through the middle of a city street. While the towns thought it was something to be proud of, crossing the tracks was almost impossible. Lafayette was a town of rail crossings…and street running. As I have written about before, Lafayette was the home of several railroad lines. But toward the middle of the 1990’s, this was going to change…with the help of a lot of federal, state and local tax money.

1941 USGS Topo Map of downtown Lafayette, IN.

The actual beginning of discussions about relocating railroad tracks through the city of Lafayette occurred in 1926, when the city first proposed such relocations. Between 1963 and 1973, a series of engineering studies were commissioned by city officials to look at the possibility.

The idea of moving the railroad tracks through Lafayette started moving forward in 1974, when a study was conducted by the Stanford Research Institute (SRI). It was announced by Mayor James Riehle, on 11 July 1975, that a project director was named for the relocation. That director would be Herbert Thomas, vice-president of transportation at Kaiser Engineers, Inc. His local resident manager would be James Ellis.

It was also announced that day that the first two phases of the project would be completed in about ten months from that time. Phase one included the above mentioned SRI study. Phase two would consist primarily of engineering. The final two phases, design and construction, were not put on any schedule as of July 1975.

Mr. Thomas said “relocation plans here are not the biggest he has seen in the country, but said ‘the Lafayette project would be a major one for any city,'” as reported in the Lafayette Journal and Courier of 12 July 1975. He also referred to the “railroad-motor vehicle situation in Lafayette ‘a serious problem,’ noting that on a previous visit he was stopped by a train while hurrying to reach Weir Cook Airport.”

According to the Journal and Courier, “one important aspect of the Kaiser work will be to determine if the negative impact on the Monon Avenue area can be lessened.” Thomas said that “the alignment developed so far can only be reguarded (sic) as preliminary.”

One year later, in July 1976, Kaiser Engineering was set to begin look at the various alternatives to the new railroad location. Project Manager Ken Knevel said that the company would concentrate its work on the riverfront corridor since it received the most support locally. “Everything we’re doing now is just in response to individuals’ comments. The riverfront has been indicated as the preferred corridor.” (Source: Lafayette Journal and Courier, 24 July 1976.) Paul Stitt of the Norfolk & Western and Jack Smith of the Louisville & Nashville both agreed that the riverfront corridor would be best for both their companies’ operations. Conrail’s representative, John Partridge, said “otehr alternative corridors – bypassing the city and using the current N&W and L&N lines – is less satisfactory than the riverfront.”

The Louisville and Nashville, by way of their purchase of the Monon, was running trains through the middle of Fifth Street at the time. However, they did own a stub line that started just north of Main Street (and the Main Street bridge across the Tippecanoe River) traveling northeast to connect to the the street running route, and railroad yards, northeast of Fifth Street. Connecting this stub to the Nickel Plate and Wabash two blocks south along the riverfront would not be that much of a stretch.

Funding was going to be a constant problem, especially from the mid-1970’s to 1980. Washington had become very tight fisted when it came to money. The mayor of Lafayette had gone to Washington DC in March 1977 to ensure that funding would be available for the project through 1980. There were no guarantees.

There were as many as 19 railroad relocation projects in some sort of process in the late 1970’s. Lafayette had gained national attention because it involved consolidating three railroad companies into one line through the city.

Between 1976 and 1978, two neighborhoods were the focus of studies for the relocation plan. Those neighborhoods, the Wabash and the Monon, were going to be directly affected by the moving of the tracks.

The first construction phase finally started in October 1984, when Congress appropriated $7 million. Less than a year later, in September 1985, five homes were torn down to prepare to place Wabash Avenue 23 feet below the relocated train tracks. Things started looking bad again in 1987 when a pending Presidential Veto threatened $20 million in funding over five years for the project…and the insistence from Federal officials that state and local governments pony up 20% of the cost. Something in which INDOT said they weren’t really keen on participating. That veto was overridden by the House and Senate.

The next phase of construction after the override of that veto included a replacement for the Main Street bridge over the Wabash River, new approach ramps to the Harrison Bridge (now Old US 231) and a rail corridor between Ninth Street and Wabash Avenue to replace the Fifth Street street running tracks. A new $11 million North Ninth Street rail underpass was scheduled to being construction in late 1987.

Construction photo of the Lafayette Railroad Relocation, date unknown. Photo courtesy of Justin L. Grayson.

By 1994, the street running along Fifth Street had come to an end. According to the Journal and Courier of 22 July 1994, those were “crossings eliminated today.” Also according to the same newspaper graphic, phase 5 was to be completed in 1998-99 that would relocate the Norfolk Southern’s Wabash double-track corridor to the riverfront route, eliminating 24 crossings from Kossuth Street to Underwood Street.

Lafayette Courier & Journal, 2 August 2003,
announcing the end of the Railroad Relocation
Office in Lafayette.

The project’s offices would finally closed down on 1 August 2003. There were a lot of behind the scenes work that needed to be finished by the office, but the relocation was done. There was also one thing, historically, that was brought up when construction was occurring in 1993. While digging up the foundation of the old Big Four Station in Lafayette, some timbers from the Wabash & Erie Canal were found. The officials with the Railroad Relocation sent those timbers to Columbia, SC, for preservation. They were returned to Lafayette and given to the Tippecanoe County Historical Society for display.

The project would cost a grand total of $186 million in the end. It would not only affect rail transport through the area, but road transport changed as well. The old Main Street bridge in downtown Lafayette was changed to a pedestrian facility. Ultimately, all INDOT facilities in the city itself would be removed…leaving no state or US roads to downtown.

Beech Grove Traction

1906. A rural station stop on the Big Four Railroad, originally called Ingalls (or Ingallston), has just been incorporated as a shop town for the same Big Four Railroad. It’s official name at this point became Beech Grove. The new town that grew from the building of the railroad shops, covered in my blog entry “Beech Grove,” found itself barely accessible by anything other than the very railroad that built it. It wouldn’t be long until that would change.

First, the town was actually accessible by route of an old toll road that had been built to reach the farm of a local resident, a Mr. Churchman. That road, for the longest time, had been called the Churchman Pike, even after the county bought it back from the toll road company. The Churchman Pike connected to the town via what would become Albany Street, a survey section line that also acts as the separator between all of the southern townships and the central townships in Marion County. Dirt roads along the other survey lines – which would later become Troy and Emerson Avenues – also led to the area that would become Beech Grove. The old train station, Ingalls or Beech Grove, was at the survey line (Emerson Avenue) and the railroad track. Today, that would be under the Emerson Avenue bridge over the railroad.

But it wouldn’t be long before another method of transportation would make its presence known, and try to work its way into the railroad city. Electric Traction, also known as the interurban, had made its way into Indianapolis, officially, with the opening of the Greenwood line on 1 January 1900. After that, companies started popping up all over the United States. And Indianapolis became a hub for the new transportation form.

