Bicycling Indianapolis

In 1896,the Indianapolis News published a series of articles about bicycling in and around Indianapolis. That series of articles is what I have been using to create these “Bicycling Thursday” series of posts here at Indiana Transportation History. These articles generally have covered riding different roads, usually old state roads, leaving Indianapolis. I will include links to all of those below. But this article is about something different. There was a proposed bicycling route that covered quite a bit of the north side of the city and Marion County.

Today’s information comes from the Indianapolis News of 14 March 1896. This plan was to be financed via the sale of subscriptions, much like the way that roads were paid for before this, and how Auto Trails, starting in the 1910’s, were going to be financed afterwards. Most of the route wouldn’t use roads in place. Where it did use roads, it would be built along side that road. Most of the route would make use of riding on the banks of water courses through the county.

Proposed bicycle route through Indianapolis and Marin County as described in the Indianapolis News of 14 March 1896.

The potential route started along Indiana Avenue in downtown Indianapolis. It would follow that road to where it crossed Fall Creek. It is mentioned in the News that the condition of Indiana Avenue, at that time, from West Street to Fall Creek, is such that “no worse road was found in going over the entire course than in this street.” The path would then follow the levee along the north bank of Fall Creek “south of the new pumping station of the Water Company.” The proposed route would continue along Fall Creek, then the east bank of the White River until crossing the Indianapolis Belt Railway. Here, the bicycling route would join the Crawfordsville Free Gravel Road until that road crossed the White River. The Crawfordsville Free Gravel Road is now Waterway Boulevard (after having been named Speedway Avenue), and it crossed the river at the Emrichsville Bridge, later replaced by the current 16th Street bridge.

The proposed path would then continue to follow the White River until after it crossed the “Flack Pike,” now 30th Street, passing “many giant sycamores, winding in and out with the deviation of the stream.” Just north of the Flack Pike the river and the Central Canal come close to one another, where the proposed route would switch over to the tow path along the north bank of the canal on its way to Broad Ripple.

“The ride up the tow-path every wheelman and wheelwoman in the city is familiar with – its beauties, its dangers and it tribulations often.” It is described as a beautiful ride. However, washouts, gullies, chuck holes and soft spots are common along the way, “and a sudden dip into the canal has a most dampening effect on enthusiasm.” The tow path continues through Fairview Park, now the site of Butler University. There is a fairly steep climb before the path would cross Illinois Street. Here, a bicycle rider could choose to use either side of the canal to get to Broad Ripple. But the official route would continue along the north tow path.

At Broad Ripple, the path would follow the Westfield Pike north past the Broad Ripple damn and across the White River on a large iron bridge. After crossing the river, the path then turns south to follow the river along the north/west bank to a point where it crosses White River again at what is now the 82nd Street crossing after passing the Haverstick Farm. After crossing White River, it would follow what was then the Fall Creek and White River Free Gravel Road (FCWRFGR) back towards the city. The first part of that free gravel road doesn’t now exist above what is now 79th Street. From there, it is known as River Road to the point where the FCWRFGR turned south on what is now Keystone Avenue.

The new path would be built along the FCWRFGR until it got to Malott Park, at what is now 56th Street. The route would then turn east “on the dirt road from Malott Park to Millersville.” It is mentioned that this dirt road is very narrow in places, with “scarcely room on either side for the path.” Here, the builders of the route hadn’t decided whether to follow Fall Creek’s north bank or the Millersville Free Gravel Road and the south bank of Fall Creek to Meridian Street. Here, riding down Meridian Street would bring rider back to downtown Indianapolis, and the point where the route started.

Some of the path, as described, has, in more recent times, been added to the Indy Parks trail system. It starts on what is now the White River Trail. It then crosses over to the Central Canal Trail above the old Riverside Amusement Park north of 30th Street. At Illinois Street, where the rider in 1896 had two choices, the path chosen by Indy Parks runs along the opposite bank of the Canal than was chosen to be followed then. Most of the rest of the route, that can still be traveled, can be followed by using the streets that exist now. There are a few places where this can’t happen.

The following is a list of the other entries in this “Bicycling Thursday” series.

Indianapolis and Its Decoration Day Race
Allisonville Pike (Allisonville Road to Noblesville)
Crawfordsville Pike (Old Crawfordsville Road to Crawfordsville)
Madison Road (Madison Avenue from Southport to Indianapolis)
Michigan Road North (MLK/Michigan Road north to Augusta)
Michigan Road South (Southeastern Avenue)
National Road West (Washington Street west to Plainfield)
Pendleton Pike (Pendleton Pike to Oaklandon and beyond)
Reveal Road (Dandy Trail through Eagle Creek valley)
Rockville Road (Old Rockville Road from Danville to Indianapolis)
Shelbyville Road (Old Shelbyville Road from Indianapolis to SE Marion County)
Three Notch Road (Meridian Street south to Southport Road)
Westfield Road (Westfield Boulevard and Illinois Street from Westfield south)

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s