1959 – Interstate Contract Bids

When the interstate system started being built in Indiana in the late 1950’s and early 1960’s, contracts for building those roads started flying fast and furious. The interstate system came into being in 1956…and the first contracts were finally let in 1959. The Indianapolis News of 29 May 1959 reported all of the contracts that were let to that point.

First four miles of Interstate 465: “Low bid for construction of the first 4 miles of Interstate 465, the new belt highway to encircle Indianapolis, has been submitted by an Evanston (Ill.) firm. The construction contract also will include the building of 1 1/3 miles of Interstate 65 – the Indianapolis-to-Chicago expressway – northwest of Indianapolis.”

One of the things that keeps coming up when it comes to the interstates, their designations and their contracts is the actual name for I-465. Legally, that’s what it was, Interstate 465. However, for many years, until the interstate was done, or even beyond, the news media would not only refer to it as Interstate 465, but as the New State Road 100. A lot of people at the time simply saw it as a replacement for SR 100, which it was. This was also brought on by the fact that the original contracts from the state had project numbers for both roads.

This contract covered I-465 from a point north of US 136 to West 62nd Street. It would run west of High School Road through the area. The section of Interstate 65 included in this contract would run “parallel with and west of U.S. 52, from just northwest of West 65th to just southeast of High School Road.” The bid for this contract was $2,257,679.81.

The same company won the $1,705,758.49 bid to construct Interstate 74 from SR 267 in Brownsburg to just east of the Hendricks-Marion County Line. This 4.5 mile section of what the News referred to as the “Indianapolis to central Illinois expressway” would be built north of US 136.

As is typical of the way Indiana bids contracts for road projects, bridges and roads are bid separately. The above contracts did not allow for bridges…just the approaches. Bridges would be bid usually earlier than the road.

The first new Ohio River bridge linking Indiana and Kentucky in 30 years was let on a bid of $994,979.58 to Roy Ryan & Sons of Evansville. “The bridge will be double-decked, with three lanes of one way traffic on one level and three lanes of one way traffic on the other level.”

Three bridges were let on the Interstate 74 project mentioned above. Ruckman & Hansen, Inc., of Fort Wayne, won two of them. $187,129 for the bridge over Big White Lick Creek west of SR 267, and $219,553 for the bridge over SR 267. Carl M. Geupel Construction Company bid $218,712 to build a county road bridge over Interstate 74, 1.2 miles southeast of SR 267.

These were among the first contracts to be let on the new Interstate highway system in Indiana. Many more would come.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s