But this would create a problem. Steam railroads, which all standard railroads were called at the time, saw the new Traction companies as direct competition. Even though the gauge (width between the tracks) was the same on both, traffic interchange was one of those things that the steam roads were going to keep to an absolute minimum. And since the Traction companies specialized in moving people, this was even more reason for the steam roads to dislike the interurbans.

And now someone wants to add an interurban route to a town BUILT by the railroad? The short answer…yes. The reason for this was actually based in the nature of the steam railroad itself. Passenger trains, taking people from Beech Grove to downtown Indianapolis, weren’t scheduled at very convenient times for citizens of the new town. While the company that had invested in, and created, the town, the Beech Grove Improvement Company, tried running its own special trains to downtown Indianapolis, it was at the whim of the very busy Big Four line from Indianapolis to Cincinnati. In comes the planners of the electric traction.

It started in 1909. A company called the Shore Line Traction Company applied for a franchise to run a traction line from the Indianapolis city limits (point unknown) to Beech Grove. Louis McMains, a real estate agent, put in the petition to the County Commissioners. In October 1909, the petition asked that the Shore Line Traction Company be allowed to use the Churchman Pike from the city limits near Keystone and Churchman Avenues to the corporation limit of Beech Grove. It also asked for some straightening work along the road, and the right of way be widened by 27 feet (adding 13.5 feet on each side). “The petition signifies that the property owners on each side of the pike are willing to part with the necessary land to widen the road.” (Source: Indianapolis News, 14 October 1909)

The county had problems with the widening…especially when it came to the Churchman Pike bridge over Bean Creek (between Walker and Southern Avenues today). The bridge had been in disrepair for years, listed as such as early as 1891. Whether the bridge had been repaired or replaced at this point is unknown. Suffice it to say, the county wasn’t really likely to spend money to replace the bridge.

The petition mentioned that the plan for the Churchman Pike is to widen it to 66 feet, allowing two tracks to be built in the center, with only one track being built to start the company. The new company already had a franchise in hand for the route inside Beech Grove itself.

The Shore Line Traction Company found itself trying to come up with a new route to Beech Grove when the county balked at the Bean Creek bridge. With that, the company was not heard from again.

But shortly after the above petition was filed, a new company would be incorporated – the Beech Grove Traction Company. This company was officially started on 30 December 1909. It had the same goal as the Shore Line Transit Company – connect Beech Grove and downtown Indianapolis.

There was more progress with the Beech Grove Traction than there was with Shore Line. The Indianapolis News of 2 April 1910 reported that the Beech Grove company had elected its corporate officers and announced that grading work would begin soon on the line. Rails, ties and cars had already been ordered. Work on the new Churchman Pike bridge over Bean Creek had begun on 28 March 1910. Officials of the traction company were negotiating with the Indianapolis Traction and Terminal Company “for use of the tracks of the latter company in Shelby Street and Virginia Avenue for entrance to the business district.”

The franchise rights had been awarded by Marion County and the town of Beech Grove. When construction was to begin in April, the company had no agreement with the city of Indianapolis about using the city street railway tracks to enter the downtown area. This agreement would not have been reached until September 1910. This caused construction to be delayed until November 1910.

Even before the track was complete, the first train run over part of the line happened on 20 March 1911. Seven days later, regular service began. The Beech Grove end of the line was on what became Garstang Avenue east of First (Emerson) Avenue. The track then ran north on First Avenue to Main Street. Following Main Street west, it turned north on 17th Avenue (Sherman Drive) for one block, to turn northwest on Churchman Pike (Avenue). The route then turned west on LeGrande Avenue to connect to the city street railway system at Shelby Street.

1917 Map of the route of the Beech Grove Traction Company.

At first, the company found itself very popular. The Beech Grove Traction only owned, at the start, four cars to travel between the two ends. But there were so many people that wanted to use the new train that the company found itself running trains every 40 minutes from daybreak to midnight. The time table showed that first car left for Indianapolis at 0530, with the first car from Indianapolis arriving at 0610. A nickel would get a rider from Beech Grove to Shelby Street and LeGrande. A dime would get you all the way to the Traction Terminal.

Now, one might ask about why someone would get off the interurban at Shelby Street. Rightly so. But a trip to Garfield Park would require a change to a city street car. Or, one could catch the interurban to Greenwood, Franklin, Columbus and even Louisville at the end of the city Shelby Street line…which was at the Greenwood Line Stop 1 at Perry Street, south of Troy Avenue, on Shelby Street.

But business along the Beech Grove Traction line would start falling off rather quickly. The Big Four, with the completion of the traction line, stopped issuing passes to employees and families to ride the steam train. This made the interurban the best way to get to downtown Indianapolis. In the early days, most traffic was Big Four shop employees coming to and from work from their homes in Indianapolis. Due to the success of the town of Beech Grove, these employees were moving to the town. This caused a drop in traffic on the traction line. And due to shops being built along Main Street, the traffic drop wasn’t made up for in shopping trips to the stores of downtown Indianapolis.

By 1914, an average of 24 round trips ran each day along the line, with a schedule of 1 hour 10 minutes between trains. That had slowed down to 16 round trips a day by March 1916. And, as is typical of Indiana railroads of the time, the Beech Grove Traction Company found itself falling into receivership in December 1917, caused by increased costs without the subsequent increase in revenue.

Lawsuits were filed. Newspapers reported that the traction line wouldn’t be necessary for much longer, since with the improvement of city streets, bus service between Beech Grove and Indianapolis would replace the electric traction line. In a strange twist of fate, the operator of the bus competition to the Beech Grove Traction ceased his bus company and took over the traction line as railway superintendent. Fortunes improved…for the time being.

One of the things that the line started was carrying mail from the Fountain Square post office to the post office in Beech Grove. This started shortly after completion of the line until it was discontinued in the late 1920s.

The little line lumbered on for almost two decades after receivership…barely. It was recommended in November 1923 that the line be closed and sold. Revenues increased with the permission given to raise fares. But the company found itself sold to make up $30,000 in debt due to maintenance and new rolling stock in 1925. The new buyer made a condition – if a bus line was approved, the sale would be null and void, and the line would be junked. Again, lawsuits were filed, and a bus line was granted an injunction to operate. And the bus company was purchased by the traction line…and both were operated at the same time. It found itself teetering financially, yet still managing to survive.

The Great Depression hurt the line, just like it did almost everything else at the time. But it managed to survive…for a while. The Public Service Commission of Indiana, on 7 January 1937, officially told the company that it was to close the line. Indianapolis Railways, the power provider for the line, complained to the PSCI that Beech Grove Traction owed in the neighborhood of $20,000 for power…which Indianapolis Railways turned off at 0100 on 8 January 1937. And hence, the end of the Beech Grove Traction line. Some people hadn’t seen the notices about the end of service, and were waiting at stops on a cold 8 January morning.

The last vestiges of the traction company would last until 21 August 1973. The company’s car barn, at First and Garstang, would last until demolition started that day.

Westfield Boulevard Bridge Over White River

Indianapolis News photo, 2 October 1974

1891. A steel bridge was built to cross the White River north of Broad Ripple on what was then called the Indianapolis & Westfield Free Gravel Road. As was typical of the time, the bridge crossed the White River at a 90 degree angle, making for the approaches, especially the southern approach, were a little tight. The bridge would be used until the city of Indianapolis would have to tear it down in 1977.

The bridge built in 1891 was a replacement for a bridge that had served for many years at the location. The road had been originally built as the Westfield State Road in the 1830’s. Later, in the late 1840’s, the road would be sold to a toll road company for maintenance and to become a turnpike. This would last until the late 1880’s, when it was purchased back by Marion County for the free use of travelers. It would still be the Free Gravel Road when the new bridge was built.

The original road would cross the river as shown in the 1972 aerial photograph above. The sudden right turn approaching the bridge from the south would later create a bottle neck that the State wanted to take care of…or just bypass altogether.

In the mid-1910’s, the old Westfield State Road would acquire a new name: the Range Line Road, an Auto-Trail that would connect Indianapolis to Kokomo and Peru through Westfield. The Range Line Road gained its name because it followed the survey line that separated Range 3 East and Range 4 East in the survey that divided Indiana into one mile square sections.

Another name was given to the road in 1917 – Main Market Road 1. This was the predecessor to State Road 1, which this became in 1919. This brought the Westfield Road, and its two lane bridge over White River into the state highway system. But it wouldn’t be long until the Indiana State Highway Commission discovered the errors in the naming of this route as a major State Road. While in Indianapolis, and up to what is now 86th Street (later SR 534/100), the road was winding and narrow.

Part of being part of the state highway system is that state roads are, with very few exceptions, automatically truck routes. And running trucks through Broad Ripple, even today, could best be described as “fun,” at least sarcastically. The old state road followed Westfield Boulevard from Meridian Street until it turned north in Broad Ripple…making the turn at Winthrop Avenue and the Monon Railroad tracks interesting. It also gets tight while hugging the White River.

The state would bypass this section of US 31 by building a new road straight north along the Meridian Street corridor. This caused a lot of protesting from the people of Carmel, fearing that their main drag, Range Line Road, would be left to rot, and travelers would be guided around the town. While US 31 bypassed this section, it would be given a replacement state road number: SR 431.

Meanwhile, the White River bridge lumbered on. By 1931, SR 431 was now using the facility. It would stay that way until the building of I-465…which would cause the state to move SR 431 from Westfield Boulevard to Keystone Avenue. The state’s maintenance of the White River bridge would end in 1968.

It didn’t take long for the bridge to fall into disrepair. By 1974, it was recommended to the city that the road and bridge be closed completely to traffic. If not immediately, at most within the next two years. The city would lower the weight limit to five tons in 1974. But this did not solve the pending problems with the bridge. In addition, around the 7300 block of Westfield, was another bridge over what is known as the “overflow channel,” a small White River cutoff north of the main channel of the river. The bridge over the overflow channel was in as bad or worse shape than the truss bridge in the 6700 block of Westfield.

1972 MapIndy aerial photograph of the Westfield Boulevard bridge over the White River Overflow Channel in the 7300 block of Westfield Boulevard.

The main bridge would be closed in 1977 for the building of a replacement of the facility. Business owners of Broad Ripple, as early as 1974, had been arguing for either fixing or replacing the bridge in place. Their discussions concerned the fact that straightening the road would allow for high speed traffic to come in through “Broad Ripple’s back door.” Keeping the tight and winding approaches to the White River bridge would slow traffic down before entering the neighborhood. Both ideas were continuously shot down by the city of Indianapolis, the owners of the facility. The City went so far as to recommending that Westfield Boulevard be closed between Broad Ripple Avenue and 75th Street, thus removing the need to replace the bridge altogether.

As it turned out, the bridge would be replaced. Or, more to the point, bypassed. The next photo, a 1978 aerial taken from MapIndy, shows the new bridge and the old bridge it replaced. The old bridge would be completely removed from aerial photos the following year.

1978 MapIndy aerial photograph showing the replacement Westfield Boulevard bridge over White River, and the location of the old bridge.

The new bridge would open on 12 June 1978. But the road wouldn’t. In an example of just fantastic government planning, the Overflow Channel bridge would be closed in either August or September of 1978 for replacement. This would cause the new bridge to be used for only local traffic until the following year, 1979, when the new overflow channel bridge would be completed.

1993 aerial MapIndy photograph showing the Westfield Boulevard bridge over the White River Overflow Channel (7300 block of Westfield Boulevard). Also shown is the abandoned Monon Railroad, prior to the creation of the Monon Trail.

With the opening of the Overflow Channel bridge, Westfield Boulevard was opened again for traffic from Broad Ripple to Nora…and hence north to the downtowns of Carmel and Westfield. While reaching downtown Westfield using the old road has become more difficult with the redesign of US 31 through Hamilton County, it still can be followed on maps – and for the most part in cars, as well.

National Road at Reelsville

1952 USGS topographic map of the Reelsville area.

When the National Road came to Indiana, part of the requirements for the building of the road was that it be in as straight a line a possible connecting Indianapolis to Vandalia, Illinois (then the capital of that state). Southwest of Indianapolis, the terrain got a little rough to be able to maintain a straight line. Especially in Putnam County. But the surveyors did a very good job in keeping it as straight a line as possible.

1864 map of southwestern Putnam County courtesy of the Library Of Congress. The National Road runs through the southern part of Section 19, the center of Sections 20 through 23. The Big Walnut Creek bridge that washed out in 1875 is in the eastern central portion of Section 20.

And so, the National Road chugged along for around four decades. In 1875, a bridge over Big Walnut Creek, southwest of Reelsville was washed out…and not replaced at the time. Since the National Road, at the time, belonged to a private company, they decided to reroute the road through the town of Reelsville. This would solve the connection problem, road wise, between Terre Haute and Indianapolis, but would create a few more while it was at it.

The Terre Haute & Richmond (TH&R) Railroad was chartered on 24 January 1847 to connect the two title cities through Indianapolis. By 1852, the TH&R had built a railroad connecting Terre Haute to Indianapolis. This railroad, near Reelsville, was to the north of Big Walnut Creek from where the National Road was, and connected to the town of Reelsville proper. There was even a station at Reelsville. On 6 March 1865, the Terre Haute & Richmond became the Terre Haute & Indianapolis.

The National Road replacement route took travelers up a long hill into Reelsville. At the town, the new road, which had been in place long before being used as a bypass, followed and crossed the TH&I several times before reconnecting to the original National Road. These railroad crossings were considered some of the worst in the state, especially due to the angle of the crossing.

1912 United States Postal Service map of southwestern Putnam county showing the roads around Reelsville. Notice that the National Road, marked as Mail Road RE 2 east of Reelsville, does continue after turning north to enter Reelsville proper. The old road did still contain houses, even though through traffic had been gone from the route for 37 years.

The Terre Haute & Indianapolis Railroad ceased to exist as a separate entity on 1 January 1905. That was the day that the TH&I, the St. Louis, Vandalia & Terre Haute, the Terre Haute & Logansport, the Logansport & Toledo and the Indianapolis & Vincennes merged to become the Vandalia Railroad Company. Among the items that were taken up by the new Vandalia was the crossings near Reelsville. Money was set aside in 1907 to correct the problem. By the end of 1912 (October to be exact), the Brazil Daily Times was reporting that no such work had been completed to date.

Part of the plan in 1912 was to return the original National Road route to use. According to the same article in the Brazil Daily Times, this would cut 1/2 mile off of the route then in use through Reelsville. And, the railroad crossing situation, with its inherent dangers, would be addressed…and partially eliminated. But, as with other well laid out plans, this did not go to schedule. At all.

The National Old Trails Road, an Auto Trail that, through Indiana, mostly followed the original National Road used the Reelsville cut off when it was created. The old route was still out of commission at Big Walnut Creek. This situation would not be resolved until after the (second) creation of the Indiana State Highway Commission in 1919. ISHC surveyors were out in the field looking at ways to improve the situation at Reelsville, with the decision made that a bridge would be built in the same location that had been used over 80 years prior when the National Road, now called State Road 3, was built. The new bridge would be a concrete arch facility.

Even then, the new bridge for the National Road would take some time to get started. Over two years, as a matter of fact. Construction started on the replacement of the National Road in January 1922. The winter that year was relatively mild, allowing for construction to start very early in the year. But it was decided that the new route of State Road 3 would skirt the Pennsylvania Lines (the then operators, later owners, of what was the Vandalia Railroad) to the south, bringing the new National Road closer to the Big Walnut Creek.

Even then, the replacement route would only be in place for less than two decades. The Highway Commission made plans to make a true four lane highway across Indiana along what was then the US 40 corridor (which was original State Road 3 until the Great Renumbering of 1 October 1926). The new new road would take a straight course through the area south of Reelsville, the railroad and the old new path of SR 3/US 40. This realignment would occur in 1941.

Editor’s Note: This post took a long time to convince me to write. There are several subjects that I have been avoiding because they are MUCH better covered by others. In this case, my Co-Admin of the Facebook ITH Group, Jim Grey, covered it much better than I ever will. And, generally, he has done a great job covering the entire National Road. His post, “Puzzle solved: The National Road at Pleasant Gardens and Reelsville in Indiana,” served as the spring board for this post. The irony is that some articles that I posted in the ITH Facebook group led to the puzzles being solved for Jim. Such is the way of the world in this field. I recommend checking out Jim’s stuff when you get the chance. He is more of a road trip person, going out to see what’s on the ground. I tend to look more into the documented history of the same scenes.

Creation of the Whitewater Canal

27 January 1836. An act was passed through the Indiana General Assembly that would create what would become the Whitewater Canal. Talk of a canal had been circulating the Whitewater River valley since 1822 or before. It was 1822 when articles about such a canal were being published. Around this time, delegates from Franklin, Wayne, Union, Randolph, Fayette and Dearborn Counties held a meeting at Harrison to look at the possibilities of creating a canal.

The talk of a canal had progressed to the point that a survey was started in 1824. The original surveyor, a Colonel Shriver, passed away while performing this function. A Colonel Stansbury took over the job of surveying the potential route of a canal. But winter set in before he could really start work, and the survey was put on hold. Until June 1834. That was when a survey performed by William Gooding was completed. That survey routed the potential canal down the Whitewater valley from Nettle Creek, near Cambridge City, to Lawrenceburg.

Support for all things transport would heat up in 1835. Work began on a large internal improvement bill to build railroads, roads and canals throughout the state. This would be the known as the Mammoth Internal Improvement Act (MIIA) of 1836. This law would create several projects that would help form early Indiana…and help bankrupt it, as well. This one bill helped push the state to create a commission to write a new state constitution in 1851…one that forbade the state going into debt.

The MIIA would specifically create what would become the Whitewater Canal. It was mentioned in section one of the act. “The Whitewater Canal, commencing on the west branch of the Whitewater river, at the crossing of the national road, thence passing down the valley of the same to the Ohio river at Lawrenceburgh, and extending up the said west branch of Whitewater above the National road as far as may be practicble.”

Anyone that has looked at a map of Indiana will notice one minor detail. The Whitewater River doesn’t go to Lawrenceburg. It actually connects to the Little Miami River northeast of Elizabethtown, Ohio. Those that wrote the MIIA noticed this, as well. It was mentioned in the bill that “if the state of Ohio shall ultimately refuse to grant leave for the construction of that part of the Whitewater Canal which passes through her territory” a railroad should be built from Harrison (Ohio) to Lawrenceburg. That railroad would have to stay within the borders of Indiana.

A total of $1.4 million was set aside for the creation of the Whitewater Canal. The act also allowed for a connection between the Whitewater and Central Canals (the Central Canal would connect through Indianapolis) somewhere in Madison or Delaware Counties.

Section 16 of the MIIA allowed for the board of Canal Commissioners “to enter upon and take possession of, and use any singular lands, streams, and materials of any and every description necessary for the prosecution and completion of the improvements contemplated by this act.” This gave the Commissioners, and anyone assigned by them, the right to take whatever was necessary to complete the Whitewater Canal, and the other projects listed in the MIIA.

The original minimum dimensions of the Whitewater Canal were later determined to be at least 26 feet wide at the bottom, 40 feet wide at the top, and have at least four feet of water depth. This was, however, subject to increasing, if such increase could be done without increasing the cost of construction. The tow path was to be at least 10 feet wide, with the berm bank (opposite bank) being at least six. Both banks would have to have sufficient footing at the bottom to allow a slope of 21 inches for each 12 of height. And the two banks would have to be built two feet above the canal’s waterline. The total right-of-way for the canal would then total 63 feet from outside shoulder of one bank to the outside shoulder of the other.

By 1839, the first section of the canal, from Lawrenceburg to Brookville, was opened. The first boat, the “Ben Franklin” owned by Long and Westerfield of Lawrenceburg, arrived at Brookville on 18 June 1839. Two more boats, the Litlle Western and the Niagara, arrived the next day.

1840 found the state in bad financial shape. The canal had been completed from Lawrenceburg to Brookville, and half of the work from Brookville to Cambridge City had been completed. This cost the state, to that point, $664,665. It was at this point all work on the projects listed in the Mammoth Internal Improvement Act was discontinued.

The Board of Internal Improvements, the government agency tasked with completing all of the MIIA projects, was abolished in January 1842. The plan was to move those projects from public works to private companies. The same month, on 20 January 1842, the Whitewater Valley Canal Company was chartered. The state then turned over all property involving the canal to the new company. The new company was to complete the canal to Cambridge City and receive, as compensation, all revenues from tolls, water power, rents and other incomes for 15 years after the completion of the project.

The canal slowly increased its length. By 1843, it had reached Laurel. Connersville became an active canal town in 1845. The end of the line at Cambridge City would be reached in 1846. The Whitewater Valley Canal Company spent a grand total of $500,000 to complete the original scope of the canal’s purpose.

Unfortunately, the hopes that the canal would prove a boon to the area were dashed relatively quickly. Most of the problems stemmed from bad engineering. By 1848, two aqueducts were swept away, and several feeder dams were nearly destroyed. Once fixed, navigation began again…lasting a year until the normal Indiana floods caused suspension of canal traffic once again.

The canal was put back into operational shape for a time. But things didn’t go well for the company that continued to lose money on the enterprise. It all came to a head on 26 November 1862 when the Cincinnati & Indiana Railroad Company took over the property under Indiana’s condemnation laws. The canal’s receivers were paid $55,000 for the property, and the railroad became the owner of the old canal. All property of the canal company within the state of Indiana would be deeded to the railroad. Ultimately, the railroad would become the White Water Valley Railroad, a part of the Big Four and the New York Central.

Madison Avenue Expressway

In the early 1950’s, much had been done to help with traffic issues throughout the city of Indianapolis. With the exception, as pointed out by the Indianapolis News Editorial Staff on 21 June 1954, of the south side. But things were going to be changing soon. The Indiana State Highway Commission decided that there will be another upgrade to US 31 in the state. This time, in the city of Indianapolis on the south side. But many things not only had to come together to do this project, many controversies were unleashed with the project, as well.

First mention of the project, at least in the newspapers, came in August 1953. The Indianapolis News of 6 August 1953 covered the project on page 23. The $3 million project would lower the roadway of Madison Avenue, at the time US 31, some 20 feet to allow for the road to pass under the Pennsylvania Railroad’s Louisville line and the Indianapolis Belt Railway. A large chunk of the money for the project was to be paid out for the acquisition of properties in the 15 block project area. However, most of the coverage in that day’s News was the fact that the State Highway Commission was creating a “District of Dead Ends.” Apparently, the original plan was to start at Morris/Prospect Streets, working south. It was later decided that the work would begin at Terrace Avenue, leaving that street connected to Madison Avenue at the north end of the project.

However, from Terrace to the Indianapolis Belt Railway, no less than six streets were going to be cut in two. Palmer, which actually connected to Madison Avenue at the Pennsylvania Railroad crossing was sure to be removed. Lincoln would be cut off at the Pennsylvania Railroad. Both Minnesota and Iowa would be truncated, as they both crossed Madison in a straight line. Caven did a stutter step type crossing of the state highway. Adler ended at Madison, just north of the Belt. South of the Belt, LeGrande Avenue stutter stepped its way across Madison Avenue, as well.

While the expressway was the major part of the project, that wasn’t the entire scope. From Southern Avenue, one half mile south of Raymond Street, to where Madison Avenue becomes Delaware Street near what was Wilkins Street (now the I-70 overpass), the road would be widened to a six lane facility. Right-of-way would be purchased on opposite sides of the road, with the section from Southern to Pleasant Run Parkway, and from the Pennsylvania Railroad north to Delaware Street being taken from the east side of the street. Between Pleasant Run Parkway and the PRR, the west side would be taken for the project.

A look at a satellite image of the area today shows exactly how much property was taken in each section. The new Madison Avenue is actually west of Old Madison Avenue. (Old Madison Avenue is one of the very few roads in Marion County that includes a hint that it used to be an important facility. And even then, this only occurred when the new street signs started showing up around the year 2000, because prior to that, the street was officially called “Madison Avenue.”) The old road, which sits along the top of the hill that was created with the new road, is in two sections, the the old Belt Railway crossing removed, connecting where Iowa Street was to Raymond Street. All of the property from the old road to the alley between Delaware Street and Madison Avenue was taken for the new canyon expressway.

As an Indianapolis history aside right here, one of the most famous restaurants on Indianapolis’ south side, the Key West Shrimp House, existed in this section of Madison Avenue. It was half way between LeGrande Avenue and Raymond Street (2138 Madison Avenue). By 1955, due to pending construction, it had moved to its more famous location, 2861 Madison Avenue. Almost anyone, of sufficient age, can tell you about the pink building on Madison Avenue that once housed the Key West. Now, they still have a location…at the other end of the road – in Madison, Indiana.

Not only was the road going to be part of the project, in October 1953, it was announced that the ISHC was going to take a “pedestrian census” to see whether a pedestrian bridge would have to be built somewhere in the project area. Plans were to have pedestrian crossings at both Terrace and LeGrande Avenues. However, the project removed the LeGrande Avenue crossing when the construction was completed. The only true pedestrian specific accommodation made in the project area would be a walking bridge crossing at Palmer Street.

Contracts for the first phases of construction of the new Madison Avenue were announced in May 1954. And while the south side of Indianapolis had always been hampered by narrow roads and railroad crossings, causing it to lag behind the rest of the city, it wasn’t long until newspaper editorial staffs began to realize what was about to become a real problem. The Indianapolis News Editorial of 21 June 1954 spelled it out quite succinctly: this is gonna get bad. “Of course, the Madison Avenue expressway is coming – but there will be a crisis for the south side motorists before the expressway is completed.” With the pending closure of Madison Avenue during construction, something that could last up to two years, an already strained city traffic system would be stretched to the limit. And most of that traffic, according to the thoughts of the Indianapolis News, through Fountain Square. “Cars pile up along Shelby, Virginia and Prospect trying to get through the area. This goes on morning, noon and night.” “One improvement has been made. Woodlawn has been straightened and widened between Virginia and Shelby. But the project primarily has provided more parking space and does not help move traffic.”

It would be in December 1954 that the state announced a change in the construction plans. The original idea was that Prospect and Morris Streets would connect to Madison Avenue as they always had, as shown in this snippet from a 1915 map of Indianapolis. Morris crossed straight over Madison Avenue, with Prospect being almost one block north. It is important to note that both these streets are important arteries in Indianapolis traffic. And, they are survey roads, meaning that their location is along a survey line. (That line is Morris Street west of Shelby Street, and Prospect west of it. Shelby Street is a survey correction line, so every street corrects to the north at or near Shelby Street on the south side.) It was announced that the state would create an underpass for Morris Street, with connecting facilities to allow traffic access to Morris and Prospect Streets. As it turned out, east bound Prospect Street became a very long ramp to allow northbound Madison Avenue traffic access to west bound Morris Street. In the same vein, a slightly moved westbound Morris Street became the eastbound Morris to northbound Madison ramp.

This change, along with the grade separation at Raymond Street that had been announced the previous August, were recommended by the United States Bureau of Public Roads, which provided half of the funding for the project. These two changes added over $1 million to the entire project. Construction on the Madison Avenue expressway was “probably” going to start in 1955. But plans for the new changes hadn’t even been worked out as of the announcement, so no one was quite sure of that.

June 1955 saw the start of getting rid of “the old Shrimp House, 18 homes, and an undisclosed number of garages near Raymond and Madison.” The state would be auctioning off the properties on 28 June 1955. Those properties would have have to be moved within 30 days of the auction. The same day that the auction was announced, it was also mentioned that construction was expect to begin that summer. As it turned out, November 1955 came news that the construction would begin in 1956, as contracts had just been awarded for the project.

That didn’t apply to other locations along the project area. It was announced that the new Madison Avenue bridge over Pleasant Run would be opened to traffic on 29 July 1955. The plan was to open four lanes of the six lane span that day. Since Madison Avenue had been closed, at this point, for almost a year, traffic had been slowed to a crawl anyway.

Indianapolis News, 25 September 1956, showing construction of the Madison Avenue expressway at the Indianapolis Belt Railway.

Another sticking point with the local news media, especially the Indianapolis News, was the lack of security when it came to all the old buildings that were being removed in the construction area. This was especially apparent when it came to the fact that there were three schools in or near the construction zone: School 31 on Lincoln Street east of Madison; School 35 at Madison and Raymond; and Manual High School at Pleasant Run and Madison. There were a bunch of buildings that looked like tornado damage, and more than fair share of basements that were just open to the public without any protection whatsoever.

The article to the left, which was published on 22 March 1956, shows the opinion of the Indianapolis News, and the parents of students in the area. Especially at School 35.

Indianapolis News, 25 September 1956, showing the construction area on Madison Avenue, and expressing the Indianapolis News’ concern about the safety of children in the area. An exact location of this photograph has not been determined, but not for lack of trying.

All wasn’t roses on the ISHC end, either. I will cover it in a later post, but irregularities were exposed in 1957 when it came to property acquirement for the Madison Avenue Expressway project. These irregularities were exposed in April 1957, and found itself in court the following October. It involved someone making a ton of money from real estate purchases and sales in 1954 and 1955. Part of the problem was that these types of shenanigans caused the delay of construction, and hence, an extension of the traffic nightmare on the south side of the city. It was, in June 1957, projected that construction would be completed by September 1958.

That construction projection would be close to true, as the 1959 Indiana Official Highway Map cover shows. The new Madison Avenue Expressway was shown in its brand new, completed, status. But even with the completion of the project, the controversy remained. Stanley T. Siegel, Indianapolis traffic engineer, stated, according to the Indianapolis Star, that the project is a “beautiful road that starts nowhere and leads to noplace.” Mr. Seigel took a lot of criticism for that opinion. The problem is, on the surface, he is absolutely right. What he didn’t take into his consideration is the removal of a narrow, overcrowded street (now Old Madison Avenue), and the constrictions placed on it by two busy railroad crossings (which, at the time, they were very busy), and made a better connection with a very busy United States highway running through south central Marion County.

The Expressway would be completely opened to traffic officially on 23 September 1958. It would still be technically closed for another week for curbing and other details, and the interchange at Morris/Prospect Streets would not be ready for several more weeks after that (for railroad elevation just west of the interchange). The project would cost almost $8 million, more than twice the original estimate. It was also announced that the State Highway Department had plans to extend the expressway another 10 miles. This extension would be along State Road 431, also known as Madison Avenue, in the non-bypassed sections of the old road.

Bicycling the Brookville Pike

Today’s Bicycling Thursday will be focusing on a road that, while named the “Indianapolis-Brookville State Road” when it was created, never actually connected directly to the capital city. Its end was actually just shy of three miles east of the Circle, as shown in the post “The Indianapolis end of the Brookville (State) Road.”

The start of this trip is along the National Road, which in 1896 was also called the Irvington Pike. Just past the Indianapolis Belt Railway, a road turns to the south. This road now runs behind the shopping center at Sherman Drive and Washington Street. As shown in the above mentioned post, the original road crossed the railroad tracks (at the time the Junction [B&O] and Panhandle [PRR]) at a very strange angle and at grade. At this location was an old railroad station on the Junction called Stratford.

The road then continues in a straight line to the east-southeast toward the county line. The Junction Railway runs in a parallel path to the old road just to the north. The Brookville Pike skirts the south edge of Irvington. From there, the road continues on its straight line journey crossing the Noblesville-Franklin State Road near the village of Fenton. The only jog in the road in Marion County occurs between the Bade Free Gravel Road (Bade Road) and Franke (German Church Road).

There is a hill (described as “a short, sharp pull going eastward, and a longer pull, if going west”) just west of the village of Julietta. After that, the Pike becomes relatively flat to New Palestine. On the east side of that town, the road drops into the valley of Sugar Creek. After climbing out of the valley, it again becomes flat again to Fountaintown.

The route in the article in the Indianapolis News of 10 April 1896 was actually submitted by a reader of the newspaper. The route was a 47 mile trip out the Brookville Road to Fountaintown, north to Greenfield along what would become the Riley Highway, then back to Indianapolis via the National Road.

Indianapolis and Its Decoration Day Race

If there is one thing that Indianapolis is known for, it is racing. Oh, yes. Almost anyone in the WORLD would respond “Indianapolis 500” if you mention the city. Memorial Day weekend has become a time when the population of the city doubles and triples, with all of the visitors coming to watch “the Greatest Spectacle in Racing.” But the subject of this post isn’t something related to a farm field with a large rectangle with curved corners in Speedway. As a matter of fact, the subject article of this post dates from the Indianapolis News of 23 May 1896, some 13 years before that other race started.

Before it became known as Memorial Day, 30 May of each year was known as Decoration Day. The holiday floated depending on the location of 30 May on the calendar. It was declared a Federal Holiday in 1868. In Indianapolis, the end of May signified, among other things, the end of the “rainy season,” otherwise known in the rest of the world as Spring. The weather starts getting drier and hotter right after Decoration Day. So it made almost perfect sense to use that holiday as a day to get together to watch a race.

Indianapolis News, 23 May 1896. This map shows the route of the annual Decoration Day Bicycle Road Race of 1896.

The Indianapolis Cycle Club and the Cycle Board of Trade put together the annual Decoration Day Road Race through the streets of Indianapolis. At the time of the source article, thirty men were in the list of racers. Those racers, unlike previous years, weren’t all from Indianapolis. Entries would be taken until 26 May, the following Tuesday. It was estimated that seventy-five to one hundred riders would be at the starting line when the race kicked off. Batches of racers would be set off on the 13.625 mile course at intervals of one minute.

Prizes for the race, due to its amateur status, could not include money. But there were 38 prizes to be given to the riders. The rules state that each rider is only allowed to win one prize. Prizes include four different bicycles, tires, suits, caps, hats, electric lantern, a Kodak, fishing rods, shoes, lamps, golf hoses, sweaters, luggage and a speed indicator. These prizes came from merchants across the city. Carl G. Fisher, future creator of the Lincoln and Dixie Highways, and his bicycle store donated two sweaters, a pair of shoes, and a “speed indicator.”

The course was chosen due to the relative good condition of the route. “It is probable that not another road race will be run on Decoration Day throughout the entire country on a finer course than the one which will be used here.” There are a few bad spots along the way, but they are few and far between.

The race started at the corner of Meridian and 14th (now 21st) Streets , heading north to 30th (now 38th) Street. Here it turned west one block to follow Illinois Street, which since it was outside the city limits at the time, was called the Indianapolis and Westfield Road (which is now Illinois Street and Westfield Boulevard to Broad Ripple). From there, it followed what is now Broad Ripple Avenue to the Fall Creek and White River Gravel Road (now called Keystone Avenue). South along the Fall Creek Road, the course then turned southwest onto the Allisonville Pike (now Fall Creek Boulevard). The Allisonville Pike went as far as what is now 38th Street, with the Allisonville name being used across that numbered street. The route then turned south on Meridian Street at 30th, going back to the starting point at 14th.

A three block stretch of asphalt starts, and finishes, the course. Two bad street car track crossings, one at 26th (34nd) Street and the other at 28th (36th) Street, are encountered. From the Fall Creek bridge to 30th (38th) Street is “one of the worst spots along the whole course.” Potholes and loose gravel make this section a rough going. Turning at 30th (38th) Street gets interesting, with a wooden culvert to be crossed, with boards at one end being lose. Three-eighths of a mile after turning onto Illinois Street riders will encounter a small rise. Further along Illinois Street requires crossing a wooden culvert, a small wooden bridge and climbing a 200 yard long, fairly stiff hill. “This hill stops just beyond the carriage entrance for Fairview Park (now the location of Butler University).” This entrance would be at what is now 46th Street. From here, for the next one-half mile, is a gradual down grade. At the canal, the route drops along a steep grade for about 100 yards.

“Some riders may seek to cross the canal and take advantage of the cycle path, but this will not be allowed.” The first quarter mile along what is now Westfield Boulevard is reported in excellent condition. Then comes 300 yards of horrible conditions, including potholes on both sides of the road. After that, fresh gravel with wheel tracks already in place on each side of center.

At Broad Ripple, the course encounters the Monon tracks and follows the street car tracks along what is Broad Ripple Avenue (previously 62nd Street). The Broad Ripple section is reported as being the worst section of the entire course. One of the best parts of the route is along the Fall Creek and White River Road. “Men who are still in the hunt will be able to come down this road at a lightning clip.” This road runs along the west border of Malott Park (at what is now 52nd Street), and just south of the village is the crossing of the Lake Erie & Western Railroad (Nickle Plate). (As an aside, the street that runs along the railroad tracks is now called Erie due to the name of the railroad company. This is common throughout Indianapolis.)

A turn onto Allisonville Pike (Fall Creek Boulevard), the LE&W tracks are crossed again near 38th Street. Then the course, still following the old Allisonville Pike turns west along 38th Street until Meridian Street, while the Allisonville Road turned south on what is now Central Avenue. The Monon tracks are crossed again on the west side of the Fairgrounds. At Meridian Street, the repeat of the conditions encountered on the way out happens. To avoid having racers cutting across the course, checkers were located at each cross street. “If the race is at all close, there will be a great sprint from Fall Creek to the tape.”

Racing, it seems, has been a part of Indianapolis’s Memorial Day for much longer than the creation of the Indianapolis Motor Speedway, which included a partner that provided prizes for this race.

** edited 06/03/2021 by Paula Trefun Simpson to note that the ‘canal’ mentioned was the Central Canal

Bicycling the Crawfordsville Pike

Indianapolis News, 09 May 1896, map showing “the Crawfordsville Route.” It should be noted that the “PCC&StL” notations on this map along the railroad tracks from Indianapolis to Danville and Indianapolis to Crawfordsville should read “CCC&StL,” as these are Big Four (NYC) tracks, not Panhandle (PRR) tracks.

Keeping with the Indianapolis News articles about bicycling routes from the city, today we focus on the Crawfordsville Pike, from the News of 09 May 1896. For starters, the Crawfordsville Road was built in the 1820s as the Indianapolis-Crawfordsville Road. It wasn’t the straight route that exists today. Marion County’s section was covered here. Outside Marion County, what became the Peoria & Eastern/Big Four/New York Central was built to dart back and forth across the original road. This was typical of railroad companies at the time, since road travel was sketchy most of the time.

Editor’s note: For those unfamiliar with the work “pike” in this context, here goes. “Pike” is a shortened version of the word “turnpike,” which was a term used to describe a toll road. At points where a toll was to be paid, a large stick, or pike, was put across the road. Once the toll was paid, the toll collector would turn the pike, or move it out of the way for passage.

The bicycle route recommends following, from the Circle, Illinois north to Indiana, Indiana out to Michigan, and Michigan Street out to Haughville. “At the second street beyond the river bridge” the rider should turn north. This is now Belmont Avenue. Belmont took the rider to, and along side, the White River. At the time, the White River Parkway did not exist. Continuing north meant meeting the junction of the Crawfordsville and Lafayette Roads at what is now 16th and Lafayette, although the connection was moved south to allow replacement of the intersection in the 1950s. (Being the parts of US 52 and US 136 at the time, the state made the decision to revamp the area.) The area is shown on the map below. Best described in the News, the bicyclist should “turn and go to a point where the road forks, one branch running north and one west. The west fork is the Crawfordsville pike.”

1889 Map of the area of what is now 16th Street and Lafayette Road. Grandview Street at the bottom of the snippet is 10th Street today. Crawfordsville Gravel Road is 16th Street. The city limits line on the right runs through Belmont Avenue. The bridge over White River, called the Emricksville Bridge, connected the old Crawfordsville/Lafayette Road to downtown to the same roads west of the river. That bridge was named after owners of the land in the area. Image courtesy of the Indiana State Library Digital Collection.

From here, the original road followed what is now 16th Street out to Cunningham Road northwest to (just shy) of what is now Crawfordsville Road. From this point, the old road “runs close to the Peoria & Eastern tracks most of the distance to Brownsburg, passing through Clermont and crossing the tracks twice. This stretch of road is almost level. There are only two small hills.” After Brownsburg, the road is level to Pittsboro. “Any lover of beautiful scenery who is the happy possessor of a camera would do well to take the extra trouble” to bring that camera along.

This changed once past Pittsboro. “From Pittsboro the road is devoid of unusual features, with the exception of a rather long hill about a mile and a half before reaching Lizton.” The writer of this article actually had some advice about this particular hill. “A little caution should be observed in taking this hill, and none but those having accident policies, with all premiums paid, should attempt coasting.” I guess that’s subtle.

1909 map of northern Hendricks County showing the route of the Crawfordsville Pike from Brownsburg to the county line northwest of Lizton. Snippet courtesy of the Indiana State Library Digital Collection.

Here’s where a little historic research is needed. The News states that “the railroad is again crossed before reaching Lizton. From this town the road leads north about three-quarters of a mile, then forks. The west fork should be taken.” According to maps of the era, like the 1909 shown above, the railroad crossover is west of Lizton by one mile. And that crossover is just about 1/2 mile north of the turn in the road. The road then follows closely the railroad on the north side of the tracks. This continues to just before the Boone-Hendricks County Line southeast of Jamestown.

The road crosses back over to the south side of the P&E tracks before leaving Hendricks County. After Jamestown, the road gets “more hilly.” It is also stated that if you have your camera, “at Raccoon creek the camera ‘fiend’ may again find scenery worthy of his instrument.” Before entering Montgomery County, southeast of New Ross, the road once again crosses the railroad tracks. The road here is still in place, with the exception of the bridge over the Big Raccoon Creek. The described trip uses what is now State Street entering New Ross, and follows that street, and the county road continuing from there, to the current US 136. All this time, the road is north of the P&E tracks.

From New Ross to Crawfordsville the route curved quite a bit, before entering the Montgomery County seat. “Crawfordsville is quite a bicycle town, and contains many riders. The wheelmen make it a point to be very courteous to visiting riders.”

A big goal in the early days of bicycling is called “the Century,” a 100 mile trip in one day. The article goes on to mention that following the Crawfordsville Pike from Indianapolis to Crawfordsville and back “will give the rider almost a century.” The article also mentions a more hilly route back to Indianapolis via the Rockville road, which “will make a ride of 110 miles.”

1896: Bicycling to Noblesville

In April 1896, as part of the Indianapolis News series of articles concerning bicycle routes from Indianapolis, it is pointed out that “the trip to Noblesville seems to be a favorite ride for Indianapolis wheelmen this season.” The route is listed as being in fine condition, as long as you don’t completely follow the Allisonville Pike.

At the time, the Allisonville Pike was a rerouted version of the original Indianapolis-Fort Wayne state road, at least through most of the city itself. The original road used Central Avenue to Sutherland Avenue, winding its way to the old 39th Street bridge across Fall Creek to follow Fall Creek and Allisonville Road north through the county. The reroute went straight up Central Avenue to Maple Road (now 38th Street), then follows Fall Creek to connect at the 39th Street bridge with the original route.

The conditions of the road to Noblesville were kept in very good shape over the years. It was a very popular route. “There are some fairly stiff hills on the route, but they are all fit for coasting, an the riders can afford to do a little turn on foot after the exhilarating effect of a mile a minute a clip down a steep grade.”

The newspaper article mentions three methods of reaching what is, now, Allisonville Road. First, the paper points out that while the road is in excellent shape, the section of Central Avenue above Fall Creek is not. Which leads to the second point, which is the recommendation to use Meridian Street north to Maple Road, then east to the State Fairgrounds. The third point is that another popular way to get to the Allisonville Road is to follow College Avenue north then skirting Fall Creek using the Millersville Road to the bridge opposite the fairgrounds. That bridge, at this time, is at 39th Street. This last route is “probably the most satisfactory way to reach the road.”

“The Allisonville pike turns northeast in passing the Fair grounds, and for a mile follows Fall creek. Just at the upper edge of the Fair grounds it crosses the L. E. & W. (Lake Erie & Western) tracks.” Those railroad tracks would later become the Nickle Plate formerly used by the Fair Train. Near where Keystone Avenue is now was the location of “one of the most picturesque spots along Fall creek,” or Schofield’s Mill. There was also an old dam just upstream from the mill. The old dam is still there, of sorts. There is also a newer dam basically under Keystone Avenue.

Where Keystone Avenue is now, the road is described as “White river and Fall creek gravel road.” It is opposite of Hammond’s Park, described as “one of the prettiest spots of natural scenery about Indianapolis.” The White River and Fall Creek Road ran through Malott Park and within a quarter mile of Broad Ripple Park, at least according to the News.

Back to the Allisonville Road, 1.75 miles north of Hammond’s Park is a dirt road connecting Malott Park to Millersville. That road, described as both a popular route for bicycle riders and one of the best dirt roads in the county, is now 56th Street. Shortly north of that road, the Pike crossed the L. E. & W. tracks again before a good condition dirt road leading to Broad Ripple Park and Broad Ripple. That road is now 62nd Street.

For the next two miles above the Broad Ripple road, the route is described as “very undulating” road. The Pike then drops into a valley and crosses a small stream before, at the 2.5 mile mark, it enters the village of Allisonville. From Allisonville, a road leads to the west to Dawson’s Bridge and Nora, and to the east leads to Castleton. That road, at the time called the Andy Smith Pike, now is called 82nd Street. Half a mile north of there was a dirt road (now 86th Street) that lead east to the village of Vertland on the LE&W tracks.

Before leaving Marion County, and entering Hamilton County, the old road climbed one of the biggest hills on the entire route. After crossing the county line, the next major crossroad (now 116th Street) connected the Allisonville Pike to Fisher’s Station on the LE&W railroad. From there, it was five miles to the destination of Noblesville.

The article, like the one I posted about the Michigan Road, mentions a route to get back to Indianapolis. In this case, it would be the Westfield Road. I will cover that in a later entry.